5019 318
33110
AKR 631 - AKR 948 - AKR 952
Preliminary information for installing the hood:
Disconnect the power supply at the domestic main switch before carrying out electrical connections.
1.
Place the extraction unit on a flat surface and fit the bottom part of the hood on it
(remove the grease filter/s).
2.
Carry out the electrical connections between the two parts.
3.
Fix the hood to the extraction unit with 10 screws.
4.
Using a pencil, draw the centre line on the wall up to the ceiling to facilitate installation operations.
5.
Attach the hole diagram to the wall: the vertical centre line printed on the hole diagram must match the
centre line drawn on the wall, and the lower edge of the hole diagram must match the lower edge of the
hood: remember that with installation completed the bottom of the hood must be at least 50 cm above the
cooktop in case of electric cookers and 75 cm in case of gas or mixed cookers.
6.
Place the support bracket on the hole diagram so that it matches the dashed rectangle, mark the two
external holes and drill, remove the hole diagram, insert 2 wall plugs and fix the hood support bracket with
two 5x45 mm screws.
7.
Hook the hood to the bracket.
8.
Adjust the distance between the hood and the wall.
9.
Adjust the hood horizontally.
10.
From the inside of the hood, mark the two holes for fixing the hood.
11.
Remove the hood from the bracket.
12.
Drill on the marks (Ø 8 mm - see step 10).
13.
Insert 2 wall plugs.
14.
Fit the flue support bracket
G
to the wall and against the ceiling, use the support bracket as hole diagram
(the small slot on the support must match the line drawn on the wall - step 4) and mark 2 holes with the
pencil, drill the holes (Ø 8 mm), and finally insert 2 plugs.
15.
Fix the flue support bracket to the wall with two 5x45 mm screws.
16.
Hook the hood to the bottom bracket.
17.
Fix the hood with two 5x45 mm screws (ABSOLUTELY NECESSARY).
18.
Connect an exhaust pipe (pipe and clamps are not supplied and must be bought separately) to the collar
B
located above the extraction motor unit.
For extractor operation, connect the other end of the exhaust pipe to the home discharge device. For filter
operation, fix the deflector
F
to the flue support bracket
G
(model
AKR 948-631
with 4 screws - model
AKR 952
with 2 screws) and connect the other end of the exhaust pipe to the deflector collar
F
(if the
collar is not already fitted it should be inserted on the deflector and secured with 1 screw). Once the steam
and fumes have been filtered by the carbon filter (not provided, to be ordered separately) they are
conveyed back to the kitchen through grid
H
.
19.
Carry out the electrical connection.
20.
Apply the flues and fix them with 2 screws (
20a
) to the flue support
G
(
20b
).
21.
Slide the bottom section of the flue in the special seat above the hood to completely cover the extraction
unit.
22.
(model
AKR 952
only): fix the bottom section of the flue to the hood with two 3x9 screws.
Refit the grease filter/s and check for correct hood operation.
INSTALLATION - ASSEMBLY INSTRUCTIONS
D F NL E
GB
P I GR