Lian Li PC-X1000 Installation guide

Category
Computer cases
Type
Installation guide
C50.X10000.00E-1
Side panels installation
Loose the screw and pull the
latch to release the side panel.
Remove the side panel. Adding a lock to secure the
hardware.
5.25” bezels
Loose thumb screws to remove the
HDD cage.
Insert HDD, secured with thumb
screws.
Insert the HDD cage to the mounting
position.
Patented tool-less
5.25” device
mounting kit
Patented Tool-less
PCI add-on card
holder
HDD cage
Power mounting
bracket
Liquid-cooling
system tube vents
with rubber cover
Side panel latch
and lock
3-speed fan
controller
3.5" Hard disk installation
2.5" Hard disk installation
Hardware list
PCI card holder-S(1)
PCI card holder-L(6)
Thumb screw(7)
for PCI card holder
Thumb screw(2)
(5)
(2)
1
for cable management
(4)
Thumb screw(6)
for mount
(9)
Stand off
Hex wrench for M/B(1)
stand-off
SATA cable(2)
for HDD
Box(1)
for spare parts
Thumb screw(3)
for mount
Rubber ring(10)
for HDD mounting
for fix CD-ROM
Screw (10)
for 2.5” HDD
Rubber(4)
for 5.25" ODD bezel
140mm fans
140mm fan
140mm fans with
air filter
5.25" to 3.5"
convertor
6
6
4
2
10
8
4
2
8
10
6
2
4
10
8
USB
5
5
3
1
9
7
1394
3
1
7
9
5
1
3
9
7
USB
4
2
10
6
8
3
1
9
5
7
HD AUDIO
AC'97
10
9
8
6
7
5
2
4
1
3
MIC
EAR
Blue(PORT2 L)
Black(SENSE SEND)
Yellow(PORT2 R)
Brown(PORT1 R)
Red(PORT1 L)
Green(SENSE2 RETUR)
KEY
Orange(SENSE1 RETUR)
Black(PRESENCE)
Black(GND)
Black(AGND)
NC
Yellow(R-RET)
KEY
Blue(L-RET)
Red(MIC)
Brown(MIC-PWE)
Yellow(R-OUT)
Blue(L-OUT)
KEY
Black(GND)
Green
White
Red
Black(GND)
Green
White
Red
KEY
Black(GND)
Green
White
Red
Black(GND)
Green
White
Red
Black(KEY)
White(+12V)
Green(TPB+)
Black(VG)
Blue(TPA+)
SATA
USB
USB
IEEE1394
E-SATA
Connector
Black(GND)
White(+12V)
Red(TPB-)
Black(VG)
Orange(TPA-)
140mm fan with
air filter
Multi-media port
2.5" HDD mounted to the anti-vibration
HDD cage.
Thumb screw(26)
for HDD mounting
Fasten the thumb screw to secure
the HDD cage.
I/O port installation
for power supply mounting
PSU tray installation
C50.X10000.00E-2
ODD installation
4. By pressing plastic
handle to release the
mounting bracket.
5. Push the CD-ROM into the ODD cage
module, close the bracket to secure.
6. Reverse previous steps for installation
bezel & converter.
Adding the rubber pad to ODD's
eject bottom, when 5.25" ODD
bezel couldn't reach to the ODD.
Removable upper double fan module
VGA card pillar installation guide
1
2
3
4
1. Remove the 5.25" to 3.5" converter. 2. Remove the 5.25" ODD
bezel.
3. Slide the 5.25" ODD bezel
downwards to remove it.
Remove the HDD cage for long
PSU.
Removable fan module
Loosing four screws to remove fan
module.
Follow the arrow to remove the filter, press the
plastic clips to release the washable air filter.
Loosing two screws to remove fan module,
and it also equipped with washable air filer.
Loose the thumb screws to
release the M/B tray.
PCI Add-on card installation
Loosing four thumb screws to remove
the PSU mounting bracket.
Assembling the power supply with
PSU mounting bracket, and push
in gently.
Fasten four thumb screws to the case
to secure.
Insert the PCI add-on card holder into
slot on the pillar.
Press the end of the rolder, and push
it into the slot.
Insert the screw. Tighten the screw to push in the
holder to against the card.
If you wish to use the
5.25" ODD bezel,
please adjust the metal
pin position on the
mounting bracket
1
2
Open the aluminum latch to
remove the PCI slot bracket.
Push the card into the PCI slot,
close the aluminum latch to
secure the card.
Secure the stand-off on the M/B tray which match
with the M/B fix points, place the M/B on the stand-off
fasten with the thumb screws to secure.
!
Note: For area where hard
to reach use the
long thumb screw
!
!
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8

Lian Li PC-X1000 Installation guide

Category
Computer cases
Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI