quadient PSD User guide

  • Hello! I've reviewed the provided user guide for the iX-9 Series iX-9 Mailing system. This manual describes step-by-step instructions for safely replacing the meter including unlocking, removing and installing new one with power-up procedure and on-screen prompts included. Please, ask me any question you have about the device and this guide.
  • What is the first step in replacing the meter?
    How to unlock the meter?
    What is the final step after installing new meter?
iX-9 Series
Meter Replacement
1. Remove the Existing Meter From your Mailing System
2. Unpack Replacement Meter
Remove replacement meter from the box and place
original meter back into the box to prepare the return.
3. Install New Meter
OK
Swap meter
This procedure allows to install
your new meter in the machine
Once the mailing system has been powered on, follow
the on-screen prompts to complete the swap process.
Turn on the mailing system using the
power switch.
Turn o the mailing system using
the power switch.
4. Power Up the Mailing System
Congratulations! Your iX-9 Mailing System is Ready to Use
A0134466/A - 21/07/2020
Place the meter into the meter bay (a) and slide in until it fits securely
into position (b). Close the mailing system cover.
       


Meter Serial
Number
Lift the cover of the mailing system base (a). Unlock the meter by pressing on the
raised area and pulling it towards you (b). Remove the meter from the base (c).
For additional information visit :
kb.quadient.us/ix9
        


/