IS0511 REV. C 2022 ©Focal Point, LLC 4201 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com 2 of 3
Luminaires must be installed by a qualified electrician (check with local and national codes for proper installation).
To prevent electrical shock, disconnect electrical supply before installation or servicing.
GRID
Make electrical connectionS
65
12
AVOID ALL CONTACT WITH LED SURFACE,
LEDs ARE EASILY DAMAGED!
x4
ceilinG cutout diaMeter - Grid & drywall
skydome 2x2 – 22.10" Min 22.50" Max
skydome 3x3 – 34.10" Min 34.50" Max
skydome 4x4 – 46.10" Min 46.50" Max
SECURE TO STRUCTURE ABOVE
(hanGer rodS By otherS)
7
REST CEILING TILE ON OUTER RING
4x8 LEVEL LUMINAIRE WITH
INCLUDED BRACKETS
3x8