SloanLED SYM-B Installation guide

Type
Installation guide
PAGE 1 OF 1
Symphony Bollard
Installation Guide for Symphony Bollard
SloanLED Headquarters
5725 Olivas Park Drive, Ventura, CA, USA
888.747.4LED (888.747.4533) • info@SloanLED.com
SloanLED.com
SloanLED Europe b.v.
Argonstraat 110, 2718 SN Zoetermeer, NL
+31 88 12 44 900 • Europe@SloanLED.com
P/N 403132 Rev A 2022-11-02
Customer service and technical support
WARNING – RISK OF FIRE, EXPLOSION, AND ELECTRICAL SHOCK
This product shall be installed, inspected, and maintained by a
qualied electrician only in accordance with NEC (National Electric Code)
and all local codes.
Turn off electrical power before inspection, installation, or removal.
Use only UL (or other NTRL) approved wire for input/output connections.
Minimum size 18 AWG for continuous runs.
Ensure LEDs and drivers are cool to touch when performing maintenance
and supply voltage is same as rated voltage of luminaire.
Do not install in a hazardous atmosphere, except where ambient temperature
does not exceed rated operating temperature of xture.
Keep tightly closed when in operation.
Grounding instructions
Grounding and bonding of overall system
shall be done in accordance with NEC
Article 600 and local codes.
Prepare electrical wiring
Electrical requirements
LED driver must be supplied with
120 to 277 V, 50/60 Hz and connected to
an individual, properly grounded branch
circuit protected by a 20 Ampere circuit
breaker. Use min. 75° C supply.
4.
Once secured, attach main connections to terminal block on top of base.
Be sure to connect cables as seen in Wiring Diagram above.
Once all
connections have been made, replace bollard body onto base and
secure with three (3) 8-32UNC Phillips-head screws.
Wiring Diagram
LINE BLACK
FIXTURE
NEUTRAL WHITE DIM+
Purple
(If applicable)
GROUND GREEN DIM-
Gray
1. Tools required: Wire strippers, Phillips-head
screwdriver, 9/16" combination wrench.
2. Before you begin: Ensure power is OFF.
Unpack xture and ensure there are no
damaged parts. Use supplied cardboard
template to set anchor bolts in concrete,
ensuring base of concrete is elevated from
surrounding area to keep bollard from
standing in water. Allow concrete to
properly set.
Installation
3. Remove three (3) 8-32UNC Phillips-
head screws from bollard to remove base
assembly. Be sure to disconnect orange
disconnect from cable on terminal block.
Once base has been removed, it can be
installed onto anchor bolts previously installed
in Step 2. Bolt down base using included nuts
and washers.
Terminal
block
Base
  • Page 1 1