Installation Instructions
Model # ONW-P-1001-SP-W
Model # ONW-P-1001-SP-V
Model # ONW-P-1001-SP-LA
Model # ONW-P-1001-SP-G
Model # ONW-P-1001-SP-B
NeoSwitch Passive Infrared (PIR) Technology
Low Voltage Occupancy Sensing Wall Switch
• Readallinstructionsonbothsidesofthissheetfirst
• InstallinaccordancewithALLlocalcodes
• Forindooruseonly
• ForusewithGreengateSwitchpacks&Systems
Only.Forusewithothersystems,contact
TechnicalSupport
• DonotrunanyGreengateLowVoltagewiringinthe
sameconduitaspowerconductors
General Information
Technology:PassiveInfrared(PIR)
Electrical Ratings:
Input:
• 10-30VDCfromGreengateSwitchpackor
GreengateSystem.Maximumcurrentneededis
25mApersensor.
Output:
• OpencollectorouputtoswitchuptotenGreengate
Switchpacks.
• IsolatedFormCRelay
• IsolatedFormCRelayRatings:1A30VDC/VAC
Time Delays:Self-Adjusting,15seconds/test(10min
Auto),Selectable5,15,30minutes
Coverage:Majormotion–1000sq.ft.
Minormotion–300sq.ft.
Light Level Sensing:0to200foot-candles
Operating Environment:
• Temperature:32°F–104°F(0°C–40°C)
• RelativeHumidity:20%to90%Non-condensing
Housing:Durable,injectionmoldedhousing.
PolycarbonateresincomplieswithUL94VO.
Size:
• MountingPlate/StrapDimensions:
4.195"Hx1.732"W(106.553mmx44mm)
• ProductHousingDimensions:2.618"Hx1.752"
Wx1.9"D(66.5mmx44.5mmx48.26mm)
LED Indicators:RedLEDindicatesPIRdetection;
GreenLEDactsasEcoMeterornightlightlocator.
Specifications
Description
Coverage
TheONW-P-1001-SPOccupancySensingWallSwitchisaPassiveInfrared(PIR)motionsensinglightingcontrol
andconventionalWallSwitchall-in-one,usedforenergysavingsandconvenience.
PIR Technology
Thesensor’ssegmentedlensdividesthefieldofviewintosensorzones,anddetectsthechangesintemperature
thatarecreatedwhenaperson,orpartofapersonassmallasahand,passesintooroutofasensorzone.
TheONW-P-1001-SPallowsthecontrolofoneGreengateswitchpackorinputtoaGreengatePanel.
Thesensormaybeinterfacedtoanenergymanagementsystemthatacceptseitheranormallyopenornormally
closeddrycontactviathesensor’sFormCrelay.
ThesensorcanbeconfiguredtoenhanceenergysavingsbysettingtheunitformanualONoperation.
InAutomaticONMode,thelightsturnONautomaticallywhenapersonenterstheroom.InManualONMode,the
lightsareturnedONbypressingtheuniversallyrecognizedlighticonPushbutton.Ineithermode,thelightsstayON
aslongasthesensordetectsmotionintheroom.Whentheroomisvacated,thelightsturnOFFautomaticallyafter
apresetTimeDelayinterval.
Thesensorincludesself-adaptivetechnologythatcontinuallyadjuststoconditions
byadjustingsensitivityand
TimeDelayinReal-time.ByadjustingsensitivityandTimeDelayautomatically,thesensorismaximizingthepotential
energysavingsthatareavailableintheparticularapplication.
TheEcoMeterprovidesavisualindicatorofenergyusage,increasingenduserawarenessandreminding
individualstotakecontroloftheirlightingtomaximizeenergysavings.
TheDaylightingfeaturepreventslightsfromturningON,whentheroomisadequatelyilluminatedbynaturallight.
Walk-ThroughfeaturemaximizesenergysavingsbynotleavingthelightsONafteramomentaryoccupancy.The
sensorwillswitchthelightsONwhenitdetectsapersonenteringthearea.Ifthesensordoesnotcontinuetodetect
motion20secondsfollowingtheinitialactivation,itwillautomaticallygotoashorter2minuteTimeDelay.
TrackingModeallowstheloadconnectedtotheFormCrelaytofollowthestateofthesensor’sbluelead.
HVACModeallowstheloadconnectedtotheFormCrelaytoremainONwhenthelightsareturnedOFFmanually.
ApplicationsmayincludekeepingtheroomatadesiredtemperaturewhilegivingapresentationandthelightsareOFF.
TheONW-P-1001-SPisdesignedforofficesupto300squarefeet.
Location
WheninstallingtheONW-P-1001-SPinanewjunctionbox,choosetheswitchlocationcarefullytoprovide
optimumcoverageoftheoccupiedarea.WhenreplacinganexistingWallSwitch,bearinmindthattheremustbea
clearLine-of-sightbetweenthesensorandtheareatobecovered.AvoidpointingtheONW-P-1001-SPdirectlyinto
thehallwaywhereitmaydetectpassers-by.
EcoMeter Operation
Load 1 EcoMeter LED
OFF ON
ON OFF
Action EcoMeter Benefit
Apersonentersthespaceand
theloadisactivated
OFF
Theareaisvacatedandthe
lightsturnOFFautomatically
ON
Increasedawarenessofenergysavings;
Actsasanightlightlocator
ApersonturnsthelightsOFF
manuallyuponexitinganarea
ON
Increasedawarenessofenergysavingsand
remindsindividualstotakecontroloftheir
lightingforadditionalsavings;Actsasanight
lightlocator
Thedaylightfeatureprevents
thelightsfromautomatically
turningONwhenaperson
entersanarea
ON
Increasedawarenessofenergysavingsand
letsindividualknowthatthedaylighting
featureisworking
Wiring
CAUTION: Before installing or performing any service on a Greengate system, the power MUST be turned OFF
at the branch circuit breaker. According to NEC 240-83(d), if the branch circuit breaker is used as the main
switch for a fluorescent lighting circuit, the circuit breaker should be marked “SWD.” All installations should be
in compliance with the National Electric Code and all state and local codes.
NOTE REGARDING COMPACT FLUORESCENT LAMPS: The life of some compact fluorescent lamps (CFLs) is
shortened by frequent automatic or manual switching. Check with CFL and ballast manufacturer to determine the
effects of cycling.
1.MakesurepoweristurnedOFFatthebranchcircuitbreaker.
2.Wireunitsasshowninwiringdiagramsperapplicablevoltagerequirements.
3.MountunittoWallBox.
4.TurnpowerbackONatthebranchcircuitbreakerandwait2minutesfortheunittostabilize.
5.Makenecessaryadjustments.(SeeCheckoutandAdjustmentssection)
6.InstallWallSwitchplate.
RED (10-30VDC)
BLUE (CONTROL)
BLACK (COMMON)
ORANGE (N.O.)
GRAY (COMMON)
PURPLE (N.C.)
RED
BLUE
BLACK
HOT
LOAD
BLUE
BLUE
HOT
WHITE
NEUTRAL
LINE
Wiring Diagram 1
Installation
TheONW-P-1001-SPcanbeinstalledinanystandardsinglegangbox.
ItmaybeinstalledinthesamemannerasanordinaryWallSwitch.
• WiretheONW-P-1001-SPasdescribedinthewiringsection.
• MounttheONW-P-1001-SPinthejunctionbox.
,
36
20
,
Maximum coverage area may
vary somewhat according to room
shape and the presence of obstacles.
8
,
Minor Motion, IR
Major Motion, IR
CAUTION: If a room is wired for two circuits using two separate hot leads, it is very important to connect
only one circuit per relay. Both circuits must be fed from the same phase.
P/N 9850-000350-01
Eaton’s Cooper Controls Business
203 Cooper Circle
Peachtree City, Georgia 30269
www.coopercontrol.com
Printed in Malaysia
Daylight Adjustments
ThedaylightingfeaturepreventsthelightsfromturningONwhenthe
roomisadequatelyilluminatedbynaturallight.Ifthereisenoughlightin
theroomregardlessofoccupancy,thesensorwillholdthelightsOFF.If
thereisnotenoughlightintheroom,thesensorwillallowthelightsto
turnONwhenoccupied.Thesensorwillnotallowthedaylightingfeature
toturntheloadOFFuntilthespaceisvacantorthelightlevelrisesabove
thesetpointandtheTimeDelayexpires.WhileinManualActivationMode,
ifsomeoneattemptstoturntheloadONandthereissufficientdaylight
availabletheDaylightingfeaturewillholdthelightsOFF.
1.Setthelightlevelwhentheambientlightisatthelevelwhereno
artificiallightisneeded.Ifthisfeatureisnotneeded,leavethelight
levelatmaximum(fullyCW).
2.Withtheload(s)ON,putthesensorintoTestMode.Toplaceinto
TestMode,toggleDIPSwitch8outofitscurrentposition,wait3
secondsandthenbackintoitsoriginalposition.
3.SettheLightleveltominimum(fullyCCW).
4.LetthesensorTime-outsolightsareOFF.Enterthespaceandlightsshouldremain
OFF.
5.MakesurenottoblockthesensorfromthedaylightsourceandadjustthelightlevelpotentiometerCWinsmall
increments.(Pause5secondsbetweeneachadjustment)
6.LightswillnotturnONuponoccupancyactivation,whenthe
ambientlightlevelexceedsthedaylightthresholdsetting.
Time Delay Adjustments
Peoplewhoremainverystillforlongperiodsoftimemayneed
alongerTimeDelaythanthedefaultsettingof10minutes.As
longastheself-adjustingfeatureisenabled,theswitchwill
respondtoeachpairofFalse-offswithnonormalOFFinbetween,
byalternatelymakingslightadjustmentstoeitherTimeDelay(by
2minuteincrements)orsensitivity,sothereshouldbenoneed
formanualadjustment.Ifmanualadjustmentisdesired,referto
TimeDelaysettingsinDIPSwitchlegend.
ResetsensorTimeDelaytofactorysettingsbymovingDIPSwitches1and2down.(IfDIPSwitches1and2are
alreadydown,toggleDIPSwitch1outofitscurrentposition,wait3seconds,andthenbacktoitsoriginalposition)
Tracking/HVAC
WhentheoccupancysensorturnsthelightsONorOFFeitherbydetectionoramanualpress,thelightscanbeturned
OFF
manuallybypressingthePushbutton.ThelightswillremainOFFaslongasthereismotionintheroom,oncethe
occupancysensornolongerdetectsmotionandtheTimeDelayexpires,thesensorwillrevertbacktoitsnormal
operation.
TrackingMode–Isolatedrelaywillfollowoperationofsensorinallmodes.Relaystatewillchangewhenoccupancy
sensorisactivatedand/orturnedONorOFFmanually.
HVACMode–IsolatedrelaywillonlychangestateinAuto/ManualONandAutoOFFmodes.Thestatewillnot
change,iftheoccupancysensoristurnedOFFmanually.TherelaywillchangestateoncetheTimeDelayexpires.
Override
Theoverridesettingallowsthesensortooperateasaserviceswitchintheunlikelyeventoffailure.
1.MoveDIPSwitch8up.
2.ThePushbuttoncanbeusedtomanuallyturnlightsONorOFF.
Warranties and Limitation of Liability
DIP Switch Settings Troubleshooting
Pleaserefertowww.coopercontrol.comundertheLegalsectionforourtermsandconditions.
Checkout and Adjustment
5 Minutes
Auto*
*Self-Adjusts to
10 min. user mode
Time Delay
DIP Switch
Activation
PIR Sensitivity Override
Relay 1
Isolated Relay
EcoMeter
Walk-Through Mode
Default =
30 Minutes
15 Minutes
12
DIP Switch Legend
6
Disable
Enable
4
3
Auto
Manual
5
Full
50%
8
7
Enable
Disable
Disable
Enable
12345678
Tracking
HVAC
AdjustmentsshouldbemadewiththeHVACsystemonsothattheinstallerwillbeabletodetecttheeffectof
airflowontheoperationoftheONW-P-1001-SP.Useonlyinsulatedtoolstomakeadjustments.
Immediatelyafterapplyingpowertothe
lightingcircuit,waitapproximatelytwominutes
fortheswitchtopowerupandstabilize.
Self-Adjust
Sensorisshippedinself-adjustmode.This
appliestoTimeDelayandPIRsensitivity.In
preparationfortheInstallerTest,theTime
Delayissetto15seconds,afterthesensoris
installed,poweredONandhasstabilized,the
unitwillTime-out15secondsafterthelast
motiondetected.Coverageandsensitivity
canbeconfirmedbywatchingtheRed(PIR)
indicatorLEDonthefrontofthesensor,while
movingaroundtheroom.
1.WalkaroundtheroomandmonitorLEDs.
2.Standindifferentpartsoftheroom
andwaveyourhands.LEDshouldonly
turnONforonesecondwitheachmotion.(IfLEDdoesnotturnON,gotoInstallerAdjustments–Sensitivity
AdjustmentSection)
3.Standstillthreetofourfeetawayfromsensorforfiveseconds.LEDshouldnotturnON.(IfLEDturnsON,goto
InstallerAdjustments–SensitivityAdjustmentssection)
4
. Walkoutsidetheroomandwait15secondsforthelightstoturnOFF.(IflightsdonotturnOFFgotoInstaller
AdjustmentsSection)
5.Re-entertheroomtoactivatesensor.(IflightsdonotturnONgotoTroubleshootingSection)
6.Atthispointyoucanexittheroomandletthesensortime-out.WhenthesensorTimes-outandisOFFforfive
minutes,theunitwillgotoa10minuteTimeDelayusermodesetting.
Note:
ToplaceintoTestMode,toggleDIPSwitch8outofitscurrentposition,wait3seconds,andthenbackintoitsoriginalposition.
ON/OFF Button
PIR Lens
DIP Switches
Daylight
Sensor Level
Adjustment
Red (PIR)
Detection LEDs
12345678
DIP Switches
1 & 2
Issue Possible Causes Suggestions
Lights
Will Not
Turn ON
automatically
SensorisinManualONmode
PressPushbutton.IfAutoMode
isdesiredchangeActivationModetoAuto.
SensorwasturnedOFFmanually.IftheSensor
wasturnedOFFmanuallybeforetheTimeDelay
expired,lightswillremainOFFfortheremainder
oftheTimeDelay.
CheckEcoMeterLED.IfLEDisONthisis
anindicationthatthelightswereturnedOFFmanually.
PressthePushbuttontoturnthelightsbackON.
DaylightFeatureEnabled
IfalllightsarerequiredtoturnON
adjustdaylightpotentiometer.
Powerinterruption Checkincomingvoltageand/orwiring.
Lights
Will Not
Turn ON
manually
DaylightFeatureEnabled
IfalllightsarerequiredtoturnON
adjustdaylightpotentiometer.
Powerinterruption Checkincomingvoltageand/orwiring.
If lights will still not turn ON, set sensor to override mode and call Technical Services at 1-800-553-3879
Lights
Will Not
Turn OFF
automatically
Override MakesuresensorisnotinOverrideMode(DIPSwitch8up).
Self-Adjust
IfsensorisinSelf-AdjustMode,itmaybepossibleforthe
unittohaveincreasedtheTimeDelaytoa30minutedelay.
IfthelightsdonotturnOFFafter30minutesfollownextstep.
30MinuteDelay
MaximumTimeDelayis30Minutes.CheckDIPSwitches
toverifyDIPSwitchsettings.IflightsdonotturnOFFatthe
set
TimeDelay,checknextstep.
PIRactivatedbyheatsourceotherthanoccupant MoveDIPSwitch5up.
Lights
Will Not
Turn OFF
manually
CallTechnicalServices
If lights will still not turn OFF, call Technical Services at 1-800-553-3879
PIR Sensitivity
1.Standindifferentareasoftheroomandwaveyourhands.
2 IftheRedLEDdoesnotturnON,checkforanyobstructions.
3 Standstillthreetofourfeetawayfromsensorforfiveseconds.LEDshouldnotturnON.
4 IfRedLEDturnsONwithoutmotionorisconstantlyONadjustPIRsensitivityto50%bymovingDIPSwitch5up.
Field-of-view outside the space
1. AdjustPIRsensitivityto50%bymovingDIPSwitch5up.
2. Usenon-reflectivetapestripstocovertheportionsofthesensorlensthatviewoutsidethespace.
Installer Adjustments
  • Page 1 1
  • Page 2 2

Greengate NeoSwitch - PIR Low Voltage Wall Switch Sensor Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI