Focal Point Twelve LED FTWLW Installation guide

  • Hello! I've reviewed the specification document for the Focal Point FTWLW LED wall mount. It outlines the installation procedures, dimensions, and electrical connection details. I'm ready to assist you with any questions you might have about the product or the installation process.
  • What are the weights of the luminaires?
    Who should install the luminaires?
    What should I do before installation or servicing?
IS0552 Rev. C 2019 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com 1 of 3
INDIVIDUAL/
START OF RUN
20.00”
INTERMEDIATE END OF RUN
twelveled wall mount
FTWLW
focal point
j-box & wall fasteners
provided by others
see step 2 for j-box mounting information
run length
wall rails required
individual/start of run intermediate(s)end of run
4' 1
8' 2
12' 2 1
16' 2 2
20' 2 1 2
24' 2 2 2
28' 2 4 1
32' 2 4 2
mounting rail
& hardware
Luminaires must be installed by a qualied electrician (check with local and national codes for proper installation).
To prevent electrical shock, disconnect electrical supply before installation or servicing.
1
key
power off
power on
level
attention
luminaire weights
4' - 12lbs
8' - 23lbs
u-indivdual
s-start of run
i-intermediate
e-end of run
.39
23.33
.90
Ø .688
23.33
.90
Ø .688
46.50
23.33
23.33
.90
Ø .688
4’ housing
8’ housing
rail mounts .39” above
the bottom of luminaire
DIMENSIONS SHOWN ARE FROM THE ROOM SIDE OBSERVING THE WALL
IS0552 Rev. C 2019 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com 2 of 3
9a
42 113
5
9b
116
Luminaires must be installed by a qualied electrician (check with local and national codes for proper installation).
To prevent electrical shock, disconnect electrical supply before installation or servicing.
individual/start of run only
break off left end of rail
or
individual/start of run only
individual/start of run only install remaining rails
temporarily secure fixture
do not tighten completely
make electrical connections
individual housings skip to step 15
x2
x2
78
10
remove beam smoothing diffuser
11
make electrical connections
AVOID ALL CONTACT WITH
LED SURFACE, LEDs ARE
EASILY DAMAGED!
tilt
tilt adjustment screw
locking screw
1115
adjust run as necessary, then secure
with locking screws on each housing.
repeat steps 10-14 until
run is complete
13
temporarily secure fixture
do not tighten completely
16
2
driver service
14
12
install beam smoothing diffuser
1
remove beam smoothing diffuser
3
Contractor is responsible for adequately reinforcing walls and/or ceilings to support luminaire weight. Focal Point, LLC accepts no responsibility for inadequately reinforced walls
and/or ceilings. The information contained in this drawing is the sole property of Focal Point, LLC. Any reproduction in part or whole without the written permission of Focal Point, LLC
is prohibited.
IS0552 Rev. C 2019 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com 3 of 3
AVOID ALL CONTACT WITH LED SURFACE,
LEDs ARE EASILY DAMAGED!
/