TOOLS NEEDED: HARDWARE NEEDED:
Installation Instructions
Step-by-Step Installation Sequence
!
Hammer DrillHammer
Pencil
9/16"Wrench
Wire Brush
Level
Safety Glasses
Masonry Drill Bit Set
3/16", and 3/8"
Optional: (4) 3/8"
Rubber Washers
90130A050
(4) 3/8" x 5" 18-8
Stainless Steel Stud Anchors
92188A203
Product ships fully assembled.
Examine the footing or slab for damage or defects. The footing or slab should be reinforced concrete rated at a
3,000 psi minimum and be cured for at least 28 days prior to the installation of the receptacle.
CAUTION: Oversized holes and holes drilled too deep in the concrete will make it dicult to set the anchor.
Parkway Receptacles
SECTION A-A
SCALE 1:16
A A
1
1
2
2
A A
B B
1
002
OF
TRW40
1
REV
SHEET
1:??
SCALE
DATE
4/14/2008
DWG NO
TITLE
A
DRAWN
L. HERBER
SIZE
THIS DRAWING AND ALL ITS INCLUDED
INFORMATION IS THE PROPERTY OF
LANDSCAPE BRANDS. DO NOT USE OR
COPY WITHOUT WRITTEN PERMISSION.
THIS DRAWING IS CONFIDENTIAL AND IS
SUBJECT TO RETURN ON DEMAND.
ALL DIMENSIONS ARE IN INCHES
AND ALL ANGLES OR BENDS ARE 90
UNLESS OTHERWISE SPECIFIED
PRINT IS FOR FABRICATION
ONLY. SURFACES MAY PICK
UP .093
.0625 OF COATING.
TOLERANCES UNLESS NOTED:
X.XX ± .25 X.XXX ± .125 X.XXXX ± .0625
X.XXXXX ± .03125 ANGULAR ± 1
DO NOT SCALE DRAWING
211 N. Lindbergh Blvd.
St. Louis, MO
63141-7809
888-535-5005
www.landscapebrands.com
THIS DRAWING IS FOR PROTOTYPE OR TOOLING
USE ONLY. DO NOT USE FOR PRODUCTION.
REV DESCRIPTION ECN
TR.# DATE
DETAIL
002 ADDED FOOT MOUNT 01/03/2019
NOTES:
33.50
10.00
3.50
1.50
24.25
28.33
6.00
(4 PLCS)
.5000
(4 PLCS)
6.00"
(4 PLCS)
Ø.50"
(4 PLCS)
FOOT MOUNT VIEW
Copyright 2019 ANOV Manufactured in the U.S.
Note: Please contact Customer Care at 1-866-797-1761 when ordering replacement parts.
Installation Instructions
Step-by-Step Installation Sequence
1.
2.
3.
4.
Place receptacle in the desired location. Mark the location of the holes with a
pencil. To verify the alignment of the anchor markings you may reference the
bottom of page 1.
Evacuate debris from mounting holes using compressed air and a steel wire
brush. This will create a clean environment for the anchor system.
!
24
Locate an anchor and adjust the nut so it is ush with the top of the anchor to
protect the threads from being damaged. Insert the anchor into the hole.
01/07/2019
5
8.
!
5. Use the hammer to x the anchor into the drilled hole by giving it several
hammer blows.
6.
7.
Repeat steps 2 - 5 until all anchors are installed.
Remove the nuts and washers o of the anchors. Align the mounting holes of
the receptacle over top of the anchors and slide it down into place.
Care should be given to avoid rubbing the powder coating o the base. A
rubber washer is a suitable replacement option. Mount the receptacle to the
ground by placing a washer and a nut onto each anchor. Leave the hardware
nger tight until all of them have been installed. Verify that the receptacle is
level before tightening the anchors. Tighten all of the hardware with a 9/16"
wrench.
It is recommended that you start holes in sequential order from the
smaller to the larger drill bits to avoid oversized holes or holes drilled too
deep. Begin with a 3/16" diameter drill bit followed by the 3/8" diameter bit.
Parkway 40-Gallon Receptacles
7
8.1 8.2
  • Page 1 1
  • Page 2 2

Anova TRW40R Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI