Danfoss SpeedUp - Liquid screed User guide

  • Hello! I am an AI chatbot trained to assist you with the Danfoss SpeedUp - Liquid screed User guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Application sheet
SpeedUp
Carpet / tiles / parquet / laminate / synthetics
Liquid screed
1
2
3
4
5
1 Carpet / tiles / parquet
2 Liquid screed (≥ CAF F5) 35 mm
3 System foil
4 SpeedUp heat panel + FH composite pipe 30 mm
5 Support batten (30mm)*
6 Additional insulation EPS 035 DEO 20 mm
7 Basic perimeter insulation
8 If necessary moisture barrier
Floor nish NA mm Carpet / tiles / parquet / laminate / synthetics
Construction height 85 mm Height excluding oor nish
Weight ~ 74 kg / m² Weight excluding oor nish
Thermal resistance R 1,43 m²K / W The minimum thermal resistance requirement of DIN EN 1264 is
fullled.
Thermal transmission coecient U 0,63 W / m²K If the architectural design species better thermal insulation, this
must be taken into account.
Design load ≤ 2,0 kN / m²
Point load (≥ 20 cm²) ≤ 1,0 kN
Impact subsonic noise reduction NA dB
Application area
Residential spaces, hallways and attic spaces in residential buildings and hotel rooms.
Corresponds to categories A1, A2 and A3 of DIN 1055-3.
Requirements & special features
Structural sealing according to DIN 18195 must be placed beneath the oor panel in case
of structures facing the ground, and otherwise on the unnished oor. The R value must
be increased if the groundwater level is less than or equal to 5 m. A U value not exceed-
ing 0.5 W/m²K must be maintained in existing buildings and additions with areas up to
50 m². * Construction without a stabilising support batten is also possible. For CAF-F4
self-levelling screeds a screed thickness of 40 mm must be maintained. The screed thick-
nesses must be adjusted in case of higher design load or point load values. Observe all
installation instructions and manufacturer’s instructions.
Additional insulation
20 mm EPS 035 DEO; existing buildings: 40 mm
Construction
According to EnEV, EN 1264, DIN 1055, 18195, 18202 and 18560
Construction number 77
Technical Data Floors/ceilings facing unheated rooms or the ground
6
7
8
© Danfoss 11/2008
VA.CR.K1.02
Danfoss HES
/