Anova l2013 Installation guide

Type
Installation guide

This manual is also suitable for

Hammer Drill
(4) SS or Rubber Washers
90107A127 OR 90130A050
Masonry Drill Bit Set
1/4" & 1/2"
3/8" Drop-in Anchor
Setting Tool
Hammer
Pencil
Allen Wrench Set
7/32"
Wire Brush
Level
Safety Glasses
(4) 3/8" Drop-in Anchors
97083A310
(4) 3/8”-16 x 1” SS
Button Head Cap Screw
92949A624
anovafurnishings.com
888.535.5005 tel
TOOLS NEEDED: HARDWARE NEEDED:
Installation Instructions
Metrix Benches
Step-by-Step Installation Sequence
Product ships fully assembled.
Examine the footing or slab for damage or defects. The footing or slab should be reinforced concrete rated at a
3,000 psi minimum and be cured for at least 28 days prior to the installation of the bench.
CAUTION: Oversized holes and holes drilled too deep in the concrete will make it dicult to set the anchor.
!
FOOT MOUNT
A A
1
1
2
2
3
3
4
4
A A
B B
1
B01
5 FOOT METRIX CONTOUR BENCH
OF
L2010_SPEC-REV-B01
1
REV
SHEET
N/A
SCALE
DATE
7/16/2008
DWG NO
TITLE
B
DRAWN
C. O'HARA II
SIZE
THIS DRAWING AND ALL ITS INCLUDED
INFORMATION IS THE PROPERTY OF
LANDSCAPE BRANDS. DO NOT USE OR
COPY WITHOUT WRITTEN PERMISSION.
THIS DRAWING IS CONFIDENTIAL AND IS
SUBJECT TO RETURN ON DEMAND.
ALL DIMENSIONS ARE IN INCHES
AND ALL ANGLES OR BENDS ARE 90
UNLESS OTHERWISE SPECIFIED
PRINT IS FOR FABRICATION
ONLY. SURFACES MAY PICK
UP .093
.0625 OF COATING.
TOLERANCES UNLESS NOTED:
X.XX ± .25 X.XXX ± .125 X.XXXX ± .0625
X.XXXXX ± .03125 ANGULAR ± 1
DO NOT SCALE DRAWING
211 N. Lindbergh Blvd.
St. Louis, MO
63141-7809
888-535-5005
www.landscapebrands.com
24.63"
2.00"20.63"
27.82"
24.74"
56.00"
54.00"
35.40"
.76"
2.12"
18.82"
60.00"
56.00"
2.00"
REV DESCRIPTION ECN TR.# DATE
B00 UPDATED F0TLP'S, REMADE DRAWINGS
AND STANDARDIZED FORMAT NONE 03/17/09
B01 ADDED FOOT MOUNT VIEW NONE 11/19/18
3.47"
54.00"
22.63"
.40"
(4 PLCS)
WIDTH
LENGTH
Ø.40"
(4 PLCS)
FOOT MOUNT SIZE CHART
SKU # LENGTH WIDTH
L2010 54.00" 22.63"
L2012 42.00" 18.63"
L2013 54.00" 18.63"
L2014 66.00" 18.63
L2015 42.00" 22.63"
L2016 66.00" 22.63"
11/19/2018 Copyright 2019 ANOV Manufactured in the U.S.
Note: Please contact Customer Care at 1-866-797-1761 when ordering replacement parts.
Installation Instructions
Step-by-Step Installation Sequence
Metrix Benches
1.
3.
4.
6.
5.
7.
8.
9.
Place bench in the desired location. Mark the location of the holes with a
pencil. To verify the alignment of the anchor markings you may reference the
bottom of page 1.
It is recommended that you start holes in sequential order from the
smaller to the larger drill bits to avoid oversized holes or holes drilled too
deep. Begin with 1/4" diameter drill bit followed by the 1/2" diameter bit.
Evacuate debris from mounting holes using compressed air and a steel wire
brush. This will create a clean environment for the anchor system.
Use the 3/8" drop-in anchor setting tool and hammer to x the anchor into
the drilled hole by inserting the narrow end of the tool into the anchor and
giving it several hammer blows.
Insert one 3/8" drop-in anchor into the hole and use a hammer to tap the
anchor ush with the concrete.
Repeat steps 3 - 6 until all anchors are installed.
Align the mounting holes of the bench over top of the anchors.
Care should be given to avoid rubbing the powder coating o the foot.
A 3/8" rubber washer is a suitable replacement option. Mount the bench
to the anchors by fastening a button head cap screw and washer into each
anchor. Leave the hardware nger tight until all of them have been installed.
Verify that the bench is level before tightening the anchors. Tighten all of the
hardware with a 7/32" Allen wrench.
!
!
5
53
6
2.22.1
2. Thread a mounting plate into a threaded hole on the bottom of each leg of the
bench. Align the mounting hole to the out outer edge of the bench refer to
image 2.2 for clarity.
7
8.1 8.2
  • Page 1 1
  • Page 2 2

Anova l2013 Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI