Athens Stonecasting 04-914213TR Operating instructions

Type
Operating instructions
Assembling Your 2 Tier Acorn Leaf Fountain
Caution: Keep children and others from climbing, sitting, or leaning on the fountain
and its components. Failure to do so could cause serious injury.
Fountains have no interlocking component parts.
Fountain parts are held by gravity only.
ASSEMBLY INSTRUCTIONS:
1. Place Pedestal (A) on level, rm foundation.
Use a level and shims to assure bowl is level.
2. Balance bottom bowl (B) on pedestal (A)
3. Place pump into pump cavity of bowl (B). Guide electrical plug thru hole
in bottom of bowl and drop cord thru pedestal (A).
4. Center bowl (B) over pedestal (A)
5. Wrap cord plug around cord and wedge tightly in hole in bottom of bowl(B).
6. Fill around plug with silicon, fountain putty, or plumbers putty and allow to set
up.
7. Attach hose to center of pump. ** Be sure not to let hose kink.
8. Level with plastic shims.
9. Position center pedestal/riser (C) over pump cavity.
10. Guide hose thru top bowl (D) and position in center of pedestal/rise (C).
11. Level top bowl (D) with plastic shims. Cut off excess hose. Leave 2 - 3 inches
for topper (E).
12. Sit topper (E) on top bowl (D) and slide hose into bottom of topper (E).
13. Fill fountain with water. Plug pump cord into 110 volt GFI outlet.
14. Pump has a ow control slide switch with can be adjusted to modify
water ow to reach desired volume.
MATERIALS LIST:
-Pump
-Hose
-4' Level
-Plastic Shims or Metal Washers
- Silicone or Fountain Putty
A
B
C
Contact:
D
E
  • Page 1 1

Athens Stonecasting 04-914213TR Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI