Land Pride 472620, Z44 Accu-Z Razor, Z52 Accu-Z Razor User manual

  • Hello! I am an AI chatbot trained to assist you with the Land Pride 472620 User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
©2006 Printed
Z44 and Z52 Accu-Z Razor (S/N 472620 and above)
Riding Mowers
357-044SM
Service Manual
9/24/09
23802
Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM 9/24/09
©Copyright 2006 All rights Reserved
Land Pride provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been taken in the preparation of this manual, Land
Pride assumes no responsibility for errors or omissions. Neither is any liability assumed for damages resulting from the use of the information contained herein. Land Pride reserves
the right to revise and improve its products as it sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.
Land Pride is a registered trademark.
All other brands and product names are trademarks or registered trademarks of their respective holders.
Printed in the United States of America.
3
9/24/09 Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM
Land Pride
SECTION 1: OPERATOR CONTROLS . . . 4
STEERING ARM REMOVAL . . . . . . . . . . . . . . . . . 4
STEERING ARM INSTALLATION . . . . . . . . . . . . . 4
PARK BRAKE REMOVAL . . . . . . . . . . . . . . . . . . . 5
PARK BRAKE INSTALLATION . . . . . . . . . . . . . . . 7
CONTROL ARM AND SHAFT REMOVAL . . . . . . . 9
CONTROL ARM AND SHAFT INSTALLATION . . 12
DECK LIFT REMOVAL . . . . . . . . . . . . . . . . . . . . 15
DECK LIFT INSTALLATION . . . . . . . . . . . . . . . . 17
CONTROL PANEL REMOVAL . . . . . . . . . . . . . . 20
CONTROL PANEL INSTALLATION . . . . . . . . . . 21
SECTION 2: SEAT AND FRAME . . . . . . . 22
SEAT REMOVAL . . . . . . . . . . . . . . . . . . . . . . . . . 22
SEAT INSTALLATION . . . . . . . . . . . . . . . . . . . . . 24
FLOOR PANEL REMOVAL . . . . . . . . . . . . . . . . . 27
FLOOR PANEL INSTALLATION . . . . . . . . . . . . . 27
BUMPER REMOVAL . . . . . . . . . . . . . . . . . . . . . . 28
BUMPER INSTALLATION . . . . . . . . . . . . . . . . . . 28
SECTION 3: MOWER DECK . . . . . . . . . . 29
DECK REMOVAL . . . . . . . . . . . . . . . . . . . . . . . . 30
DECK INSTALLATION . . . . . . . . . . . . . . . . . . . . 31
PULLEY AND BLADE HUB REMOVAL . . . . . . . . 33
PULLEY AND BLADE HUB INSTALLATION . . . . 34
SECTION 4: ELECTRICAL SYSTEM . . . . 35
BATTERY ASSEMBLY REMOVAL . . . . . . . . . . . 35
BATTERY ASSEMBLY INSTALLATION . . . . . . . 36
WIRING HARNESS REMOVAL . . . . . . . . . . . . . . 37
WIRING HARNESS INSTALLATION . . . . . . . . . . 38
WIRING SCHEMATIC . . . . . . . . . . . . . . . . . . . . . 39
SECTION 5: FUEL SYSTEM . . . . . . . . . . 39
FUEL SYSTEM REMOVAL . . . . . . . . . . . . . . . . . 40
FUEL SYSTEM INSTALLATION . . . . . . . . . . . . . 41
SECTION 6: WHEELS . . . . . . . . . . . . . . . 42
FRONT CASTER WHEEL REMOVAL . . . . . . . . . 42
FRONT CASTER WHEEL INSTALLATION . . . . . 44
REAR DRIVE WHEEL REMOVAL . . . . . . . . . . . . 46
REAR DRIVE WHEEL INSTALLATION . . . . . . . . 47
SECTION 7: POWER TRAIN . . . . . . . . . . 48
MUFFLER REMOVAL . . . . . . . . . . . . . . . . . . . . .48
MUFFLER INSTALLATION . . . . . . . . . . . . . . . . .49
ENGINE REMOVAL . . . . . . . . . . . . . . . . . . . . . . .49
ENGINE INSTALLATION . . . . . . . . . . . . . . . . . . .52
CLUTCH REMOVAL . . . . . . . . . . . . . . . . . . . . . .54
CLUTCH INSTALLATION . . . . . . . . . . . . . . . . . .55
TRANS-AXLE REMOVAL . . . . . . . . . . . . . . . . . .56
TRANS-AXLE INSTALLATION . . . . . . . . . . . . . .59
SECTION 8: ADJUSTMENTS . . . . . . . . . . 62
TORQUE VALUES CHART . . . . . . . . . . . . . . . . .63
TIRE INFLATION CHART . . . . . . . . . . . . . . . . . .63
TORQUE VALUES . . . . . . . . . . . . . . . . . . . . .64
STEERING LINKAGE . . . . . . . . . . . . . . . . . . . . .64
CONTROL LEVER NEURAL ADJUSTMENT . . . .65
STEERING DAMPER . . . . . . . . . . . . . . . . . . . . .65
SEAT ADJUSTMENT . . . . . . . . . . . . . . . . . . . . . . 66
UPPER CONTROL LEVER ADJUSTMENTS . . . .66
HEIGHT ADJUSTMENT . . . . . . . . . . . . . . . . .66
REACH ADJUSTMENT . . . . . . . . . . . . . . . . . .66
FORWARD TRAVEL ADJUSTMENT . . . . . . .66
HYDRO-DRIVE BELT BELT ADJUSTMENT . . . .67
DECK LEVELING ADJUSTMENTS . . . . . . . . . . .67
ENGINE RPM SETTING . . . . . . . . . . . . . . . . . . .67
DECK LEVELING & HEIGHT ADJUSTMENTS . .67
DECK LEVEL ADJUSTMENTS . . . . . . . . . . . .67
DECK CUTTING HEIGHT ADJUSTMENT . . . . . .70
ANTI-SCALP ROLLERS . . . . . . . . . . . . . . . . . . .70
PIVOT FRONT WHEELS . . . . . . . . . . . . . . . . . . .70
Table of Contents
4
SECTION 1: OPERATOR CONTROLS
Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM 9/24/09
Land Pride
STEERING ARM REMOVAL
1. Loosen and remove two steering arm retaining bolts.
2. Slide steering arm up and off of the drive control stub.
3. Repeat steps 1 through 2 for other side.
photo zsm176
STEERING ARM INSTALLATION
1. Slide steering arm to desired height and install pivot
bolt and nut.
NOTE: Do not tighten at this time.
2. Install bolt and nut in arm adjustment slot.
3. Adjust arms to desired angle.
photo zsm088
4. Tighten all fasteners to standard torque. See chart on
page 63.
5. Repeat steps 1 through 4 for other side.
photo zsm175
SECTION 1: OPERATOR CONTROLS
5
SECTION 1: OPERATOR CONTROLS
9/24/09 Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM
Land Pride
PARK BRAKE REMOVAL
1. Disconnect battery to prevent accidental shock and
chock wheels for safety.
NOTE: For ease of access seat pan assembly may be
removed.
2. Loosen and remove battery hold-down bracket.
NOTE: For ease of access remove battery and
battery tray.
3. Remove brake return spring from battery hold-down
post and park return link.
photo zsm164
4. Remove hair cotter pin from park linkage rod.
5. Remove park return link, and pull the park linkage rod
from the control pivot shaft.
photo zsm082
6. Remove hair cotter pin, and hardware, from park
return link at rear of unit.
7. Remove park link rod from the park lever shaft
weldment.
photo zsm111
6
SECTION 1: OPERATOR CONTROLS
Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM 9/24/09
Land Pride
8. Remove hair cotter pins and hardware from upper and
lower sections of the spring link clip.
9. Remove spring link clips from the park lever shaft
weldment and parking paw.
10. Repeat step 9 for spring link clip on other side.
photo zsm058
11. Loosen and remove bolt from park shaft bushing
plate.
12. Repeat step 11 for park shaft bushing plate on other
side.
13. Remove park lever shaft weldment.
photo zsm267
7
SECTION 1: OPERATOR CONTROLS
9/24/09 Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM
Land Pride
PARK BRAKE INSTALLATION
1. Install park shaft bushing plate on to one trans-axle.
NOTE: Do not tighten at this time.
2. Place one matching end of park lever shaft weldment,
with bushing, into shaft bushing plate installed in step 1.
photo zsm261
3. Place park shaft bushing plate and bushing on other
end of park lever shaft.
4. Align and install park lever shaft weldment and
bushing plate on the opposite side installed in step 1 to
trans-axle.
5. Tighten all fasteners to standard torque. See chart on
page 63.
photo zsm268
6. Assemble spring link clips and align and install on the
park lever shaft weldment and parking paw.
7. Secure spring link clip assembly with hair cotter pins
and hardware.
8. Repeat steps 6 through 7 for other side.
photo zsm059
8
SECTION 1: OPERATOR CONTROLS
Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM 9/24/09
Land Pride
9.Insert park linkagerod throughframeand attachtothe
park lever shaft weldment.
NOTE: Ensure that the park linkage rod is correctly
aligned under the control pivot shaft.
10. Secure park linkage rod to park lever shaft weldment
with cotter pin and hardware.
photo zsm111
11.Alignandinstall park linkagerodintothecontrolpivot
shaft.
12. Align and install park return link onto park linkage
rod.
NOTE: Ensurethatthecurveofthereturnpark link is
installed toward the control pivot shaft.
13. Secure return park link and park linkage rod with hair
cotter pin.
photo zsm081
14. Align and install brake return spring from battery
hold-down post and park return link.
15. Align and install battery hold-down bracket.
16. Reconnect battery and remove chocks from wheels.
photo zsm015
9
SECTION 1: OPERATOR CONTROLS
9/24/09 Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM
Land Pride
CONTROL ARM AND SHAFT REMOVAL
1. Disconnect battery to prevent accidental shock and
chock wheels for safety.
NOTE: For ease of access seat pan assembly may be
removed.
2. Loosen and remove battery hold-down bracket.
3. Remove battery and battery tray. See battery
assembly removal instructions on page XX.
photo zsm166
4. Disconnect and remove park return link and linkage
rod. See park brake removal instructions on page XX.
5. Remove steering arms. See steering arm removal
instructions on page 4.
6. Loosen set screw on brake lever and remove handle.
photo zsm076
7. Unlock and remove retaining cap on rod end of drive
control damper.
NOTE: Damage may occur to damper if cap is not
unlocked before removal.
8. Remove drive control damper from ball stud on steer
arm support.
9. Repeat steps 7 through 8 for other side.
photo zsm079
10
SECTION 1: OPERATOR CONTROLS
Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM 9/24/09
Land Pride
L
10. Loosen set screw on steer arm support locking collar.
11. Repeat step 10 for other side.
photo zsm070
12. Loosen set screw on the park brake interlock.
NOTE: Set screw must be fully screwed out to clear
alignment cut-out on the control pivot shaft.
13. Repeat step 12 for other side.
photo zsm0705
14. Loosen and remove the nuts securing the pump
adjuster rod on both ends.
15. Remove the pump adjuster rod.
NOTE: For ease of removal, angle rod in steer arm
support.
16. Repeat steps 14 through 15 for other side.
photo zsm087
11
SECTION 1: OPERATOR CONTROLS
9/24/09 Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM
Land Pride
17. Slide the control pivot shaft to the right to allow
removal of the left hand steer arm support and hardware.
NOTE: Control pivot shaft will not slide to the left
due to park linkage rod mount location.
photo zsm092
18. Remove the left hand steer arm support, brake
interlock, and locking collar from control pivot shaft.
19. Slide the control pivot shaft to the left and back
through frame mount.
20. Remove the right hand steer arm support, brake
interlock, and locking collar from the control pivot.
photo zsm091
21. Remove the control pivot shaft from frame by sliding
the right side up and through the steer arm support
opening.
22. Once control pivot shaft has cleared the left side of
frame, slide left and out of unit.
photo zsm098
12
SECTION 1: OPERATOR CONTROLS
Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM 9/24/09
Land Pride
CONTROL ARM AND SHAFT
INSTALLATION
NOTE: Critical to correct installation that the control
pivot shaft is installed into unit with park linkage rod
mount to the left side.
1. Slide right side of control pivot shaft through the right
hand steer arm support opening.
2.Continuetoslidecontrolpivotshafttotherightuntilleft
side clears the frame and can be aligned into the left
hand control pivot shaft mounting hole.
photo zsm098
3.Slidecontrol pivot shaft totheleftandinstall right hand
lock collar, steer arm support and brake interlock.
4. Align right hand control assembly with control pivot
shaft mounting hole and slide shaft to the right.
photo zsm096
5.Slidecontrol pivot shaft totherightandinstall left hand
lock collar, steer arm support and brake interlock.
6. Align left hand control assembly with control pivot
shaft mounting hole and slide the shaft left.
7. Align and install the pump adjuster rod onto the steer
arm support and the bell crank lever.
8. Repeat steps 6 through 7 for other side.
9. Tighten all fasteners to standard torque. See chart on
page 63.
photo zsm086
13
SECTION 1: OPERATOR CONTROLS
9/24/09 Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM
Land Pride
10. Align and install brake handle into control pivot shaft.
11. Tighten set screw for brake handle.
photo zsm077
12. Align park brake interlock with cut-out in the control
pivot shaft and seat set screw down for alignment.
NOTE: Do not tighten set screw on brake interlock at
this time.
13. Align control assembly and secure with lock collar.
14. Repeat steps 12 through 13 for other side.
photo zsm071
15. Place brake handle in the lock position.
16. Tighten set screw in the park brake interlock.
NOTE: Ensure that the park brake interlock is in the
locked position.
photo zsm074
14
SECTION 1: OPERATOR CONTROLS
Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM 9/24/09
Land Pride
17. Align and install the drive control damper on to the
ball stud of steer arm support.
18. Secure drive control damper with retaining cap on
rod end.
photo zsm080
19. Align and install steering arms. See Steering arm
installation on page 4.
20. Install battery tray. See battery assembly instillation
on page XX.
21.Align andinstallpark returnlink and linkagerod. See
park brake instillation instructions on page 7.
photo zsm013
22. Align and install battery hold-down bracket.
23. Reconnect battery and remove chocks from wheels.
photo zsm174
15
SECTION 1: OPERATOR CONTROLS
9/24/09 Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM
Land Pride
DECK LIFT REMOVAL
1.Block wheelsforsafety andplaceblocks undermower
deck.
2. Remove deck height stop and lower deck onto blocks.
NOTE: Ensure that deck chains have slack when the
lift arm is fully lowered.
photo zsm198
3. Loosen and remove bolt from deck chain on the deck
lift pivot.
4. Repeat step 3 for the other three deck chain
assemblies.
NOTE: The front left deck chain is attached to the lift
adjusting yoke.
photo zsm203
5. Remove e-ring clip from deck height pawl pin and
remove pin.
6. Remove deck height pawl.
photo zsm208
16
SECTION 1: OPERATOR CONTROLS
Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM 9/24/09
Land Pride
7. Remove e-ring clip from deck height gage trunion.
8. Remove deck height gage bar trunion from the lift
pedal lever.
photo zsm211
NOTE: Start deck lift rod removal at front to release
spring tension.
9. Loosen lift rod trunion jam nuts.
10. Remove e-ring from lift rod trunion and pull trunion
from the deck lift pivot.
photo zsm199
11. Remove lift rod trunion and jam nuts.
12. Loosen and remove spring tensioner nut,
compression washer, spring, and tension washer.
photo zsm215
17
SECTION 1: OPERATOR CONTROLS
9/24/09 Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM
Land Pride
13. Loosen and remove rear lift rod trunion and jam nuts.
photo zsm221
14. Remove e-ring clip from rear lift rod trunion and
remove trunion from deck lift pivot.
photo zsm218
15. Repeat steps 9 through 14 for other side.
18
SECTION 1: OPERATOR CONTROLS
Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM 9/24/09
Land Pride
DECK LIFT INSTALLATION
1. Align and install rear lift rod trunion in deck lift pivot.
2. Secure rear lift rod trunion with e-ring clip.
photo zsm220
3. Install trunion jam nut on lift rod. Thread jam nut 3"
onto lift rod.
4. Align and install lift rod into rear lift rod trunion through
spring tension bracket.
5. Install the outer trunion jam nut and thread on 1" from
end of rod to flange of jam nut.
6. Snug the inner trunion jam nut. This will be tightened
during the adjustment of rods.
photo zsm216
7. Align and install spring tension washer, spring,
compression washer and tension nut on lift rod.
8. Compress spring with tension nut. Ensure to tighten
the tension nut far enough on to install front trunion.
photo zsm214
19
SECTION 1: OPERATOR CONTROLS
9/24/09 Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM
Land Pride
9. Install inner jam nut on front of lift rod.
10.Installfronttrunionandalignwithdeckliftpivotmount
hole.
11. Install outer jam nut.
12. Snug the jam nuts to front trunion. This will be
tightened during the adjustment of the rods.
photo zsm226
13. Install front lift rod trunion into the deck lift pivot.
14. Secure front lift rod trunion with e-ring clip.
15. Repeat steps 1 through 14 for other side.
photo zsm227
16.Align andinstall deckheight gagebar trunion intothe
lift pedal lever.
17. Secure height gage bar trunion with e-ring clip.
photo zsm211
20
SECTION 1: OPERATOR CONTROLS
Z44 and Z52 Accu-Z Razor (S/N 472620 and above) Riding Mowers 357-044SM 9/24/09
Land Pride
18. Align and install deck height gage bar in frame.
19. Align and install deck height pawl and pin.
20. Secure deck height pawl with e-ring clip.
photo zsm209
21. Align and install deck lift chain in deck lift pivot.
22. Repeat step 21 for other three deck chain
assemblies.
NOTE: Front left deck lift chain is installed with the
lift adjusting yoke.
photo zsm204
23. Install deck height stop.
24. Adjust deck lift rods for correct operation. See deck
adjustment on page 67.
25. Remove chock and deck blocks.
photo zsm197
/