IMPORTANT:
• ALLINSTALLATIONWORKSHOULDBEDONEBYACCREDITEDPROFESSIONAL.
• SHUTOFFPOWERSUPPLYATFUSEORCIRCUITBREAKER!
• USEONLYTHESPECIFIEDBULBS.DONOTEXCEEDTHEMAXIMUMWATTAGE!
AssemblyInstructions:7917-3P, 6P (Whitaker)
For Customer Service, please
contact the place of purchase.
PREPARING FOR INSTALLATION
Remove all of the contents from the carton. See the important notes above. Remove
the old xture from the ceiling, including the old mounting strap.
1.Fromthepartsbagremovethemountingstrapassembly.Oneendofnipple(F)shouldbe
attachedtomountingstrap(A)withhexnutandwasher(C&D)inplace.Theotherendshouldhave
canopyloop(H)attached.Attachmountingstrap(A)tothejunctionboxusingmountingscrews(B)
andascrewdriver.Tightensecurely.
2.Unscrewcanopyloopcollar(I)fromcanopyloop(H).Passcanopy(G)overthemountedcanopy
looptotesttheheight.Approximatelyhalfofthecanopyloop’sexteriorthreadsshouldbeexposed,
andthecanopyloopcollarshouldtsnuglyontothecanopyloop.Removecanopy(G)andadjust
theheightofnipple(F)andcanopyloop(H)untilthedesiredheightisreached.Removecanopy(G)
andcanopyloop(H)andplaceaside.
ASSEMBLING THE FIXTURE
3.Centerrod(S)isonthexture’swires,butnotconnectedtothexture.Connectcenterrod(S)to
lampbody(Q)atpost(R).Pullthewiresuntiltautandpullthewiresandcenterrod(S)throughthe
centerofmetalplate(M).
4.Cables(O)maybebundledtogether.Useaknifeandcarefullycuttheplasticties.Cables(O)
havelargeheads(T)attachedtotheends.Holdheads(T)andslidecables(O)throughthehooked
holesonmetalplate(M).Whenthecablesreachthebackofthehookedholes,letheads(T)come
torestonmetalplate(M).Seethediagram.
5.Pullthewiresuntiltaut.Slidetopcap(U)downthewiresandontometalplate(M).Threadtop
cap(U)intocenterrod(S).Threadtoploop(L)downontotopcap(U)andpullthewiresuntiltaut.
FINISHING THE INSTALLATION
8.Raisecanopy(G)totheceiling.Slidecanopyloop(H)andcanopyloopcollar(I)upbeneaththe
canopy.Tightlythreadcanopyloopcollar(I)ontocanopyloop(H)tosecurecanopy(G)inplace.
9.Installlightbulbs(notincluded)inaccordancewiththexture’sspecications.Donotexceed
themaximumrecommendedwattage.
Yourinstallationiscomplete.Turnonthepowerandtestthexture.
CLEANING TIPS
Treat the xture gently! Regular cleaning will reduce the need for deep cleaning. For regular cleaning, turn off the light and wipe down the
xture with a clean lint-free cotton or microber cloth. Never spray cleaner directly onto the xture.
How to Identify the Fixture’s Wires
Hot Neutral Ground
Smooth
Ribbed
Bare Metal,
Green, or
Green Inner
Thread
Black
White
Black Inner
Thread
White Inner
Thread
House Wires
Fixture Wires
Hot
CONNECTING THE WIRES
7.Haveanassistantsupportthexture’sweightwhilecompletingthewiring.Cutawayany
excesswireaddingatleast8to10inchesofwiretothedesiredlength.Threadthexture’swires
throughcanopyloop(H)andnipple(F).Refertothewiringdiagramandattachthexture’swires
tothepowersupplywiresfromthejunctionbox.ConnectHottoHot,NeutraltoNeutral,and
GroundtoGround.Twisttheendsofthewirepairstogether,andthentwistonawireconnector.
Makesurealltwistsareinthesamedirection.Ifthereisnohousegroundwirecomingfromthe
junctionbox,locategroundscrew(E)onthemountingbracket/mountingstrapandwrapthe
xture’sgroundwirearoundthegroundscrew.Useascrewdrivertotightenthetopofground
screw(E)ontothewiresandintothemountingbracket/mountingstrap.Tuckthewiresintothe
junctionbox.
6.Bymeasuring,determinethecorrectnumberofchainlinksneededforproperhangingheight.Ifnecessary,useapairofpliers
toopenandremoveanyexcesschain(J).Attachonechainconnector(K)toeachendofchain(J).Twistthesidelocktosecurethe
connectorinplace.Connectoneofchainconnectors(K)totoploop(L)andclosethatchainconnectoraswell.Feedthexture’swires
upthroughthechain(everythreelinksorso),pullingthewiresuntiltaut.Usethefreechainconnector(K)toattachchain(J)tocanopy
loop(H).Untwistcanopyloopcollar(I)fromcanopyloop(H)toallowcanopy(G)tobeaddedtothechain.Feedthewiresupthrough
thechain.Allowcanopy(G)todropdownontothechain/wire.
NOTE: Please use the attached hexagonal spanner tool to
tighten the center rod until the cables are tight. Then double
check that the shade is straight.