Contractor is responsible for adequately reinforcing walls and/or ceilings to support luminaire weight. Focal Point, LLC accepts no responsibility for inadequately reinforced walls
and/or ceilings. The information contained in this drawing is the sole property of Focal Point, LLC. Any reproduction in part or whole without the written permission of Focal Point, LLC
is prohibited.
IS0694 REV. A 2018 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com 2 of 3
3
2' / 3' dIAMeTer
4' dIAMeTer
X4
X4
4
MAKE ELECTRICAL CONNECTIONS
CONNeCT MOUNTING pLATe GrOUNd wIre
TO LUMINAIre GrOUNd wIre
4' dIAMeTer
SUSPEND LUMINAIRE
USING THE LANYARDS 5
LeAve GrOUNd wIre eXpOSed fOr
eLeCTrICAL CONNeCTION (STep 4)
INSTALL CeILING pLATe TO STrUCTUre AbOve
USING 4 X 1/4”-20 bOLTS (by OTherS)
INSTALL CeILING pLATe TO STrUCTUre AbOve
USING 8 X 1/4”-20 bOLTS (by OTherS)
2' / 3' dIAMeTer
4' dIAMeTer
2' / 3' dIAMeTer
6
1prOperLy OrIeNT ANd ALIGN SkydOMe
edGe wITh MOUNTING pLATe
2
LIfT TO eNGAGe SLOTS ON reAr Of LUMINAIre wITh TeeTh ON MOUNTING pLATe.
SLIde LUMINAIre IN The dIreCTION Of The ArrOw INdICATed ON MOUNTING pLATe.
ALIGN SLOTS ON reAr Of LUMINAIre
wITh TeeTh ON MOUNTING pLATe.
2' / 3' dIAMeTer 4' dIAMeTer
7