Focal Point ID+ 4.5" x 4.5" Wall Wash Trimless FLC44W-ST, ID+ 4.5" x 4.5" Downlight Trimless FLC44D-ST Installation guide

  • I have analyzed the document regarding the Focal Point FLC44D-ST and FLC44W-ST trimless housings. This document provides instructions for pre-drywall ceiling installation, including options for emergency and non-emergency models. I can help you understand how to mount it and what options and features these devices have, so feel free to ask any questions.
  • When should the luminaire be installed?
    What is included in the emergency option?
    What is the minimum and maximum distance for ceiling?
IS0608 REV. B 2018 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com 1 of 4
non-emergency - thermally protected, non-ic
id+ 4.5” square trimless housing
FLC44D-ST | FLC44W-ST
Luminaires must be installed by a qualied electrician (check with local and national codes for proper installation).
To prevent electrical shock, disconnect electrical supply before installation or servicing.
key
power off power on
level attention
see additional instructions
LUMINAIRE MUST BE INSTALLED PRIOR TO DRYWALL CEILING.
emergency - integral test switch
bar hangers
sold separately
flc44d-st | flc44w-st
flc44d-st | flc44w-st
cp - emergency/non-emergency
flc44d-st | flc44w-st
6 1/2max6 1/2max
6 min 6 min
1A
TO SET CEILING
THICKNESS SEE FOCAL
POINT INSTRUCTION SHEET
IS0609
X2
2
3WOOD STUDS
2b x4
2a x4
WALL WASH ORIENTATION
WALL
IS0608 REV. B 2018 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com 2 of 4
Fixtures must be installed by a qualied electrician (check with local and national codes for proper installation).
To prevent electrical shock, disconnect electrical supply before installation or servicing.
make electrical connections
5
4
METAL STUDS
x4
3
MUD-IN
4
DO NOT REMOVE DUST
COVER UNTIL TAPE AND
MUD-IN COMPLETE
5
6 1/2max6 1/2max
6 min 6 min
1
CLEAN CEILING SURFACE FREE
OF DUST AND DEBRIS
23
USE DUST COVER TO ALIGN MUD RING
WITH HOUSING
MUD TAPE
DRYWALL
REMOVE ADHESIVE BACKING FROM MUD RING
IS0608 REV. B 2018 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com 3 of 4
Fixtures must be installed by a qualied electrician (check with local and national codes for proper installation).
To prevent electrical shock, disconnect electrical supply before installation or servicing.
WOOD CEILING
wood ceiling installation kit parts list
5/16" miniature
rabbeting bit with
1/16" cut depth
wood routing jig
3m command poster strip
#136 (qty. 40)
2 3
ADHERE COMMAND POSTER STRIPS
TO WOOD ROUTING JIG
ADHERE WOOD ROUTING JIG
TO WOOD CEILING SURFACE 4CREATE STARTER HOLE
X4
4” 4”
1
CLEAN WOOD CEILING SURFACE
AND WOOD ROUTING JIG FREE
OF DUST AND DEBRIS
.170”
Tr im Recess
9a8
INSTALL 5/16" MINIATURE RABBETING BIT
WITH 1/16" CUT DEPTH SET DEPTH OF RABBETING BIT
USE TRIM TO DOUBLE CHECK DEPTH
9b
5CREATE MAIN HOLE USING
WOOD CEILING JIG AS GUIDE 6REMOVE WOOD ROUTING JIG
FROM WOOD CEILING SURFACE 7
SQUARE CORNERS
5" 5"
Contractor is responsible for adequately reinforcing walls and/or ceilings to support xture weight. Focal Point, LLC accepts no responsibility for inadequately reinforced walls and/or
ceilings. The information contained in this drawing is the sole property of Focal Point, LLC. Any reproduction in part or whole without the written permission of Focal Point, LLC
is prohibited.
IS0608 REV. B 2018 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com 4 of 4
DRIVER SERVICE
1
EMERGENCY - INTEGRAL TEST SWITCH
DO NOT MATE CONNECTOR
UNTIL INSTALLATION
IS COMPLETE AND A.C.
POWER IS SUPPLIED
A B
BATTERY UNIT CONNECTOR INSIDE
SEE BATTERY
MANUFACTURER
INSTRUCTIONS
FOR EMERGENCY INTEGRAL
TEST SWITCH INSTALLATION
SEE FOCAL POINT
INSTRUCTION SHEET IS0609
C
CP HOUSING
10
CREATE TRIM RECESS
USING RABBETING BIT
/