JADEMAR LIGHTING Jbl-Cps Series User manual

  • Hello! I'm here to assist you with the JADEMAR JBL-CPS CCT & Power Selectable Bollard installation. I've reviewed the provided instructions, which cover preparation, mounting, wiring, and maintenance. Feel free to ask any questions you might have!
  • What should I do before starting the installation?
    Who should install this equipment?
    What should be checked before installation?
Risk of electric shock--Disconnect power to equipment before installing or servicing.
This equipment must be installed according to all applicable codes & ordinances.
Installaon and service of this equipment must be performed by qualified service personnel.
Read these instrucons before installing, servicing or maintaining this equipment.
Save these instrucons for maintaining and servicing.
The installer must ensure that the foundaon is stable and can support the luminaires weight.
The Installer must use proper means to secure the luminaire to the ground.
WARNING BEFORE YOU BEGIN READ THESE INSTRUCTIONS COMPLETELY AND CAREFULLY.
JBL-CPS SERIES
INSTALLATION INSTRUCTIONS
WWW.JADEMAR.COM
Miami, FL USA - info@jademar.com
T: 305.640.0465 - F: 305.640.0468 Revised 07/2023
Page 1 of 2
FOR
HAZLOC
1.0 INSTALLATION INSTRUCTIONS - PREPARATION & INSTALLATION
JBL-CPS SERIES CCT & POWER SELECTABLE BOLLARD
Step 1: Remove the luminaire (Figure 1) and accessories (Figure 2) from the carton and
inspect luminaire for damage. Do not install a damaged luminaire.
Edges may cut--wear gloves while handling or servicing this equipment.
Inspect equipment for damage from shipping and handling.
Recommended cleaning substances:
Wipe off dust with a dry, so cloth. Remove greasy spots etc. with a so cloth dampened in lukewarm water (<122°F/ 50°C) with a mild detergent.
Never use detergents containing abrasives and solvents.
Warning: Scouring powder and similar substances will scratch surfaces.
CAUTION RISK OF FIRE, ELECTRIC SHOCK, INJURY OR PROPERTY DAMAGE
Bollard Fixture
Figure 1
Anchor Bolt Carrier
Nut
Flat Washer
Spring Washer x3
Figure 2
Figure 4
1-1/2~2”
Figure 3
Step 2: Prepare site. Get the anchor bolt carrier assembled as (Figure 3) and use it to
determine placement of anchor bolts in concrete. Ensure that concrete base is suitable for
the bollard load. Install three anchor bolts into concrete as per aached drawing, having at
least 1-1/2~2” protruding from concrete with threads free and clear of debris and dirt.
(Figure 4)
hex wrench
Figure 6 Ground
Figure 5
Step 3: Dis-assembly the fixture by loosening the set screws x3 with hex wrench. (Figure 5)
Lay the fixture down by the side of the installed anchor bolts. Keep the wires connected.
(Figure 6)
5 Port Terminal Block
Ground Supply Wire
Support Bracket (12inches)
Concrete Base
(by others)
Electrical Conduit
(by others)
L
N
G
Dim-
Ground
Figure 7
Step 4: Place bollard base plate over anchor bolts and ghten nuts securing the base plate
to the foundaon. As the wires shown on (Figure 7) will not be disconnected during
installaon, so please double check to make sure they are in good connecon aer the
base installaon.
2.0 INSTALLATION INSTRUCTIONS - BOLLARD ANCHOR BOLT GUIDE
Step: 5 Put back the fixture body, and ghten the set screws x3 with hex wrench. (Figure 8)
Figure 10
Supply Line
Supply Neutral
Supply Ground
0-10V Dim+
Black Wire
LED BOLLARD
0-10V Dim-
White Wire
Green Wire
Purple Wire
Gray Wire
Figure 9
12W
16W
22W
3000K
4000K
5000K
Labels
Loosen 4 screws,
open the top of the fixture
Figure 8
DIAL SWITCHES DIAGRAM
WIRING DIAGRAM
JBL-CPS SERIES
INSTALLATION INSTRUCTIONS
WWW.JADEMAR.COM
Miami, FL USA - info@jademar.com
T: 305.640.0465 - F: 305.640.0468 Revised 07/2023
Page 2 of 2
FOR
HAZLOC
JBL-CPS SERIES CCT & POWER SELECTABLE BOLLARD
/