quadient meter User guide

Type
User guide
iX-3 Series
Meter Replacement
Guide
A1. Remove the Meter From your Original Mailing System
Turn o the mailing system by
pressing the power switch.
A2. Unpack your Replacement
Remove replacement meter from box and place
original meter back into box and prepare for return.
1
A3. Insert the Meter
OK
Swap meter
This procedure allows to install
your new meter in the machine
Once the mailing system is powered on, follow the
steps on the screen to complete the swap process.
Turn on the power to mailing system
by pressing the power switch.
A4. Switch On the System
Congratulations Your mailing system is ready to use!
1. Lift the cover of the mailing system.
2. Lift the cover of the meter bay.
3. Remove the meter PSD.
A0119153/B - 13/02/2020
Place the meter into the meter bay (b) and slide in until it fits securely
into position (c). Close the meter bay and the mailing system cover.
The meter
serial
number
is located
here
For more information or if you experience any issues
please visit :
kb.quadient.us/ix3
C
  • Page 1 1

quadient meter User guide

Type
User guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI