OZCO 56649 Operating instructions

Category
Wall & ceiling mounts accessories
Type
Operating instructions

This manual is also suitable for

V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
Installation Instructions,
3/4" OWT Thru-Bolt Timber Fasteners
1
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
Optimum Size Selection Table
width range Timber Bolt
1.5-4" 56673
4.25-6" 56649
6.25-8" 56650
8.25-10" 56651
10.25-12" 56652
Timber Bolts may be
installed as a standalone
fastener or with many
OZCO connector options
Timber Bolts are usable .25" past
documented range, however use
table for best selection
Timber Bolts can accomodate 2
#56680 washers in MAX range
Recommended MAX tightening
torque: 10in/lbs
Width range tolerance: +.25"/-.0
Timber Bolts with 2 connectors:
custom widths are possible when
eliminating 1 connector & stud
for lighter duty applicatons,
see 1/2" OWT Thru-Bolt Timber Fasteners
How does it work?
power
optional Washer (#56680)
excess threads are concealed
for additional holding
carriage bolts
5 width ranges to choose from
no exposed dangerous edges
compare to
tightens from the inside
stud
connectors
V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
Applications
14
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
Applications
14
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
Applications
14
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
Applications
14
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
OZCO
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
7
OWT Timber Bolt 10-12"
56652
[254-304] 10-12"
OWT Timber Bolt 1.5-4"
56673
[38-101] 1.5-4"
15.24
.60
37.47
1.5
26.16
1.0
OWT Timber Bolt 8-10"
56651
[203-254] 8-10"
.375
7/16"
clearance
hole
19.05
.75
15.88
.63
3/4"
clearance
hole
OWT Timber Bolt 6-8"
56650
[152-203] 6-8"
OWT Timber Bolt 4-6"
56649
[101-152] 4-6"
V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
Suggested Tools
(others may be required)
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
8
V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
step 1
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
9
Installation
Drill 3/4" thru hole1.
Remove HCN cap, HCN & Timber Bolt Screw2.
Adjust width of Timber Bolt by turning connectors3.
Insert into thru hole4.
Reinstall cap, HCN & Timber Bolt Screw5.
current and subsequent pages will illustrate these steps
mark locations
plate temporarily installed
for installations without
post to beam connector,
proceed to next step
V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
step 2
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
10
plate from
step 1
removed
secure as desired
beam can be nailed/screwed in
place(instead of clamped) in area
covered by plate shown in step 1
pencil marks
V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
step 3
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
11
see next page before proceeding
3/4
drill through
beam & post"
installation example
without post to beam
connector
V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
2 Beam Installation shown
Drill holes as level as possible to ensure
straight path to align with hole from
opposite side
step 3 supplement
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
12
Prevent Unsightly Breakouts
drill most of the way from one
side DO NOT breakout then
repeat from opposite side
holes
aligned
SCALE 1 : 6
SECTION B-B
note
B
B
V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
step 4
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
13
disassemble and
adjust as necessary
before installation
repeat on
opposite side
installation example
without post to beam
connector
Tool Required
3/8" Driver
(Timber Bolt)
see torque spec on page 1
V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/21/2016 . This information is updated periodically
and should not be relied upon after 2 years from 4/21/2016 . Please visit OZCOBP.com to get current information.
step 5
Installation Instructions, .75 OWT Thru-Bolt
Timber Fasteners
14
cutaway view
Tool Required
3/8" Driver
Cap (finger tight)
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14

OZCO 56649 Operating instructions

Category
Wall & ceiling mounts accessories
Type
Operating instructions
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI