H3C S12500 Series Quick Installation Manual

Type
Quick Installation Manual

H3C S12500 Series, a high-performance routing switch, offers scalable, flexible, and reliable solutions for data centers, carriers, and enterprise networks. With its advanced features like high-density 100GE/40GE/10GE/GE interfaces, resilient architecture, and comprehensive Layer 2/Layer 3 features, it enables efficient network connectivity, flexible service deployment, and robust security.

H3C S12500 Series, a high-performance routing switch, offers scalable, flexible, and reliable solutions for data centers, carriers, and enterprise networks. With its advanced features like high-density 100GE/40GE/10GE/GE interfaces, resilient architecture, and comprehensive Layer 2/Layer 3 features, it enables efficient network connectivity, flexible service deployment, and robust security.

H3C S12500 Routing Switch Series
Quick Installation Guide
Hangzhou H3C Technologies Co., Ltd.
http://www.h3c.com
Document version:
A
PW201-20131030
Copyright © 2013, Hangzhou H3C Technologies Co., Ltd. and its licensors
All rights reserved
No part of this manual may be reproduced or transmitted in any form or by any means without prior
written consent of Hangzhou H3C Technologies Co., Ltd.
Trademarks
H3C, , H3CS, H3CIE, H3CNE, Aolynk, , H
3
Care, , IRF, NetPilot, Netflow,
SecEngine, SecPath, SecCenter, SecBlade, Comware, ITCMM and HUASAN are trademarks of
Hangzhou H3C Technologies Co., Ltd.
All other trademarks that may be mentioned in this manual are the property of their respective owners
Notice
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute the warranty of any kind, express or implied.
Environmental protection
This product has been designed to comply with the environmental protection requirements. The storage,
use, and disposal of this product must meet the applicable national laws and regulations.
i
Contents
Quick installation guide ··············································································································································· 1
Preparing for installation ·················································································································································· 1
ESD prevention ························································································································································· 1
Examining the installation site ································································································································· 2
Installation tools and accessories ··························································································································· 2
Installing the switch ··························································································································································· 2
Removing the power frame mounting bracket ······································································································ 3
Installing the switch in a rack ·································································································································· 3
Grounding the switch ··············································································································································· 5
Installing the power modules ··································································································································· 5
Installing a fan tray ·················································································································································· 6
Installing a card ························································································································································ 7
Connecting power cords ······································································································································ 10
Verifying the installation ······································································································································· 12
Logging in to the switch ················································································································································· 13
Connecting the console cable ······························································································································ 13
Powering on the switch ········································································································································· 14
Obtaining documentation ············································································································································· 15
Index ··········································································································································································· 16
1
Quick installation guide
This quick installation guide provides basic instructions for installing an S12500 routing switch. For more
detailed installation procedures, see H3C S12500 Routing Switch Series Installation Guide.
Preparing for installation
ESD prevention
To prevent the electronic components from being damaged by the electrostatic discharge (ESD), always
wear an ESD wrist strap when you touch the switch, cards, or ICs, and make sure the wrist strap is
correctly grounded.
Figure 1 Attaching an ESD wrist strap (on an S12508)
2
Examining the installation site
The H3C S12500 Routing Switch Series can only be used indoors. To make sure the switch operates
correctly and to prolong its service lifetime, the installation site must meet the load-bearing, temperature,
humidity, cleanness, EMI, grounding, power module, and space requirements. For more information, see
H3C S12500 Routing Switch Series Installation Guide:
Installation tools and accessories
Installing the switch
Figure 2 Installation flow
Phillips screwdriver
(user-supplied)
Needle-nose pliers
(user-supplied)
ESD-preventive
wrist strap (required)
Diagonal pliers
(user-supplied)
Marker
(user-supplied)
Grounding cable
(required)
M4 screw
(required)
M6 screw
(required)
Cage nut
(required)
Cable tie
(required)
Flat-blade screwdriver
(user-supplied)
3
Removing the power frame mounting bracket
Before you mount the switch in a rack, remove the power frame mounting bracket with a Phillips
screwdriver.
Figure 3 Removing the power frame mounting bracket
Installing the switch in a rack
Check before installation
Before installation, make sure the bottom edge of the slide rails or rack shelf aligns with the middle of the
narrower metal area between holes.
Figure 4 Installing the slide rails
(1) Middle of the narrower metal area between holes
(2) 1 RU
Installing cage nuts
1. Align the mounting bracket with the left rack post, making sure the bottom edge and the slide rail
are level. Mark the positions of the cage nuts on the rack post according to the installation holes
4
on the mounting bracket (each installation hole on the mounting bracket corresponds to one cage
nut).
2. Insert one edge of a cage nut into the hole.
3. Compress the other edge of the cage nut to push the cage nut fully into the hole.
4. Repeat steps 2 and 3 to install cage nuts to all the marked positions on the right rack post.
Figure 5 Installing the cage nuts
Mounting the switch in the rack
1. Use several people to place the switch on the slide rails or rack shelf and slide the switch into the
rack until the mounting brackets on the switch touch the front rack posts.
2. Fix the mounting brackets to the cage nuts on the rack posts with mounting screws.
Figure 6 Installing the switch in a standard 19-inch rack
5
Grounding the switch
1. Remove the two grounding screws from the switch chassis.
2. Use the grounding screws to attach one end of the grounding cable to the chassis.
3. Connect the other end of the grounding cable to the grounding strip of the rack in the same way.
Figure 7 Connecting the grounding cable
Installing the power modules
AC and DC power modules are installed in the same way.
To install a power module:
1. Rotate the power frame panel up with both hands.
2. Pull the clip at the bottom left corner of the power module to the left to open the power module
cover.
3. Insert the power module slowly into the slot until it is firmly seated in the slot.
4. Close the power module cover, press the clip, and push the power module cover to lock the power
module in position.
6
Figure 8 Installing a power module (on an S12508)
5. Install other power modules by repeating steps 1 to 4, and close the power frame panel.
Figure 9 Closing the power frame panel (on an S12508)
Installing a fan tray
Each of the S12508 and the S12518 has two fan trays. They are installed in the same way.
To install a fan tray:
1. Remove the blank panel from the slot to be used.
Figure 10 Removing the fan tray blank panel (from an S12508)
2. Lift the fan tray and push it into the slot until it is firmly seated in the slot.
7
3. Fasten the captive screws on the front panel of the fan tray.
Figure 11 Installing a fan tray (for the S12508)
Installing a card
Slot requirements
Install MPUs, LPUs, and switching fabric modules into appropriate slots as shown in Figure 12.
NOTE:
On an S12508 or S12518 switch, install at least one MPU, one interface card, and seven switching fabric
modules.
8
Figure 12 Slot requirements (for the S12508)
(1) MPU slots (with red ed
g
es) (2) LPU
slots (with blue
ed
g
es)
(3) Switchin
g
fabric module slots (with
g
rey
ed
g
es)
Installing a card
This section describes how to install an MPU as an example.
To install an MPU:
1. Remove the protective cover before installing an MPU:
{ Put on an ESD wrist strap and then loosen the captive screws that fix the MPU to the protective
cover with a Phillips screwdriver.
{ Pull the MPU out of the protective cover gently, as shown in Figure 13.
9
Figure 13 Removing the protective cover
NOTE:
Protective cover appearance varies with models. You can remove a protective cover of any model by
using the same way illustrated in this document.
2. Move the ejector levers on the front panel of the MPU outwards, hold up the MPU by one hand
without touching any electronic components on the MPU, and hold the front panel by the other
hand to push the MPU into the slot along the slide rails slowly.
3. Push the ejector levers inward to ensure close contact between the MPU and the backplane.
4. Position the screws into the holes and fasten them with a screwdriver to fix the MPU.
10
Figure 14 Installing a card (for the S12508)
Connecting power cords
Make sure the power switch is in the OFF position before you connect the power cords.
Make sure the number of power cords is the same as the number of power modules. This section
describes power cord connection when all the power modules are installed on the switch.
Connecting an AC power cord
CAUTION:
Typically 10 A busbars are available in the equipment room but the AC power supply system requires a
16 A power cord (AC), so you need to use a 16 A busbar, and make sure the AC power supply system can
provide enough power. For 16 A AC power cords used in different countries or regions, see
H3C S1250
0
Routing Switch Series Installation Guide
.
To connect AC power cords:
1. Attach the power cable bracket to the power frame, attach the spring washers, flat washers, and
fasten the screws.
11
Figure 15 Installing the power cable bracket
2. Insert the AC power cord into the power receptacle.
3. Use a cable tie to secure the power cord to the tie-wrap tab on the power cable bracket.
4. Repeat steps 2 and 3 to secure other AC power cords to the power cable bracket.
5. Connect the other end of the AC power cord to the power source.
Figure 16 Connecting the AC power cord
Connecting a DC power cord
ARNING!
A
plastic protection cover is installed in front of the
g
roundin
g
strip to protect operators from bein
g
shocked. Remove the protection cover before connectin
g
power cords and then install the protection cover
in time.
To connect a DC power cord:
1. Connect one end of the blue DC power cord to the negative terminal (–) on the power strip, and
fasten the screw with a Phillips screwdriver.
12
2. Connect one end of the black DC power cord to the RTN(+) terminal on the power strip, and fasten
the screw.
Figure 17 Connecting the DC power cord to the grounding strip
3. Connect the other end of the DC power cord to the power source:
{ Connect the other end of the blue DC power cord to the –48 VDC power source.
{ Connect the other end of the black DC power cord to the RTN(+) terminal that provides power
to the switch.
4. Put the protection cover on the wiring terminals.
Figure 18 Installing the protection cover
Verifying the installation
ARNING!
Each of the S12508 has one power switch, and an S12518 has two power switches. Make sure you have
turned off the power before checking the installation to avoid bodily injury and switch damage.
After the installation is completed, verify the installation against the following list. Make sure all check
results are positive.
13
Table 1 Installation checklist
Item
Result
Remarks
Yes
No
The grounding cable is correctly grounded.
Fan trays are correctly installed and make close contact
with the backplane.
Power modules are correctly installed and have close
contact with the frames.
The power switch is off (the power switch is at the OFF
position).
Power cords are correctly connected.
MPUs are correctly installed and have close contact with
the backplane.
LPUs are correctly installed and have close contact with
the backplane.
Switching fabric modules are correctly installed and have
close contact with the backplane.
Logging in to the switch
IMPORTANT:
You can only log in through the console port for your first login to the switch.
Connecting the console cable
To connect the console cable through the console port:
1. Connect the DB-9 connector of the console cable to the serial port of a PC or terminal.
2. Connect the RJ-45 connector of the console cable to the console port of the MPU of the switch.
To connect the console cable through the USB console port:
1. Connect the USB-A connector of the console cable to the USB port on a PC or terminal.
2. Connect the mini-USB A/B connector of the console cable to the USB console port on the MPU of
the switch.
14
Figure 19 Connecting the console cable
Powering on the switch
Verify that the power cord is connected to the power source, power on the switch, and verify that the LEDs
on the switch are normal.
Table 2 LED description when the switch is operating correctly
Module LED Status
MPU
SFC (red/green) Flashing green
LC (red/green) Flashing green
FAN (red/green) Flashing green
PWR (red/green) Flashing green
RUN (red/green) Flashing green
Ethernet interface card RUN (red/green) Flashing green
Switching fabric module RUN (red/green) Flashing green
15
Module LED Status
Power monitoring
module
RUN (green) Steady on
ALM (red) Off
Power module
Power input (green) Steady on
Power output (green) Steady on
Fan tray
RUN (green) Flashing
ALM (red) Off
NOTE:
For more information about the LEDs, see
H3C S12500 Routing Switch Series Installation Guide
.
Obtaining documentation
Take the following steps to get related documents from the H3C website at www.h3c.com.
1. Go to http://www.h3c.com/portal/Technical_Documents.
2. Choose the desired product category and model.
16
Index
C E G I P R V
C
Connecting power cords,10
C
onnecting the console cable,13
E
ES
D prevention,1
Ex
amining the installation site,2
G
Gr
ounding the switch,5
I
Installati
on tools and accessories,2
Installing a c
ard,7
Installing a f
an tray,6
Installing the
power modules,5
Inst
alling the switch in a rack,3
P
Po
wering on the switch,14
R
R
emoving the power frame mounting bracket,3
V
V
erifying the installation,12
Copyright © 2013, Hangzhou H3C Technologies Co., Ltd.
For more information about the product and installation procedures, log in to www.h3c.com
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19

H3C S12500 Series Quick Installation Manual

Type
Quick Installation Manual

H3C S12500 Series, a high-performance routing switch, offers scalable, flexible, and reliable solutions for data centers, carriers, and enterprise networks. With its advanced features like high-density 100GE/40GE/10GE/GE interfaces, resilient architecture, and comprehensive Layer 2/Layer 3 features, it enables efficient network connectivity, flexible service deployment, and robust security.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI