SDC HDB1V User manual

  • Hello! I've reviewed the installation instructions for the SDC HDB1V and HDB2V glass door mounting kits. These instructions explain how to install the mounting kit with all the necessary shims and pads to achieve proper alignment. I am ready to answer any questions you might have about the installation process.
  • What is included in the mounting kit for 3/8" and 1/2" glass doors?
    What is included in the mounting kit for 5/8" glass doors?
    What tool is needed to secure the set screws?
BRACKET
BAR
STEP 1
INSTALL BRACKET AND BAR TO
GLASS DOOR
STEP 2
SET SCREW
SECURE SET SCREWS WITH THE
PROVIDED ALLEN WRENCH
RUBBER PADS
(2x)
11 GA. SHIM
(2x)
FOR 3/8” & 1/2" GLASS
DOORS: PLACE RUBBER PAD
& 11 GA. SHIMS ON BOTH
SIDES. PLACE 18 GA. SHIM
ON SET SCREW SIDE.
FOR 5/8” GLASS DOORS:
PLACE RUBBER PAD ON
BOTH SIDES (1) 11GA. SHIM &
(1) 18 GA. SHIM ON EACH
SIDES OF BRACKET.
INSTALL ARMATURE PLATE TO
BRACKET
STEP 4
FRAME HEADER
SIDE VIEW
GLASS DOOR CLOSED POSITION
STEP 5
ADJUST BAR (SEE STEP 1)
ADJUST ARMATURE PLATE
AS NEEDED FOR PROPER
ALIGNMENT BETWEEN
ARMATURE PLATE AND
EMLOCK SURFACE.
GLASS DOOR
18 GA. SHIM
(1x)
PLACE DOOR IN CLOSED
POSITION, FOLD TEMPLATE AS
INDICATED BY DOTTED LINE AND PLACE
TEMPLATE AGAINST FRAME HEADER AND
BRACKET THEN MARK AND DRILL AS INDICATED.
STEP 3
LOCK TEMPLATE
(PACKAGED w/LOCK)
FRAME HEADER
SIDE VIEW
GLASS DOOR CLOSED POSITION
RUBBER PADS
(2x)
SHIMS
(1) 18 GA.
(1) 11 GA.
SECURITY DOOR CONTROLS ■ WWW.SDCSECURITY.COM
[t] 800.413.8783 ■ 805.494.0622 ■ E-mail: [email protected] ■ 801 Avenida Acaso, Camarillo, CA 93012 ■ PO Box 3670, Camarillo, CA 93011
INSTALLATION INSTRUCTIONS
HDB1V
GLASS DOOR MOUNTING KIT
P:\INST INSTRUCTIONS\EMLOCKS\INST-HDB1V Rev D 04-22 Page 1
Any suggestions or comments to this instruction or
product are welcome. Please contact us through
our website or email engineer@sdcsecurity.com
SHIM
(1) 11 GA.
* For 5/8" Glass doors remove (1) 11 GA. shim
*
BAR
BRACKET
BAR
STEP 1
INSTALL BRACKET AND BAR TO
GLASS DOOR
STEP 2
SET SCREW
SECURE SET SCREWS WITH THE
PROVIDED ALLEN WRENCH
RUBBER PADS
(2x)
11 GA. SHIM
(2x)
FOR 3/8” & 1/2" GLASS
DOORS: PLACE RUBBER PAD
& 11 GA. SHIMS ON BOTH
SIDES. PLACE 18 GA. SHIM
ON SET SCREW SIDE.
FOR 5/8” GLASS DOORS:
PLACE RUBBER PAD ON
BOTH SIDES (1) 11GA. SHIM &
(1) 18 GA. SHIM ON EACH
SIDES OF BRACKET.
INSTALL ARMATURE PLATE TO
BRACKET
STEP 4
FRAME HEADER
SIDE VIEW
GLASS DOOR CLOSED POSITION
STEP 5
ADJUST BAR (SEE STEP 1)
ADJUST ARMATURE PLATE
AS NEEDED FOR PROPER
ALIGNMENT BETWEEN
ARMATURE PLATE AND
EMLOCK SURFACE.
GLASS DOOR
18 GA. SHIM
(1x)
LOCK TEMPLATE
(PACKAGED w/LOCK)
FRAME HEADER
SIDE VIEW
GLASS DOOR CLOSED POSITION
RUBBER PADS
(2x)
SHIMS
(1) 18 GA.
(1) 11 GA.
SECURITY DOOR CONTROLS ■ WWW.SDCSECURITY.COM
[t] 800.413.8783 ■ 805.494.0622 ■ E-mail: [email protected] ■ 801 Avenida Acaso, Camarillo, CA 93012 ■ PO Box 3670, Camarillo, CA 93011
INSTALLATION INSTRUCTIONS
HDB2V
GLASS DOOR MOUNTING KIT
P:\INST INSTRUCTIONS\EMLOCKS\INST-HDB2V Rev - 04-22 Page 1
Any suggestions or comments to this instruction or
product are welcome. Please contact us through
our website or email engineer@sdcsecurity.com
SHIM
(1) 11 GA.
* For 5/8" Glass doors remove (1) 11 GA. shim
*
BAR
STEP 3
PLACE DOOR IN CLOSED
POSITION, FOLD TEMPLATE AS
INDICATED BY DOTTED LINE AND PLACE
TEMPLATE AGAINST FRAME HEADER AND
BRACKET THEN MARK AND DRILL AS INDICATED
REPEAT TO BOTH SIDES OF DOORS.
/