  • Hello! I am an AI chatbot trained to assist you with the Danfoss Insulation EPS and XPS for SpeedUp Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1 2
3
4
5 6
7 8
9
10
min. 20 cm min. 20 cmmax. 30 cm
Instruction
Insulation EPS and XPS
For SpeedUp
Installation of additional insulation EPS / XPS
1
The substrate must be dry,
level and load bearing (Rough-
ness tolerance max. 3 mm/m).
2
Attach SpeedUp perimeter
insulation on the wall. Avoid
overlapping the ends.
Note!
Additional insulation ≥ 5 cm is
laid without perimeter insula-
tion but position the perimeter
insulation afterwards on the
additional insulation.
3
Lightly score corners of
perimeter insulation 3 cm from
below, inside corners from the
wall and outside corners from
room side.
4
Remove lap joints from the
first insulation panels to achieve
full coverage up to wall.
5
Lay insulation panels in a
staggered pattern and cross-laid
to the eventual direction of the
SpeedUp heat panels.
6
When cutting to fit the next
panel ensure that the lap joints
always. Only use whole panels
through thresholds.
7
Lighter constructions require
the insulation to be glued at
the perimeter, under SpeedUp
header panels and through
thresholds.
8
Second or third layers of insu-
lation must always be cross-laid
to the ones below. The last layer
must be cross-laid to SpeedUp
heat panels above.
9
Enclose pipe section (maxi-
mum width 30 cm according to
BEB/ZDB Information leaflet) and
fill up with bonded compound
level with insulation. Pipe sec-
tions with insulated pipes and
above 20 cm must be covered
with a 1 mm metal sheet.
Note!
For light floor constructions (e.g.
when laying laminate/parquet
directly on the heat panel and
all strongboard constructions)
pipe channels - in the additional
insulation - with a width of more
than 10cm must be covered with
a metal plate (min. 1 mm). If the
pipe channels have a width of
more than 15 cm a special load-
baring plate (min. 18 mm) must
be used.
10
Protect insulation from fre-
quent pedestrian traffic to avoid
damage.
Danfoss HES VI.CS.B1.02 © Danfoss 11/2008 1
/