Overland Storage Neo Series 2000 User manual

Category
Tape auto loaders & libraries
Type
User manual

This manual is also suitable for

Neo Series™ Library
Service Manual
P/N 104241-xxx
Revision A February 2002
Neo Series™ Service Manual
PROPRIETARY NOTICE
All information contained in or disclosed by this document is considered proprietary by Overland Data. By accepting this material the recipient
agrees that this material and the information contained therein are held in confidence and in trust and will not be used, reproduced in whole or in
part, nor its contents revealed to others, except to meet the purpose for which it was delivered. It is understood that no right is conveyed to repro-
duce or have reproduced any item herein disclosed without express permission from Overland Data.
Overland Data provides this manual as is, without warranty of any kind, either expressed or implied, including, but not limited to, the implied war-
ranties of merchantability and fitness for a particular purpose. Overland Data may make improvements or changes in the product(s) or programs
described in this manual at any time. These changes will be incorporated in new editions of this publication.
Overland Data assumes no responsibility for the accuracy, completeness, sufficiency, or usefulness of this manual, nor for any problem that might
arise from the use of the information in this manual.
Worldwide
Headquarters
Overland Data, Inc.
8975 Balboa Avenue
San Diego, CA 92123-1599
Toll Free: (800) 729-8725
Tel: (858) 571-5555
Fax: (858) 571-3664
Sales
Tel: (858) 571-5555
Fax: (858) 571-3664
E-mail: sales@overlanddata.com
www.overlanddata.com
Technical Support
Tel: (858) 571-5555
Fax: (858) 571-3664
E-mail: techsupport@overlanddata.com
Overland Data, EMEA
Overland House, Ashville Way
Wokingham, Berkshire
RG41 2PL, England
Tel: +44 (0) 118-9898000
Fax: +44 (0) 118-9891897
www.overlanddata.com
Neo Series Libraries
Preface i
Purpose of This Manual
This manual provides step-by-step installation instructions, and information required for ongoing
use and maintenance for the Neo Series
Libraries. This manual is written for the service provider
of this equipment. The following information is contained in this manual:
Chapter 1: “Illustrated Parts Catalog - Provides an illustrated parts and spares list.
Includes graphic representations of Neo Series Libraries.
Chapter 2: “Servicing the Neo Series 2000” - Presents step-by-step procedures for remov-
ing and replacing Neo Series™ 2000 Library components.
Chapter3 “Servicing the Neo Series 4000” - Presents step-by-step procedures for remov-
ing and replacing Neo Series™ 4000 Library components.
Chapter 4: “Operation” - Describes front panel operations for the Neo Series Library along
with inserting and removing tape cartridges, and tape requirements.
Chapter 5: “Troubleshooting” - Describes the Power-On-Self-Test (POST) diagnostic test,
codes and correction procedures for Neo Series Libraries.
Chapter 6: Connectors, Switches and Indicators” - Lists and Describes the connectors,
switches, and LED indicators for the Neo Series Libraries
Appendix A: “Specification” - Contains Neo Series Library specifications, and EMI compli-
ance information.
Appendix B: “Vertical Axis Alignment - Presents step-by-step procedures for aligning the
vertical axis assembly. This procedure is required when components are
removed or replaced
Appendix C: Elevator Assembly Installation - Presents procedures for Elevator installa-
tion including: rack preparation, minimum firmware, mechanical installation,
configuration and cabling.
Preface
ii
Preface
Neo Series Libraries
P
REFACE
iii
Purpose of This Manual ................................................................................. -i
Chapter 1 - Illustrated Parts Catalog
Introduction ................................................................................................. 1-1
Figure 1–1 Neo Series™ Library Modules ............................................. 1-1
Mechanical Parts Exploded View ............................................................... 1-2
Figure 1–2 Neo Series 2000 Mechanical Parts........................................ 1-2
Table 1-1 Neo Series 2000 Mechanical Parts List................................... 1-2
Figure 1–3 Neo Series 4000 Mechanical Parts........................................ 1-3
Table 1-2 Mechanical Spare Parts List.................................................... 1-3
Electrical Parts Exploded View .................................................................. 1-4
Figure 1–4 Neo Series™ 2000 Electrical Parts....................................... 1-4
Table 1-3 Electrical Spare Parts List....................................................... 1-4
Figure 1–5 Neo Series™ 4000 Electrical Parts....................................... 1-5
Table 1-4 Electrical Spare Parts List....................................................... 1-5
Chapter 2 - Servicing the Neo Series 2000
Introduction ................................................................................................. 2-1
Electrostatic Discharge Information ..................................................... 2-1
Preparation Procedures ......................................................................... 2-1
Weight Warning ................................................................................... 2-2
Emergency Magazine Removal .................................................................. 2-3
Figure 2–1 Manual Door Release............................................................ 2-3
Figure 2–2 Magazine Removal................................................................ 2-3
Library Covers Remove and Replace ......................................................... 2-4
Tabletop Model Cover Removal .......................................................... 2-4
Figure 2–3 Tabletop Model Outer Skin Removal ................................... 2-4
Tabletop Model Cover Replacement .................................................... 2-4
Library Inside Covers ........................................................................... 2-4
Front Chassis Cover Removal ................................................................... 2-4
Front Chassis Cover Replacement ............................................................ 2-5
Fan Cover Assembly Removal ................................................................. 2-5
Figure 2–4 Cooling Fan Disconnect........................................................ 2-5
Fan Cover Assembly Replacement ........................................................... 2-5
Power Supply Receiver Cover Removal ................................................... 2-5
Figure 2–5 Tabletop Model Cover Removal........................................... 2-6
Power Supply Receiver Cover Replacement ............................................ 2-6
Parking the Shuttle Assembly Robotics for Service or Shipment .............. 2-7
If the library is operational ................................................................... 2-7
If the library is not operational ............................................................. 2-7
Table of Contents
iv
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Figure 26 Shuttle Brake Release ........................................................... 2-8
Figure 27 Shuttle Assembly in Parked Position.................................... 2-8
Front Panel Remove and Replace ............................................................... 2-9
Front Panel Removal ............................................................................ 2-9
Figure 28 Control Panel Board.............................................................. 2-9
Figure 29 Front Panel Removal........................................................... 2-10
Front Panel Replacement ................................................................... 2-10
Figure 210 Routing Front Panel Cables .............................................. 2-11
Figure 211 Powering up the Library.................................................... 2-12
GUI Assembly Remove and Replace ....................................................... 2-13
GUI Assembly Removal .................................................................... 2-13
Figure 212 GUI Assembly Remove and Replace................................ 2-13
GUI Assembly Replacement .............................................................. 2-13
Figure 213 Powering up the Library.................................................... 2-14
Front Panel LED Remove and Replace .................................................... 2-15
Front Panel LED Removal ................................................................. 2-15
Figure 214 Front Panel LED Remove................................................. 2-15
Front Panel LED Replacement ........................................................... 2-15
Figure 215 Powering up the Library.................................................... 2-16
Front Panel Door Latch Remove and Replace .......................................... 2-17
Front Panel Door Latch Removal ....................................................... 2-17
Figure 216 Front Panel Solenoids Cable Tie....................................... 2-17
Figure 217 Front Panel Solenoid Remove and Replace...................... 2-18
Front Panel Door Latch Replacement ................................................ 2-18
Figure 218 Powering up the Library.................................................... 2-19
Drive Shoe Assembly Remove and Replace ............................................ 2-20
Drive Shoe Assembly Removal ......................................................... 2-20
If the Library Will Remain Operational: ................................................. 2-20
If the library Will Not Be operational: .................................................... 2-20
Figure 219 Removing a Tape Drive .................................................... 2-21
Drive Shoe Assembly Replacement ................................................... 2-21
Figure 220 Installing a Tape Drive...................................................... 2-21
Figure 221 Powering up the Library.................................................... 2-22
Elevator Opto Sensor Remove and Replace ............................................. 2-23
Elevator Opto Sensor Removal .......................................................... 2-23
Figure 222 Access Plate Removal....................................................... 2-23
Figure 223 Elevator Opto Sensor ........................................................ 2-24
Elevator Opto Sensor Replacement .................................................... 2-24
Figure 224 Powering up the Library.................................................... 2-25
Control Panel PCB Remove and Replace ................................................. 2-26
Control Panel PCB Removal .............................................................. 2-26
Figure 225 Control Panel PCB Remove and Replace ......................... 2-26
Control Panel PCB Replacement ....................................................... 2-26
Figure 226 Powering up the Library.................................................... 2-27
v
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Magazine Interlock Solenoid Assembly ................................................... 2-28
Magazine Interlock Solenoid Removal .............................................. 2-28
Figure 227 Mail Slot Solenoid Remove and Replace.......................... 2-28
Magazine Interlock Solenoid Replacement ........................................ 2-28
Figure 228 Powering up the Library.................................................... 2-29
Library Controller Card Remove and Replace ......................................... 2-30
Library Controller Removal. .............................................................. 2-30
Figure 229 Library Controller Card Removal..................................... 2-30
Library Controller Replacement ......................................................... 2-30
Figure 230 Powering up the Library.................................................... 2-31
Fibre Channel Option Card Remove and Replace .................................... 2-32
FCO Card Removal ............................................................................ 2-32
Figure 231 FCO Card Removal........................................................... 2-32
FCO Card Replacement ..................................................................... 2-32
Figure 232 FCO Card Replacement .................................................... 2-33
Figure 233 Powering up the Library.................................................... 2-33
Power Supply Remove and Replace ......................................................... 2-34
Power Supply Removal ...................................................................... 2-34
Figure 234 Power Supply Remove and Replace ................................. 2-34
Power Supply Replacement ............................................................... 2-34
Figure 235 Powering up the Library.................................................... 2-35
Power Supply Receiver Remove and Replace .......................................... 2-36
Power Supply Receiver Removal ....................................................... 2-36
Figure 236 Power Supply Receiver Remove and Replace.................. 2-36
Power Supply Receiver Replacement ................................................ 2-37
Figure 237 Powering up the Library.................................................... 2-37
Card Cage Fan Remove and Replace ....................................................... 2-38
Card Cage Fan Removal .................................................................... 2-38
Figure 238 Card Cage Backplane Assembly....................................... 2-38
Figure 239 Card Cage Backplane Connector Access Plate Removal.. 2-39
Figure 240 Card Cage Fan Removal ................................................... 2-39
Card Cage Fan Replacement .............................................................. 2-40
Figure 241 Powering up the Library.................................................... 2-40
Card Cage/Back Plane Remove and Replace ........................................... 2-41
Card Cage/Back Plane Removal ........................................................ 2-41
Figure 242 Card Cage Back Plane Assembly Removal ...................... 2-42
Card Cage/Back Plane Replacement .................................................. 2-42
Figure 243 Powering up the Library.................................................... 2-43
SCSI I/O Board and Plug Assembly ......................................................... 2-45
SCSI I/O Board and Plug Assembly Removal ................................... 2-45
Figure 244 SCSI I/O Board Removal.................................................. 2-46
Figure 245 SCSI I/O Board / Plug Assembly......................................2-46
SCSI I/O Board and Plug Assembly Replacement ............................ 2-46
Figure 246 Powering up the Library.................................................... 2-47
vi
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Drive Shield Remove and Replace ........................................................... 2-48
Drive Shield Removal ........................................................................ 2-48
Figure 247 Tape Drive Shield Removal.............................................. 2-48
Tape Drive Shield Replacement ......................................................... 2-48
Figure 248 Powering up the Library.................................................... 2-49
Drive Guides Remove and Replace .......................................................... 2-50
Drive Guides Removal ....................................................................... 2-50
Figure 249 Drive Guide Removal ....................................................... 2-50
Drive Guides Replacement ................................................................. 2-50
Figure 250 Powering up the Library.................................................... 2-51
Magazine Opto Sensors ............................................................................ 2-52
Magazine Opto Sensors Removal ...................................................... 2-52
Figure 251 Magazine Opto Sensor...................................................... 2-52
Magazine Opto Sensors Replacement ................................................ 2-52
Figure 252 Powering up the Library.................................................... 2-53
Shuttle Assembly Track Sensor Remove and Replace ............................. 2-54
Shuttle Assembly Track Sensor Removal .......................................... 2-54
Figure 253 Shuttle Assembly Track Sensor Removal......................... 2-55
Shuttle Assembly Track Sensor Replacement ................................... 2-55
Figure 254 Powering up the Library.................................................... 2-56
Shuttle Assembly Robotics Remove and Replace .................................... 2-57
Shuttle Assembly Robotics Removal ................................................. 2-57
Figure 255 Shuttle Assembly Removal............................................... 2-58
Shuttle Assembly Robotics Replacement .......................................... 2-58
Figure 256 Installing Flex Chain On Robot ........................................ 2-59
Figure 257 Powering up the Library.................................................... 2-60
Bar Code Reader Remove and Replace .................................................... 2-61
Bar Code Reader Removal ................................................................. 2-61
Figure 258 Bar Code Reader Removal................................................ 2-61
Bar Code Reader Replacement .......................................................... 2-61
Figure 259 Powering up the Library.................................................... 2-62
Flex Cable/Chain Assembly ..................................................................... 2-63
Flex Cable/Chain Assembly Removal ............................................... 2-63
Figure 260 Shuttle Assembly In Parked Position................................ 2-64
Figure 261 J6 and J3 Removal ............................................................ 2-64
Figure 262 Flex Chain Removal.......................................................... 2-65
Figure 263 Removing Flex Chain from Shuttle Assembly ................. 2-66
Flex Cable/Chain Assembly Replacement ......................................... 2-66
Figure 264 Installing Flex Chain on Robot ......................................... 2-67
Figure 265 Powering up the Library.................................................... 2-68
Cable Support Rod .................................................................................... 2-69
Cable Support Rod Removal .............................................................. 2-69
Figure 266 Cable Support Rod Removal............................................. 2-69
Cable Support Rod Replacement ....................................................... 2-69
vii
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Figure 267 Powering up the Library.................................................... 2-70
Chapter 3 - Servicing the Neo Series 4000
Introduction ................................................................................................. 3-1
Electrostatic Discharge Information ..................................................... 3-1
Preparation Procedures ......................................................................... 3-1
Weight Warning ................................................................................... 3-2
Emergency Magazine Removal .................................................................. 3-3
Figure 31 Manual Door Release............................................................ 3-3
Figure 32 Magazine Removal................................................................ 3-4
Library Covers Remove and Replace ......................................................... 3-5
Tabletop Cover Removal ..................................................................... 3-5
Figure 33 Tabletop Model Tabletop Cover Removal............................ 3-5
Tabletop Cover Replacement ............................................................... 3-5
Library Inside Covers ........................................................................... 3-5
Front Chassis Cover Removal ................................................................... 3-5
Front Chassis Cover Replacement ............................................................ 3-6
Fan Cover Assembly Removal ................................................................. 3-6
Figure 34 Cooling Fan Disconnect........................................................ 3-6
Fan Cover Assembly Replacement ........................................................... 3-6
Power Supply Receiver Cover Removal ................................................... 3-7
Figure 35 Inside Covers Removal ......................................................... 3-7
Power Supply Receiver Cover Replacement ............................................ 3-7
Parking the Shuttle Assembly Robotics for Service or Shipment .............. 3-8
If the library is operational ................................................................... 3-8
If the library is not operational ............................................................. 3-8
Figure 36 Shuttle Brake Release............................................................ 3-9
Figure 37 Shuttle Assembly in Parked Position.................................... 3-9
Front Panel Remove and Replace ............................................................. 3-10
Front Panel Removal .......................................................................... 3-10
Figure 38 Front Panel Remove............................................................ 3-11
Figure 39 Front Panel Removed.......................................................... 3-11
Front Panel Replacement ................................................................... 3-12
Figure 310 Applying Power ................................................................ 3-12
GUI Assembly Remove and Replace ....................................................... 3-13
GUI Assembly Removal .................................................................... 3-13
Figure 311 GUI Assembly Remove and Replace................................ 3-13
GUI Assembly Replacement .............................................................. 3-13
Figure 312 Applying Power ................................................................ 3-14
Front Panel LED Remove and Replace .................................................... 3-15
Front Panel LED Removal ................................................................. 3-15
Figure 313 LED Remove and Replace................................................ 3-15
Front Panel LED Replacement ........................................................... 3-15
viii
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Figure 314 Powering up the Library.................................................... 3-16
Front Panel Latch Assembly Remove and Replace .................................. 3-17
Front Panel Latch Assembly Removal ............................................... 3-17
Figure 315 Front Panel Latch Assembly............................................. 3-17
Front Panel Latch Assembly Replacement ........................................ 3-18
Figure 316 Applying Power ................................................................ 3-18
Drive Shoe Assembly Remove and Replace ............................................ 3-19
Drive Shoe Assembly Removal ......................................................... 3-19
If the Library Will Remain Operational: ................................................. 3-19
If the library Will Not Be operational: .................................................... 3-19
Figure 317 Removing a Drive Shoe Assembly ................................... 3-20
Drive Shoe Assembly Replacement ................................................... 3-21
Figure 318 Installing a Tape Drive...................................................... 3-21
Control Panel PCB Remove and Replace ................................................. 3-22
Control Panel PCB Removal .............................................................. 3-22
Figure 319 Control Panel PCB Mounting Screws............................... 3-22
Figure 320 Control Panel PCB Connections....................................... 3-23
Control Panel PCB Replacement ....................................................... 3-23
Figure 321 Applying Power ................................................................ 3-24
Mail Slot Interlock .................................................................................... 3-25
Mail Slot Interlock Removal .............................................................. 3-25
Figure 322 Control Panel PCB Cover Plate ........................................ 3-25
Figure 323 Magazine/Mail Slot Interlock Mounting Screws.............. 3-26
Mail Slot Interlock Replacement ........................................................ 3-26
Figure 324 Applying Power ................................................................ 3-27
Magazine Interlock Assembly .................................................................. 3-28
Magazine Interlock Removal ............................................................. 3-28
Figure 325 Control Panel PCB Cover Plate ........................................ 3-28
Figure 326 Interlock Mounting Screws............................................... 3-29
Magazine Interlock Replacement ....................................................... 3-29
Figure 327 Applying Power ................................................................ 3-30
Library Controller Card Remove and Replace ......................................... 3-31
Library Controller Removal. .............................................................. 3-31
Figure 328 Library Controller Card Removal..................................... 3-31
Library Controller Replacement ......................................................... 3-32
Figure 329 Applying Power ................................................................ 3-32
Fibre Channel Option Card Remove and Replace .................................... 3-33
FCO Card Removal ............................................................................ 3-33
Figure 330 FCO Card Removal........................................................... 3-33
FCO Card Replacement ..................................................................... 3-33
Figure 331 FCO Card Replacement .................................................... 3-34
Figure 332 Apply Power...................................................................... 3-34
Partitioning Controller Card Remove and Replace .................................. 3-35
FCO Card Removal ............................................................................ 3-35
ix
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Figure 333 FCO Card Removal........................................................... 3-35
FCO Card Replacement ..................................................................... 3-35
Figure 334 FCO Card Replacement .................................................... 3-36
Figure 335 Apply Power...................................................................... 3-36
Power Supply Remove and Replace ......................................................... 3-37
Power Supply Removal ...................................................................... 3-37
Figure 336 Power Supply Remove and Replace ................................. 3-37
Power Supply Replacement ............................................................... 3-38
Power Supply Receiver Remove and Replace .......................................... 3-39
Power Supply Receiver Removal ....................................................... 3-39
Figure 337 Power Supply Reciever Remove and Replace.................. 3-40
Power Supply Receiver Replacement ................................................ 3-40
Figure 338 Applying Power ................................................................ 3-41
Card Cage Fan Remove and Replace ....................................................... 3-42
Card Cage Fans Removal ................................................................... 3-42
Upper Card Cage Fan Removal .............................................................. 3-42
Figure 339 Card Cage Backplane Connector Access Plate Removal.. 3-42
Figure 340 Card Cage Backplane Assembly....................................... 3-43
Figure 341 Upper Card Cage Fan Removal ........................................ 3-43
Upper Card Cage Fan Replacement ........................................................ 3-44
Figure 342 Applying Power ................................................................ 3-44
Lower Card Cage Fan Removal .............................................................. 3-45
Figure 343 Card Cage Backplane Expansion PCB.............................. 3-45
Figure 344 Flex Cable Bracket Removal............................................. 3-46
Figure 345 Lower Card Cage Fan Removal........................................ 3-46
Lower Card Cage Fan Replacement ....................................................... 3-46
Figure 346 Applying Power ................................................................ 3-47
Lower Card Cage Fan Bracket Assembly ................................................. 3-48
Fan Bracket Assembly Removal ........................................................ 3-48
Figure 347 Lower Card Cage Fan Bracket Removal........................... 3-48
Figure 348 Lower Card Cage Bracket Assembly................................3-49
Fan Bracket Assembly Replacement .................................................. 3-49
Figure 349 Applying Power ................................................................ 3-50
Card Cage/Back Plane Remove and Replace ........................................... 3-51
Card Cage/Back Plane Removal ........................................................ 3-51
Figure 350 Card Cage Back Plane Assembly Removal ...................... 3-52
Card Cage/Back Plane Replacement .................................................. 3-53
Figure 351 Applying Power ................................................................ 3-54
Expansion Card Cage/Back Plane Remove and Replace ......................... 3-55
Expansion Card Cage/Back Plane Removal ...................................... 3-55
Figure 352 Expansion Card Cage/Backplane...................................... 3-56
Expansion Card Cage/Back Plane Replacement ................................ 3-57
Figure 353 Applying Power ................................................................ 3-58
High Density SCSI I/O Boards and SCSI Connector Plate Assemblies ... 3-59
x
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
SCSI I/O Board and the SCSI Connector Plate Assembly Removal . 3-59
Figure 354 SCSI I/O Board Removal.................................................. 3-60
Figure 355 SCSI I/O Board Removal.................................................. 3-60
SCSI I/O Board and the SCSI Connector Plate Assembly Replacement 3-61
Figure 356 Applying Power ................................................................ 3-61
Drive Divider Remove and Replace ......................................................... 3-62
Drive Divider Removal ...................................................................... 3-62
Figure 357 Wire Harness Cover Plate................................................. 3-63
Figure 358 Drive Divider Removal..................................................... 3-63
Drive Divider Replacement ................................................................ 3-64
Figure 359 Applying Power ................................................................ 3-64
Drive Guide Remove and Replace ............................................................ 3-65
Drive Guides Removal ....................................................................... 3-65
Figure 360 Drive Guide Removal ....................................................... 3-65
Drive Guides Replacement ................................................................. 3-66
Figure 361 Applying Power ................................................................ 3-66
Upper Magazine Opto Sensors ................................................................. 3-67
Upper Magazine Opto Sensors Removal ........................................... 3-67
Figure 362 Control Panel PCB Cover Plate ........................................ 3-67
Figure 363 Magazine Opto Sensors..................................................... 3-68
Upper Magazine Opto Sensors Replacement ..................................... 3-68
Figure 364 Applying Power ................................................................ 3-69
Lower Magazine Opto Sensors ................................................................. 3-70
Lower Magazine Opto Sensor Removal ............................................3-70
Figure 365 Control Panel PCB Cover Plate ........................................ 3-70
Figure 366 Magazine Opto Sensors..................................................... 3-71
Lower Magazine Opto Sensor Replacement ...................................... 3-71
Figure 367 Applying Power ................................................................ 3-72
Shuttle Assembly Track Sensor Remove and Replace ............................. 3-73
Shuttle Assembly Track Sensor Removal .......................................... 3-73
Figure 368 Track Sensor Removal ...................................................... 3-73
Shuttle Assembly Track Sensor Replacement ................................... 3-73
Figure 369 Applying Power ................................................................ 3-74
Elevator Opto Sensor Remove and Replace ............................................. 3-75
Elevator Opto Sensor Removal .......................................................... 3-75
Figure 370 Backplane Access Cover................................................... 3-75
Figure 371 Pass Thru Sensor Remove................................................. 3-76
Elevator Opto Sensor Replacement .................................................... 3-76
Figure 372 Powering up the Library.................................................... 3-77
Shuttle Assembly Robotics Remove and Replace .................................... 3-78
Removing the Robot Shuttle and Track Base .................................... 3-78
Figure 373 Flex Cable, carrier and clip removal................................. 3-78
Figure 374 Rotate Track 90 Deg ......................................................... 3-79
Figure 375 Shuttle Brake Release ....................................................... 3-79
xi
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Figure 376 Removing Robotics Base.................................................. 3-80
Replacing the Robot Shuttle and Base ............................................... 3-80
Bar Code Reader Remove and Replace .................................................... 3-82
Bar Code Reader Removal ................................................................. 3-82
Figure 377 Bar Code Reader Removal................................................ 3-82
Bar Code Reader Replacement .......................................................... 3-82
Figure 378 Applying Power ................................................................ 3-83
Front Vertical Axis Assembly Remove and Replace ............................... 3-84
Removing the Front Vertical Axis Assembly ....................................3-84
Figure 379 Rotate Track 90 Deg ......................................................... 3-84
Figure 380 Shuttle Brake Release........................................................ 3-85
Figure 381 Front Vertical Axis Assembly Screws.............................. 3-85
Figure 382 Front Vertical Axis Motor Cable ...................................... 3-86
Figure 383 Front Vertical Axis Screws ............................................... 3-86
Replacing the Front Vertical Axis Assembly ..................................... 3-87
Figure 384 Shuttle Robot..................................................................... 3-87
Rear Vertical Axis Assembly Remove and Replace ................................ 3-88
Removing the Rear Vertical Axis Assembly ..................................... 3-88
Figure 385 Flex Cable, carrier and clip removal................................. 3-88
Figure 386 Motor Cable / Mounting Screws....................................... 3-89
Figure 387 Rear Vertical Axis Screws Removed................................ 3-89
Replacing the Rear Vertical Axis Assembly ...................................... 3-90
Vertical Axis PCB Remove and Replace ................................................. 3-91
Controller Board Removal ................................................................. 3-91
Figure 388 Vertical Controller Board.................................................. 3-91
Replacing the Controller Board .......................................................... 3-92
Figure 389 Vertical Controller Board Removed ................................. 3-92
Figure 390 Applying Power ................................................................ 3-93
Robot Base Flex Cable Remove and Replace .......................................... 3-94
Robot Base Flex Cable Removal ....................................................... 3-94
Figure 391 Access Panel / Flex Cable Bracket....................................3-95
Figure 392 Removing Fan from the Standoffs.................................... 3-95
Figure 393 Track Mounting Screws .................................................... 3-96
Figure 394 Disconnecting Flex Cable at J1......................................... 3-96
Figure 395 Removing Flex Cable........................................................ 3-97
Figure 396 Disconnecting Flex Cable at J12....................................... 3-98
Robot Base Flex Cable Replacement ................................................. 3-98
Figure 397 Applying Power ................................................................ 3-99
Shuttle Assembly Flex Cable Remove and Replace ............................... 3-100
Robot Flex Cable Removal .............................................................. 3-100
Figure 398 Shuttle PCB..................................................................... 3-100
Figure 399 Flex Cable, carrier and clip removal............................... 3-101
Figure 3100 Access Panel / Flex Cable Bracket................................ 3-101
Figure 3101 Shuttle Flex Cable Connections.................................... 3-102
xii
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Rotating Track Flex Cable Replacement ......................................... 3-102
Figure 3102 Applying Power ............................................................ 3-103
Chapter 4 - Operation
Introduction ................................................................................................. 4-1
Front Panel .................................................................................................. 4-1
Figure 41 Library Front Panel ............................................................... 4-1
Magazine Doors ................................................................................... 4-2
Figure 42 Magazine Door Mechanical Release..................................... 4-2
Indicators .............................................................................................. 4-3
Figure 43 Library Indicators.................................................................. 4-3
Table 4-1 Indicators................................................................................. 4-3
Turning On The Libraries .................................................................... 4-3
Neo Series 2000 ........................................................................................ 4-3
Figure 44 Powering the Neo Series 2000 .............................................. 4-4
Neo Series 4000 ........................................................................................ 4-4
Figure 45 Powering The Neo Series 4000............................................. 4-4
Initialization Screen .............................................................................. 4-5
Figure 46 Initialization Screen .............................................................. 4-5
Library Default Screen ......................................................................... 4-5
Figure 47 Library Default Screen.......................................................... 4-5
Front Panel and Media Security Locks ................................................ 4-6
Passwords Screen ...................................................................................... 4-6
Figure 48 Library Password Levels....................................................... 4-6
Host System .............................................................................................. 4-7
Library Display Screens and Options ......................................................... 4-8
Technical Support Information Option ..................................................... 4-8
Figure 49 Technical Support Information Screen ................................. 4-8
Access Mail Slot Option (Left Magazine Only) ....................................... 4-9
Figure 410 Access Mail Slot Screen...................................................... 4-9
Access Magazine Option .......................................................................... 4-9
Figure 411 Access Magazine Screen................................................... 4-10
Move Media ............................................................................................ 4-10
Figure 412 Move Media Screen .......................................................... 4-10
Figure 413 Move Media Screen (Source)............................................ 4-11
Figure 414 Move Media Screen (Destination) .................................... 4-11
LCD Contrast Controls ........................................................................... 4-11
Power ...................................................................................................... 4-12
Figure 415 Power Down Initiation Screen ..........................................4-12
Status .......................................................................................................4-13
Figure 416 Neo Series Status Screen................................................... 4-13
Online ...................................................................................................... 4-13
Menu Selections ........................................................................................ 4-14
xiii
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Figure 417 Menu Screen...................................................................... 4-14
View System Data .............................................................................. 4-15
Library Options ....................................................................................... 4-15
Figure 418 View Library Options Screen (Initial Screen)................... 4-15
Table 4-2 View Library Options............................................................ 4-15
SCSI Options ........................................................................................... 4-18
Figure 419 View SCSI Options Screen (Initial Screen)...................... 4-18
Table 4-3 View SCSI Options............................................................... 4-18
Network Options ..................................................................................... 4-20
Figure 420 View Network Options Screen.......................................... 4-20
Table 4-4 View Network Options.......................................................... 4-20
Library Info ............................................................................................. 4-20
Figure 421 View Library Info Screen.................................................. 4-21
Cartridge Map ......................................................................................... 4-21
Figure 422 Cartridge Map (page 1) ..................................................... 4-21
Edit Options ........................................................................................ 4-21
Library ..................................................................................................... 4-22
Figure 423 Edit Library Options Screen.............................................. 4-22
SCSI ........................................................................................................ 4-22
Figure 424 Edit SCSI Options Screen................................................. 4-22
Network ...................................................................................................4-23
Figure 425 Edit Network Options Screen............................................ 4-23
Passwords ................................................................................................ 4-23
Figure 426 Edit Passwords Options Screen......................................... 4-23
Utilities ............................................................................................... 4-24
Security Level ......................................................................................... 4-24
Figure 427 Security Level Screen........................................................ 4-24
Inserting and Removing Tape Cartridges ................................................. 4-25
Removing Magazines ......................................................................... 4-25
Figure 428 Removing Tape Cartridge Magazines............................... 4-25
Inserting Cartridges into a Magazine ................................................. 4-25
Figure 429 Tape Magazine with Tape Cartridges Installed................. 4-26
Using the Mail Slot (Left Magazines Only) ....................................... 4-26
Figure 430 Left Magazine Mail Slot ................................................... 4-27
Barcode Labels ................................................................................... 4-27
Figure 431 Barcode Label installation................................................. 4-27
Chapter 5 - Troubleshooting
Introduction ................................................................................................. 5-1
Platform Problems ...................................................................................... 5-1
Error Recovery ............................................................................................ 5-2
Figure 51 Troubleshooting Flow Chart ................................................. 5-2
Error Recovery Procedures ......................................................................... 5-3
xiv
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Table 5-1 Error Recovery Procedures ..................................................... 5-3
Fault Symptom Codes (FSCs) .................................................................... 5-4
Table 5-2 Fault Symptom Codes............................................................. 5-4
Chapter 6 - Connectors, Switches and Indicators
Introduction ................................................................................................. 6-1
Neo Series 2000 Connectors ....................................................................... 6-1
Library Controller Board .......................................................................... 6-1
Figure 61 Library Controller Board....................................................... 6-1
Table 6-1 Library Controller Board Connectors ..................................... 6-1
Control Panel Board .................................................................................. 6-2
Figure 62 Control Panel Board.............................................................. 6-2
Table 6-2 Control Panel Board Connectors............................................. 6-2
Card Cage/Backplane Assembly ............................................................... 6-3
Figure 63 Card Cage/Backplane Assembly........................................... 6-3
Table 6-3 Card Cage/Backplane Assembly Connectors.......................... 6-3
Shuttle Assembly Board ............................................................................ 6-4
Figure 64 Shuttle Assembly Board........................................................ 6-4
Table 6-4 Shuttle Assembly Board Connectors ...................................... 6-4
SCSI I/O Board ......................................................................................... 6-5
Figure 65 SCSI I/O Board (bottom side)............................................... 6-5
Table 6-5 SCSI I/O Board Connectors (bottom side).............................. 6-5
Figure 66 SCSI I/O Board (top side)..................................................... 6-6
Table 6-6 SCSI I/O Board Connectors (top side).................................... 6-6
Hot Swap Library Board ........................................................................... 6-7
Figure 67 Hot Swap Library Board....................................................... 6-7
Table 6-7 Hot Swap Library Board ......................................................... 6-7
Neo Series 4000 Connectors ................................................................ 6-8
Library Controller Board .......................................................................... 6-8
Figure 68 Library Controller Board....................................................... 6-8
Table 6-8 Library Controller Board Connectors ..................................... 6-8
Control Panel Board .................................................................................. 6-9
Figure 69 Control Panel Board.............................................................. 6-9
Table 6-9 Control Panel Board Connectors............................................. 6-9
Card Cage/Backplane Board ................................................................... 6-10
Figure 610 Card Cage/Backplane Board............................................. 6-10
Table 6-10 Card Cage/Backplane Board Connectors............................ 6-10
Card Cage/Backplane Expansion Board ................................................. 6-11
Figure 611 Card Cage/Backplane Expansion Board........................... 6-11
Table 6-11 Card Cage/Backplane Expansion Board Connectors.......... 6-11
Shuttle Assembly Board .......................................................................... 6-12
Figure 612 Shuttle Assembly Board.................................................... 6-12
Table 6-12 Shuttle Assembly Board Connectors .................................. 6-12
xv
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Mono Track Interface Board ................................................................... 6-13
Figure 613 Mono Track Interface Board............................................. 6-13
Table 6-13 Mono Track Interface Board Connectors............................ 6-13
Vertical Axis Assembly Board ............................................................... 6-14
Figure 614 Vertical Axis Assembly Board.......................................... 6-14
Table 6-14 Vertical Axis Assembly Board Connectors ........................ 6-14
Upper and Lower SCSI I/O Boards ........................................................ 6-15
Figure 615 SCSI I/O Board (bottom side)........................................... 6-15
Table 6-15 SCSI I/O Board Connectors (bottom side).......................... 6-15
Figure 616 SCSI I/O Board (top side)................................................. 6-16
Table 6-16 SCSI I/O Board Connectors (top side)................................ 6-16
Hot Plug Library Board ........................................................................... 6-17
Figure 617 Hot Plug Library Board..................................................... 6-17
Table 6-17 Hot Plug Library Board....................................................... 6-17
Switches .................................................................................................... 6-18
Library Controller Board .................................................................... 6-18
Figure 618 Library Controller Board Mode Switch ............................ 6-18
Power Supply ..................................................................................... 6-18
Figure 619 Power Supply (s) Power On/Off Switch........................... 6-18
LED Indicators .......................................................................................... 6-19
Power Supply(s) Power-On LED Indicator ....................................... 6-19
Figure 620 Power Supply(s) Power-On LED Indicator ...................... 6-19
Library Status LED Indicator ............................................................. 6-19
Figure 621 Power Supply(s) Power-On LED Indicator ...................... 6-19
Appendix A - Specification
Hardware Specification ...............................................................................A-1
Table A1 Hardware Specification .........................................................A-1
Environmental Specifications .....................................................................A-3
Safety ....................................................................................................A-3
Table A2 Safety Specification...............................................................A-3
Electromagnetic Emissions ..................................................................A-4
Table A3 Electromagnetic Emissions Specification..............................A-4
Electrostatic Discharge .........................................................................A-5
Table A4 ElectroStatic Discharge Specification ...................................A-5
Temperature, Humidity and Altitude ...................................................A-5
Table A5 Temperature Humidity and Altitude Specification................A-5
Shock ....................................................................................................A-5
Table A6 Electromagnetic Emissions Specification..............................A-5
Vibration ...............................................................................................A-6
Table A7 Vibration Specification..........................................................A-6
Primary Power ............................................................................................A-7
Voltage Limits ......................................................................................A-7
xvi
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Frequency Limits ..................................................................................A-7
Power Requirements ............................................................................A-7
Table A8 Current ..................................................................................A-7
Sag / Surge Protection ..........................................................................A-8
Table A9 Sag / Surge Protection ...........................................................A-8
Power Line Disturbance .......................................................................A-8
Table A10 Power Line Disturbance ......................................................A-8
Cooling ........................................................................................................A-9
FCC Notice ...............................................................................................A-10
Japanese Voluntary Control Council for Interference (VCCI) ...............A-10
Translation ..............................................................................................A-10
Installation Considerations .......................................................................A-11
Rack Mounting ...................................................................................A-11
Input Supply .......................................................................................A-11
Grounding ...........................................................................................A-11
Appendix B - Vertical Axis Alignment
Alignment Procedure ..................................................................................B-1
Figure B1 Applying Power....................................................................B-1
Figure B2 Initialization Screen..............................................................B-2
Figure B3 Menu Screen.........................................................................B-2
Figure B4 Diagnostics Screen ...............................................................B-3
Figure B5 Vertical Axis Calibration Screen..........................................B-3
Figure B6 Mounting Screw Sequence...................................................B-4
Figure B7 Final Calibration Screen.......................................................B-5
Figure B8 Initial Calibration Screen......................................................B-5
Figure B9 Main Screen..........................................................................B-6
Appendix C - Elevator Assembly Installation
Introduction .................................................................................................C-1
Planning Your Installation ...................................................................C-2
Positioning Your Modules and the Elevator ........................................C-2
Verify Minimum Firmware Level ........................................................C-2
Figure C1 Powering up the Library.......................................................C-3
Neo Series Router .......................................................................................C-4
Router Installation ................................................................................C-4
Figure C2 Typical Router......................................................................C-4
Figure C3 Router Installed ....................................................................C-5
Installing the Elevator Assembly ................................................................C-6
Figure C4 Drive Shoe/Blank Panel Removal........................................C-7
Figure C5 Cover Plate Removal............................................................C-7
Figure C6 Installing the Elevator Assembly..........................................C-9
Figure C7 Installing a Tape Drive.......................................................C-10
xvii
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Elevator Assembly Extension ...................................................................C-11
Mechanical Installation ......................................................................C-11
Elevator Assembly Required Tools ........................................................C-11
Orientation Of Parts During Assembly ...................................................C-12
Figure C8 Factory Assembled Elevator Assembly..............................C-12
Preparing to Assemble the Elevator ...................................................C-12
Figure C9 Elevator Bottom Plate.........................................................C-13
Figure C10 Media Elevator Car...........................................................C-13
Figure C11 Tensioner Ramp/Idler Pulley Zero Point..........................C-14
Figure C12 Elevator Belt Block and Brackets.....................................C-14
Figure C13 Tensioner Ramp/Idler Pulley............................................C-15
Figure C14 Elevator Extension Alignment .........................................C-15
Figure C15 Tie Bar Installation...........................................................C-16
Table C-1 Timing Belt Lengths.............................................................C-16
Figure C16 Timing Belt Installation Base Section..............................C-17
Figure C17 Timing Belt Installation....................................................C-17
Figure C18 Timing Belt to Belt Block ................................................C-18
Figure C19 Assembled Elevator and Extension..................................C-19
Neo Series Module Configuration ............................................................C-20
Configuring Modules For Elevator Application ................................C-20
Figure C20 Powering up the Library...................................................C-20
Configuring the Primary Master Module ................................................C-20
Figure C21 Neo Main GUI Display.....................................................C-21
Figure C22 Menu Screen.....................................................................C-21
Figure C23 Module Configuration Select Screen................................C-22
Figure C24 Module Configuration Screen ..........................................C-22
Figure C25 Module Configuration Confirm........................................C-23
Figure C26 Primary Master Screen .....................................................C-23
Configuring Slave Modules ....................................................................C-24
Figure C27 Neo Main GUI Display.....................................................C-24
Figure C28 Menu Screen.....................................................................C-24
Figure C29 Module Configuration Select Screen................................C-25
Figure C30 Module Configuration Screen ..........................................C-25
Figure C31 Module Configuration Confirm........................................C-25
Figure C32 Typical Configured Slaves ...............................................C-26
Cabling and Interface Connections ...........................................................C-27
Figure C33 Typical Library Cabling ...................................................C-27
Figure C34 Powering up the Library...................................................C-28
Verifying Firmware Level of the Slave Modules ...............................C-29
Fail-over Operation ...................................................................................C-30
Introduction ........................................................................................C-30
Fail-Over Terms ......................................................................................C-30
Cabling Considerations for Fail-Over Operation ....................................C-30
Fail-Over Initiation .............................................................................C-31
xviii
T
ABLE
OF
C
ONTENTS
(
CONT
D
)
Local Fail-Over to Secondary Master Initiation .....................................C-31
Figure C35 Secondary Master Screen .................................................C-31
Figure C36 Secondary Master Menu Screen.......................................C-32
Figure C37 Secondary Master Maintenance Screen............................C-32
Remote Fail-Over to Secondary Master Initiation ..................................C-33
Restoring Normal Operation ..............................................................C-34
Local Fail-over to Primary Master ..........................................................C-34
Figure C38 Secondary Master Screen .................................................C-34
Figure C39 Secondary Master Menu Screen.......................................C-35
Figure C40 Secondary Master Maintenance Screen............................C-35
Remote Failover to Primary Master ........................................................C-35
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155
  • Page 156 156
  • Page 157 157
  • Page 158 158
  • Page 159 159
  • Page 160 160
  • Page 161 161
  • Page 162 162
  • Page 163 163
  • Page 164 164
  • Page 165 165
  • Page 166 166
  • Page 167 167
  • Page 168 168
  • Page 169 169
  • Page 170 170
  • Page 171 171
  • Page 172 172
  • Page 173 173
  • Page 174 174
  • Page 175 175
  • Page 176 176
  • Page 177 177
  • Page 178 178
  • Page 179 179
  • Page 180 180
  • Page 181 181
  • Page 182 182
  • Page 183 183
  • Page 184 184
  • Page 185 185
  • Page 186 186
  • Page 187 187
  • Page 188 188
  • Page 189 189
  • Page 190 190
  • Page 191 191
  • Page 192 192
  • Page 193 193
  • Page 194 194
  • Page 195 195
  • Page 196 196
  • Page 197 197
  • Page 198 198
  • Page 199 199
  • Page 200 200
  • Page 201 201
  • Page 202 202
  • Page 203 203
  • Page 204 204
  • Page 205 205
  • Page 206 206
  • Page 207 207
  • Page 208 208
  • Page 209 209
  • Page 210 210
  • Page 211 211
  • Page 212 212
  • Page 213 213
  • Page 214 214
  • Page 215 215
  • Page 216 216
  • Page 217 217
  • Page 218 218
  • Page 219 219
  • Page 220 220
  • Page 221 221
  • Page 222 222
  • Page 223 223
  • Page 224 224
  • Page 225 225
  • Page 226 226
  • Page 227 227
  • Page 228 228
  • Page 229 229
  • Page 230 230
  • Page 231 231
  • Page 232 232
  • Page 233 233
  • Page 234 234
  • Page 235 235
  • Page 236 236
  • Page 237 237
  • Page 238 238
  • Page 239 239
  • Page 240 240
  • Page 241 241
  • Page 242 242
  • Page 243 243
  • Page 244 244
  • Page 245 245
  • Page 246 246
  • Page 247 247
  • Page 248 248
  • Page 249 249
  • Page 250 250
  • Page 251 251
  • Page 252 252
  • Page 253 253
  • Page 254 254
  • Page 255 255
  • Page 256 256
  • Page 257 257
  • Page 258 258
  • Page 259 259
  • Page 260 260
  • Page 261 261
  • Page 262 262
  • Page 263 263
  • Page 264 264
  • Page 265 265
  • Page 266 266
  • Page 267 267
  • Page 268 268
  • Page 269 269
  • Page 270 270
  • Page 271 271
  • Page 272 272
  • Page 273 273
  • Page 274 274
  • Page 275 275
  • Page 276 276
  • Page 277 277
  • Page 278 278
  • Page 279 279
  • Page 280 280
  • Page 281 281
  • Page 282 282
  • Page 283 283
  • Page 284 284
  • Page 285 285
  • Page 286 286
  • Page 287 287
  • Page 288 288
  • Page 289 289
  • Page 290 290
  • Page 291 291
  • Page 292 292
  • Page 293 293
  • Page 294 294
  • Page 295 295
  • Page 296 296
  • Page 297 297
  • Page 298 298
  • Page 299 299
  • Page 300 300
  • Page 301 301
  • Page 302 302
  • Page 303 303
  • Page 304 304
  • Page 305 305
  • Page 306 306
  • Page 307 307
  • Page 308 308
  • Page 309 309
  • Page 310 310
  • Page 311 311
  • Page 312 312
  • Page 313 313
  • Page 314 314
  • Page 315 315
  • Page 316 316
  • Page 317 317
  • Page 318 318
  • Page 319 319
  • Page 320 320
  • Page 321 321
  • Page 322 322
  • Page 323 323
  • Page 324 324
  • Page 325 325
  • Page 326 326
  • Page 327 327
  • Page 328 328

Overland Storage Neo Series 2000 User manual

Category
Tape auto loaders & libraries
Type
User manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI