Maipu SM6600-08-MF Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Maipu SM6600-08-MF Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
MyPower
MyPower
MyPower
MyPower
S6600
S6600
S6600
S6600
Series
Series
Series
Series
Routing
Routing
Routing
Routing Switch
Switch
Switch
Switch
Installation
Installation
Installation
Installation
Manual
Manual
Manual
Manual
V
1
.0
Maipu Communication Technology Co., Ltd
No. 16, Jiuxing Avenue
Hi-tech Park
Chengdu, Sichuan Province
People ’ s Republic of China - 610041
Tel:
Tel:
Tel:
Tel: (86) 28-85148850, 85148041
Fax:
Fax:
Fax:
Fax: (86) 28-85148948, 85148139
URL:
URL:
URL:
URL: http: // www.maipu.com
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
ii
copyright ©2015 Maipu All rights reserved.
Copyright
Copyright
Copyright
Copyright
Copyright © 20 15 , Maipu Communication Technology Co., Ltd. All Rights Reserved.
No part of this manual may be reproduced or transmitted in any form or by any
means without prior written consent of Maipu Communication Technology Co., Ltd.
and are trademarks of Maipu Communication Technology Co., Ltd.
All other trademarks that may be mentioned in this manual are the property of
their respective owners.
The information in this document is subject to change without notice. In no event
shall Maipu be liable for any direct, indirect, incidental, special, exemplary, or
consequential damages (including, but not limited to, procurement of substitute
goods or services; loss of use, data, or profits; or business interruption) however
caused and on any theory of liability, whether in contract, strict liability, or tort
(including negligence or otherwise) arising in any way out of the use of this manual
or the related content on the website, even if advised of the possibility of such
damage.
Security
Security
Security
Security Statement
Statement
Statement
Statement
Important! Before powering on and starting the product, please read the security
and compatibility information of the product.
Environmental
Environmental
Environmental
Environmental protection
protection
protection
protection
This product has been designed to comply with the environmental protection
requirements. The storage, use, and disposal of this product must meet the
applicable national laws and regulations.
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
copyright ©2015 Maipu All rights reserved.
iii
Preface
Preface
Preface
Preface
Manual
Manual
Manual
Manual Introduction
Introduction
Introduction
Introduction
This manual first describes the appearance, hardware, cards, and power modules
of MyPower S6600 series high-end routing switch; secondly, describes the
installation preparations and installation methods of the device; at last, describes
the basic using methods and daily maintenance of the device from the aspects of
powering on and running the device, troubleshooting and device maintenance.
Product
Product
Product
Product Versions
Versions
Versions
Versions
The corresponding product versions of the manual are as follows:
Product
Product
Product
Product Name
Name
Name
Name Product
Product
Product
Product Version
Version
Version
Version
MyPower S6600 series high-end
routing switch
SM6600-04-MF (V2)
SM6600-08-MF (V2)
Audience
Audience
Audience
Audience
This documentation is intended for:
Hardware installation engineers
Commissioning engineers
Field maintenance engineers
System maintenance engineers
Conventions
Conventions
Conventions
Conventions
Conventions of screen output format:
Format
Format
Format
Format Description
Description
Description
Description
Screen
print
Represents the output information of the screen
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
iv
copyright ©2015 Maipu All rights reserved.
Format
Format
Format
Format Description
Description
Description
Description
Keywords
of Screen
print
The red part represents the key information in the screen output
Symbol conventions:
Format
Format
Format
Format Description
Description
Description
Description
An alert that contains additional or supplementary information.
An alert that calls attention to important information that if not
understood or followed can result in data loss, data corruption, or
damage to hardware or software.
An alert that calls attention to important information that if not
understood or followed can result in personal injury or device
damage.
Command conventions:
Convention
Convention
Convention
Convention Description
Description
Description
Description
Boldface
Bold text represents commands and keywords that you enter literally as
shown.
Italic Italic text represents arguments that you replace with actual values.
[ ]
Square brackets enclose syntax choices (keywords or arguments) that are
optional.
{ x | y | ... }
Braces enclose a set of required syntax choices separated by vertical bars,
from which you select one.
[ x | y | ... ]
Square brackets enclose a set of optional syntax choices separated by
vertical bars, from which you select one or none.
{ x | y | ... }
*
Asterisk marked braces enclose a set of required syntax choices separated
by vertical bars, from which you select at least one.
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
copyright ©2015 Maipu All rights reserved.
v
&<1-n>
The argument or keyword and argument combination before the
ampersand (&) sign can be entered 1 to n times.
# A line that starts with a pound (#) sign is comments.
The icons used in the manual and the meanings:
Icon
Icon
Icon
Icon Description
Description
Description
Description
Represents a generic switch
Supporting
Supporting
Supporting
Supporting Manuals
Manuals
Manuals
Manuals of
of
of
of Product
Product
Product
Product
The supporting manuals of the product:
Manual
Manual
Manual
Manual name
name
name
name Overview
Overview
Overview
Overview
MyPower S6600
Series High-end
Routing Switch
Installation
Manual
Describes the device hardware specifications and installation methods,
guiding you to install the device
MyPower S6600
Series High-end
Routing Switch
Configuration
Manual
Describes the configuration methods and configuration steps of the
device software functions, providing typical cases for reference
Obtaining
Obtaining
Obtaining
Obtaining Documentation
Documentation
Documentation
Documentation
You can access the most up-to-date Maipu product documentation on the World
Wide Web at www.maipu.com .
Technical
Technical
Technical
Technical Support
Support
Support
Support
Technical supporting hotline: 400-886-8669
Fax: (+8628)85148948
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
vi
copyright ©2015 Maipu All rights reserved.
Documentation
Documentation
Documentation
Documentation Feedback
Feedback
Feedback
Feedback
You can feed back your opinions and suggestions by:
Email: tech [email protected]
Technical hotline: 400-886-8669
We appreciate your comments.
Revision
Revision
Revision
Revision Records
Records
Records
Records
Version
Version
Version
Version Revision
Revision
Revision
Revision Date
Date
Date
Date Revised
Revised
Revised
Revised Content
Content
Content
Content
V1.0 2015-01-08 First formal release
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
copyright ©2015 Maipu All rights reserved.
vii
Contents
Contents
Contents
Contents
PREFACE
PREFACE
PREFACE
PREFACE ·······················································································································································
·······················································································································································
·······················································································································································
······················································································································································· III
III
III
III
CONTENTS
CONTENTS
CONTENTS
CONTENTS ··················································································································································
··················································································································································
··················································································································································
·················································································································································· VII
VII
VII
VII
1
1
1
1
DEVICE
DEVICE
DEVICE
DEVICE INTRODUCTION
INTRODUCTION
INTRODUCTION
INTRODUCTION ··················································································································
··················································································································
··················································································································
·················································································································· 1-1
1-1
1-1
1-1
1.1
1.1
1.1
1.1 D
D
D
DEVICE
EVICE
EVICE
EVICE A
A
A
APPEARANCE
PPEARANCE
PPEARANCE
PPEARANCE AND
AND
AND
AND H
H
H
HARDW ARE
ARDW ARE
ARDW ARE
ARDW ARE ·······························································································
·······························································································
·······························································································
······························································································· 1-1
1-1
1-1
1-1
1.1.1 SM6600-04-MF ··································································································································· 1-2
1.1.2 SM6600-08-MF ··································································································································· 1-3
1.2
1.2
1.2
1.2 MPU
MPU
MPU
MPU C
C
C
CARD
ARD
ARD
ARD ············································································································································
············································································································································
············································································································································
············································································································································ 1-5
1-5
1-5
1-5
1.3
1.3
1.3
1.3 SFU
SFU
SFU
SFU C
C
C
CARD
ARD
ARD
ARD ··············································································································································
··············································································································································
··············································································································································
·············································································································································· 1-6
1-6
1-6
1-6
1.4
1.4
1.4
1.4 LPU
LPU
LPU
LPU C
C
C
CARD
ARD
ARD
ARD ·············································································································································
·············································································································································
·············································································································································
············································································································································· 1-7
1-7
1-7
1-7
1.5
1.5
1.5
1.5 SIU
SIU
SIU
SIU C
C
C
CARD
ARD
ARD
ARD ··············································································································································
··············································································································································
··············································································································································
·············································································································································· 1-8
1-8
1-8
1-8
1.6
1.6
1.6
1.6 P
P
P
POWER
OWER
OWER
OWER M
M
M
MODULE
ODULE
ODULE
ODULE ···································································································································
···································································································································
···································································································································
··································································································································· 1-8
1-8
1-8
1-8
1.7
1.7
1.7
1.7
F
F
F
F
AN
AN
AN
AN M
M
M
MODULE
ODULE
ODULE
ODULE AND
AND
AND
AND D
D
D
DEVICE
EVICE
EVICE
EVICE A
A
A
AIR
IR
IR
IR V
V
V
VENT
ENT
ENT
ENT ································································································
································································································
································································································
································································································ 1-10
1-10
1-10
1-10
1.7.1 FAN-7A-01
F
AN MODULE ················································································································· 1-10
1.7.2 FAN-13A-01
F
AN MODULE ··············································································································· 1-11
1.7.3 A IR VENT OF S6600 S ERIES ROUTING SWITCH ················································································· 1-12
2
2
2
2
INSTALLATION
INSTALLATION
INSTALLATION
INSTALLATION PREPARATIONS
PREPARATIONS
PREPARATIONS
PREPARATIONS ·····································································································
·····································································································
·····································································································
····································································································· 2-1
2-1
2-1
2-1
2.1
2.1
2.1
2.1
C
C
C
CHECK
HECK
HECK
HECK D
D
D
DEVICE
EVICE
EVICE
EVICE R
R
R
RUNNING
UNNING
UNNING
UNNING E
E
E
ENVIRONMENT
NVIRONMENT
NVIRONMENT
NVIRONMENT ···························································································
···························································································
···························································································
··························································································· 2-1
2-1
2-1
2-1
2.1.1 CHECK EQUIPMENT ROOM CONDITIONS ······························································································ 2-1
2.1.2 CHECK POWER S
UPPLY
SYSTEM ·········································································································· 2-2
2.2
2.2
2.2
2.2
S
S
S
SAFETY
AFETY
AFETY
AFETY P
P
P
PRECAUTIONS
RECAUTIONS
RECAUTIONS
RECAUTIONS ··························································································································
··························································································································
··························································································································
·························································································································· 2-2
2-2
2-2
2-2
2.2.1 GENERAL SAFETY ································································································································ 2-2
2.2.2 ELECTRICAL SAFETY ···························································································································· 2-3
2.2.3 S
TATIC
SAFETY ····································································································································· 2-3
2.2.4 HANDLING SAFETY ······························································································································ 2-4
2.2.5 LASER SAFETY ····································································································································· 2-5
2.3
2.3
2.3
2.3
O
O
O
OPEN
PEN
PEN
PEN
-P
-P
-P
-P
ACKAGE
ACKAGE
ACKAGE
ACKAGE AND
AND
AND
AND I
I
I
INSPECTION
NSPECTION
NSPECTION
NSPECTION ········································································································
········································································································
········································································································
········································································································ 2-5
2-5
2-5
2-5
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
viii
copyright ©2015 Maipu All rights reserved.
2.4
2.4
2.4
2.4
W
W
W
WOODEN
OODEN
OODEN
OODEN B
B
B
BOX
OX
OX
OX O
O
O
OPEN
PEN
PEN
PEN
-P
-P
-P
-P
ACKAGE
ACKAGE
ACKAGE
ACKAGE ············································································································
············································································································
············································································································
············································································································ 2-6
2-6
2-6
2-6
3
3
3
3
DEVICE
DEVICE
DEVICE
DEVICE INSTALLATION
INSTALLATION
INSTALLATION
INSTALLATION ····················································································································
····················································································································
····················································································································
···················································································································· 3-1
3-1
3-1
3-1
3.1
3.1
3.1
3.1
I
I
I
INSTALL
NSTALL
NSTALL
NSTALL D
D
D
DEVICE
EVICE
EVICE
EVICE TO
TO
TO
TO C
C
C
CABINET
ABINET
ABINET
ABINET ··············································································································
··············································································································
··············································································································
·············································································································· 3-1
3-1
3-1
3-1
3.1.1 INSTALLA TION PREP ARA TIONS ·············································································································· 3-1
3.1.2 CABINET ADJUSTMENT ························································································································ 3-2
3.1.3 INSTALL GUIDE RAIL AND FLOA TING NUT TO CABINET ······································································ 3-3
3.1.4 INSTALL DEVICE TO CABINET ·············································································································· 3-6
3.1.5 INSTALL CABLING RACK ······················································································································ 3-7
3.1.6 INSTALLA TION CHECK ·························································································································· 3-7
3.2
3.2
3.2
3.2
D
D
D
DEVICE
EVICE
EVICE
EVICE G
G
G
GROUNDING
ROUNDING
ROUNDING
ROUNDING ·····························································································································
·····························································································································
·····························································································································
····························································································································· 3-8
3-8
3-8
3-8
3.3
3.3
3.3
3.3
I
I
I
INSTALL
NSTALL
NSTALL
NSTALL S
S
S
SURGE
URGE
URGE
URGE P
P
P
PROTECTOR
ROTECTOR
ROTECTOR
ROTECTOR (O
(O
(O
(O PTIONAL
PTIONAL
PTIONAL
PTIONAL )
)
)
) ···························································································
···························································································
···························································································
··························································································· 3-9
3-9
3-9
3-9
3.3.1 INSTALL AC S URGE PROTECTOR ·········································································································· 3-9
3.3.2 INSTALL NETWORK PORT SURGE PROTECTOR ··················································································· 3-10
3.4
3.4
3.4
3.4
C
C
C
CONNECT
ONNECT
ONNECT
ONNECT P
P
P
POWER
OWER
OWER
OWER C
C
C
CABLE
ABLE
ABLE
ABLE ···················································································································
···················································································································
···················································································································
··················································································································· 3-12
3-12
3-12
3-12
3.4.1 INSTALLA TION PREP ARA TIONS ············································································································ 3-12
3.4.2 CONNECT AC P OWER CABLE ············································································································ 3-12
3.4.3 CONNECT DC P OWER CABLE ············································································································ 3-13
3.5
3.5
3.5
3.5
C
C
C
CHECK
HECK
HECK
HECK AFTER
AFTER
AFTER
AFTER I
I
I
INSTALLATION
NSTALLATION
NSTALLATION
NSTALLATION ·············································································································
·············································································································
·············································································································
············································································································· 3-14
3-14
3-14
3-14
4
4
4
4
POWER
POWER
POWER
POWER ON
ON
ON
ON AND
AND
AND
AND RUN
RUN
RUN
RUN DEVICE
DEVICE
DEVICE
DEVICE ·········································································································
·········································································································
·········································································································
········································································································· 4-1
4-1
4-1
4-1
4.1
4.1
4.1
4.1
L
L
L
LOG
OG
OG
OG INTO
INTO
INTO
INTO D
D
D
DEVICE
EVICE
EVICE
EVICE ·································································································································
·································································································································
·································································································································
································································································································· 4-1
4-1
4-1
4-1
4.1.1 CONNECT CONFIGURA TION CABLE ······································································································ 4-1
4.1.2 SET PC H YPER TERMINAL
P
ARAMETERS ······························································································ 4-2
4.1.3 POWER ON AND S
TART
························································································································· 4-6
4.1.4 CHECK AFTER POWER -ON ···················································································································· 4-7
4.2
4.2
4.2
4.2
A
A
A
ACCESS
CCESS
CCESS
CCESS N
N
N
NETWORK
ETWORK
ETWORK
ETWORK ································································································································
································································································································
································································································································
································································································································ 4-9
4-9
4-9
4-9
4.2.1 ACCESS NETWORK VIA ETHERNET TWISTED
P
AIR ··············································································· 4-9
4.2.2 ACCESS NETWORK VIA LC F IBER ······································································································ 4-10
4.2.3 ACCESS NETWORK VIA MPO F IBER ·································································································· 4-13
4.2.4 ACCESS NETWORK VIA STANDBY CABLE ·························································································· 4-15
4.3
4.3
4.3
4.3
H
H
H
HARDW ARE
ARDW ARE
ARDW ARE
ARDW ARE M
M
M
MANAGEMENT
ANAGEMENT
ANAGEMENT
ANAGEMENT ·················································································································
·················································································································
·················································································································
················································································································· 4-16
4-16
4-16
4-16
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
copyright ©2015 Maipu All rights reserved.
ix
4.3.1 VIEW SOFTW ARE AND HARDW ARE VERSION INFORMA TION OF SWITCH ··········································· 4-17
4.3.2 VIEW SYSTEM ENVIRONMENT TEMPERA TURE INFORMA TION ···························································· 4-18
4.3.3 VIEW
F
AN S
TATUS
INFORMA TION ······································································································· 4-19
4.3.4 VIEW POWER MODULE S
TATUS
INFORMA TION ·················································································· 4-20
4.3.5 VIEW BACKPLANE S
TATUS
INFORMA TION ························································································· 4-21
4.3.6 VIEW MPU C ARD S
TATUS
INFORMA TION ·························································································· 4-23
4.3.7 VIEW SFU C ARD S
TATUS
INFORMA TION ··························································································· 4-27
4.3.8 VIEW LPU C ARD S
TATUS
INFORMA TION ··························································································· 4-31
4.3.9 VIEW SW APP ABLE OPTICAL MODULE INFORMA TION ········································································· 4-35
5
5
5
5
TROUBLESHOOTING
TROUBLESHOOTING
TROUBLESHOOTING
TROUBLESHOOTING ··························································································································
··························································································································
··························································································································
·························································································································· 5-1
5-1
5-1
5-1
5.1
5.1
5.1
5.1
T
T
T
TROUBLESHOOTING
ROUBLESHOOTING
ROUBLESHOOTING
ROUBLESHOOTING OF
OF
OF
OF C
C
C
CONFIGURATION
ONFIGURATION
ONFIGURATION
ONFIGURATION S
S
S
SYSTEM
YSTEM
YSTEM
YSTEM ·············································································
·············································································
·············································································
············································································· 5-1
5-1
5-1
5-1
5.1.1 TROUBLESHOOTING ABOUT NO DISPLA Y ON TERMINAL ······································································ 5-1
5.1.2 TROUBLESHOOTING ABOUT MESSY CODE ON TERMINAL ···································································· 5-2
5.2
5.2
5.2
5.2
P
P
P
POWER
OWER
OWER
OWER T
T
T
TROUBLESHOOTING
ROUBLESHOOTING
ROUBLESHOOTING
ROUBLESHOOTING ·················································································································
·················································································································
·················································································································
················································································································· 5-2
5-2
5-2
5-2
5.3
5.3
5.3
5.3
F
F
F
F
AN
AN
AN
AN T
T
T
TROUBLESHOOTING
ROUBLESHOOTING
ROUBLESHOOTING
ROUBLESHOOTING ·······················································································································
·······················································································································
·······················································································································
······················································································································· 5-3
5-3
5-3
5-3
5.4
5.4
5.4
5.4
T
T
T
TROUBLESHOOTING
ROUBLESHOOTING
ROUBLESHOOTING
ROUBLESHOOTING OF
OF
OF
OF MPU
MPU
MPU
MPU C
C
C
CARD
ARD
ARD
ARD ····································································································
····································································································
····································································································
···································································································· 5-4
5-4
5-4
5-4
5.5
5.5
5.5
5.5
T
T
T
TROUBLESHOOTING
ROUBLESHOOTING
ROUBLESHOOTING
ROUBLESHOOTING OF
OF
OF
OF SFU
SFU
SFU
SFU C
C
C
CARD
ARD
ARD
ARD ······································································································
······································································································
······································································································
······································································································ 5-4
5-4
5-4
5-4
5.6
5.6
5.6
5.6
T
T
T
TROUBLESHOOTING
ROUBLESHOOTING
ROUBLESHOOTING
ROUBLESHOOTING OF
OF
OF
OF LPU
LPU
LPU
LPU C
C
C
CARD
ARD
ARD
ARD ·····································································································
·····································································································
·····································································································
····································································································· 5-5
5-5
5-5
5-5
5.7
5.7
5.7
5.7
G
G
G
GET
ET
ET
ET T
T
T
TECHNICAL
ECHNICAL
ECHNICAL
ECHNICAL S
S
S
SUPPORTING
UPPORTING
UPPORTING
UPPORTING ··············································································································
··············································································································
··············································································································
·············································································································· 5-6
5-6
5-6
5-6
6
6
6
6
DEVICE
DEVICE
DEVICE
DEVICE MAINTENANCE
MAINTENANCE
MAINTENANCE
MAINTENANCE ····················································································································
····················································································································
····················································································································
···················································································································· 6-1
6-1
6-1
6-1
6.1
6.1
6.1
6.1
C
C
C
CHANGE
HANGE
HANGE
HANGE M
M
M
MODULES
ODULES
ODULES
ODULES ·······························································································································
·······························································································································
·······························································································································
······························································································································· 6-1
6-1
6-1
6-1
6.1.1 CHANGE POWER MODULE ··················································································································· 6-1
6.1.2 CHANGE CARD ····································································································································· 6-3
6.1.3 CHANGE
F
AN MODULE ························································································································ 6-5
6.1.4 CHANGE CF C ARD ······························································································································· 6-7
6.1.5 CHANGE SW APP ABLE OPTICAL MODULE ····························································································· 6-9
6.1.6 CHANGE MEMORY ····························································································································· 6-11
6.1.7 CHANGE CHASSIS AIR FILTER ············································································································ 6-12
6.2
6.2
6.2
6.2
D
D
D
DUST
UST
UST
UST M
M
M
MAINTENANCE
AINTENANCE
AINTENANCE
AINTENANCE OF
OF
OF
OF THE
THE
THE
THE D
D
D
DEVICE
EVICE
EVICE
EVICE ································································································
································································································
································································································
································································································ 6-14
6-14
6-14
6-14
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
x
copyright ©2015 Maipu All rights reserved.
6.2.1 REMOVE DUST FOR AIR FIL TER ········································································································· 6-15
6.2.2 REMOVE DUST FOR
F
AN MODULE ····································································································· 6-16
6.2.3 REMOVE DUST FOR BOARDS ············································································································· 6-16
6.2.4 REMOVE DUST FOR OPTICAL INTERFACE AND PIGTAIL CONNECTOR ················································ 6-17
APPENDIX
APPENDIX
APPENDIX
APPENDIX ·················································································································································
·················································································································································
·················································································································································
················································································································································· 6.2-1
6.2-1
6.2-1
6.2-1
A Specifications of Whole Device and Common Modules ········································································· A-1
A1 Power Consumption/Weight/Dimension ······························································································· A-1
A2 Specifications of MPU Card ·················································································································· A-2
A2.1 SM66-MPUA ····································································································································· A-3
A2.2 SM66-MPUB ······································································································································ A-4
A3 Specifications of SFU Card ··················································································································· A-6
A3.1 SM66-SFUA ······································································································································· A-7
A3.2 SM66-SFUB ······································································································································· A-7
A4 Specifications of LPU Card ··················································································································· A-8
A4.1 SM66-8XGEF2QXGE ························································································································ A-8
A4.2 SM66-24GET24GEF ·························································································································· A-9
A4.3 SM66-48GET ··································································································································· A-11
A4.4 SM66-48GEF ··································································································································· A-12
A4.5 SM66-48GETP ································································································································· A-13
A5 Specifications of SIU Card ·················································································································· A-14
A6 Specifications of Power Module ·········································································································· A-14
A6.1 AD1000-1S007Z AC Power Module ································································································ A-15
A6.2 DD1000-5S007Z DC Power Module ······························································································· A-16
B Specifications of General Interfaces ······································································································ B-17
B1 Console Port Attribute ·························································································································· B-17
B2 10Base-T/100Base-TX/1000Base-T-RJ45 Electrical Port Attributes ·················································· B-17
B3 10Base-T/100Base-TX/1000Base-T RJ45 POE+ Interface Attributes ················································ B-18
B4 1000Base-X-SFP Optical Port Attributes ····························································································· B-18
B5 10GBase-SR/LR SFP+ Optical Port Attributes ···················································································· B-19
B6 40GBase-SR4 QSFP+ Optical Port Attributes ····················································································· B-19
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
copyright ©2015 Maipu All rights reserved.
xi
B7 CF Interface Attributes ························································································································· B-19
C Cable ························································································································································ C-1
C1 Console Cable ········································································································································ C-1
C2 Ethernet Eletcical Port Cable ················································································································· C-2
C3 1000Base-X SFP 1000M Optical Module Model and Corresponding Interface Cable Relationship
Table ······························································································································································· C-3
C4 10GBase-SR/LR SFP+ 10G Optical Module Model and Corresponding Interface Cable Relationship
Table ······························································································································································· C-3
C5 40GBase-SR4 QSFP+ 10G Optical Module Model and Corresponding Interface Cable Relationship
Table ······························································································································································· C-4
C6 10G Optical Interface Passive Cable Relationship Table ······································································· C-4
C7 40G Optical Interface Passive Cable Relationship table ········································································ C-5
C8 DC Power Input Cable ··························································································································· C-5
D Device Running Environment Requirement ···························································································· D-1
D1 Environment Requirement of Equipment Room ··················································································· D-1
D1.1 Building Requirement of Equipment Room ······················································································· D-1
D1.2 Temperature Requirement ·················································································································· D-1
D1.3 Humidity Requirement ······················································································································· D-2
D1.4 Load-bearing Requirement ················································································································· D-2
D1.5 Space Requirement ····························································································································· D-3
D1.6 Cleanliness Requirement ···················································································································· D-3
D1.7 Anti-interference Requirement ··········································································································· D-4
D1.8 Grounding Requirement ····················································································································· D-4
D2 Requirements for Power Supply ············································································································ D-4
D2.1 AC Power Supply Requirement ········································································································· D-4
D2.2 AC Power Supply Suggestions ··········································································································· D-5
D2.3 DC Power Supply Requirement ········································································································· D-6
D2.4 DC Power Supply Suggestions ··········································································································· D-6
E Device Grounding Specification and Protection ······················································································ E-1
E1 Device Grounding Specifications ··········································································································· E-1
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
xii
copyright ©2015 Maipu All rights reserved.
E1.1 Universal Grounding Specifications ···································································································· E-1
E1.2 Building Grounding Specifications of Equipment Room ···································································· E-1
E1.3 Device Grounding Specifications ········································································································ E-2
E1.4 Grounding Specifications of Communication Power ·········································································· E-2
E1.5 Laying Specifications of Ground Wires ······························································································ E-3
E2 Device Protection ··································································································································· E-4
E2.1 General Requirement of Lightning Protection Wires ·········································································· E-4
E2.2 Installation Method of Cable Wiring ··································································································· E-5
E2.3 Equipotential Connection Requirement and Method ·········································································· E-7
F Wiring Recommendation ·························································································································· F-1
F1 Wiring Recommendation during Installation ·························································································· F-1
F2 Cable Binding Recommendation ············································································································ F-2
G Environmental Substance Statement ······································································································· G-1
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
copyright ©2015 Maipu All rights reserved.
1
1
1
1
1
Device
Device
Device
Device Introduction
Introduction
Introduction
Introduction
This chapter describes the hardware of the device, including:
1.1 Device Appearance and Hardware
1.2 MPU Card
1.3 SFU Card
1.4 LPU Card
1.5 SIU Card
1.6 Power Module
1.7 Fan Module and Device Air Vent
1.1 Device
Device
Device
Device Appearance
Appearance
Appearance
Appearance and
and
and
and Hardware
Hardware
Hardware
Hardware
MyPower S6600 series high-end routing switch ( Hereinafter referred to as S6600
Series Routing Switches ) contains two product models: SM6600-04-MF and
SM6600-08-MF .
S6600 series routing switch contains four slot types, that is, MPU , SFU , LPU ,
and SIU . The four types of slots are inserted with MPU, SFU, LPU, and SIU
cards respectively.
MPU: Main Processing Unit control card. For the specifications, refer to A2
Specifications of MPU Card .
SFU: Switching Fabric Unit switch card. For the specifications, refer to A3
Specifications of SFU Card .
LPU: Line Processing Unit user network interface card. For the specifications,
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
2
copyright ©2015 Maipu All rights reserved.
refer to A4 Specifications of LPU Card .
SIU: System Interface Unit system interface card. For the specifications, refer
to A5 Specifications of SIU Card .
1.1.1
1.1.1
1.1.1
1.1.1 SM6600-04-MF
SM6600-04-MF
SM6600-04-MF
SM6600-04-MF
The dimension of SM6600-04-MF is 444mm
×
465mm
×
499mm (W × D × H). The
front appearance diagram of SM6600-04-MF is as shown in Figure 1-1 and the
back appearance diagram is as shown in Figure 1-2.
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
1
1
1
1
1
1
1 SM6600-
SM6600-
SM6600-
SM6600- 04
04
04
04 -MF
-MF
-MF
-MF
FRONT
FRONT
FRONT
FRONT APPEARANCE
APPEARANCE
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM
1.Device outlet 2. Mounting ear
3.Power module slots (0-3) 4. Anti-static wrist socket
5. LPU card slots ( 0-3) 6.SFU card slots (0-1)
7.MPU card slots (0-1) 8. Device head
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
copyright ©2015 Maipu All rights reserved.
3
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
1
1
1
2
2
2
2 SM6600-04-MF
SM6600-04-MF
SM6600-04-MF
SM6600-04-MF
BACK
BACK
BACK
BACK APPEARANCE
APPEARANCE
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM
1. Device inlet 2. Air filter
3. Fan module slot 4. Power module fan outlet
5. Grounding screw
1.1.2
1.1.2
1.1.2
1.1.2 SM6600-08-MF
SM6600-08-MF
SM6600-08-MF
SM6600-08-MF
The dimension of SM6600-08-MF is 44 4mm × 465mm × 711mm (W × D × H). The
front appearance diagram of SM6600-08-MF is as shown in Figure 1-3 and the
back appearance diagram is as shown in Figure 1-4.
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
4
copyright ©2015 Maipu All rights reserved.
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
1
1
1
3
3
3
3 SM6600-08-MF
SM6600-08-MF
SM6600-08-MF
SM6600-08-MF
FRONT
FRONT
FRONT
FRONT APPEARANCE
APPEARANCE
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM
1.Device outlet 2. Mounting ear
3.Power module slots (0-3) 4. Anti-static wrist socket
5. LPU card slots ( 0-7) 6.SFU card slots (0-1)
7.MPU card slots (0-1) 8. Device head or SIU card slot
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
copyright ©2015 Maipu All rights reserved.
5
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
1
1
1
4
4
4
4 SM6600-08-MF
SM6600-08-MF
SM6600-08-MF
SM6600-08-MF
BACK
BACK
BACK
BACK APPEARANCE
APPEARANCE
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM
1. Device inlet 2. Air filter
3. Fan module slot 4. Power module fan outlet
5. Grounding screw
1.2 MPU
MPU
MPU
MPU Card
Card
Card
Card
MPU: Main Processing Unit control card
The MPU card is the mandatory card in the SM6600 series routing switch and it
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
6
copyright ©2015 Maipu All rights reserved.
acts as the control center of the device. Each frame can support two MPU cards at
the same time, realizing the 1:1 backup work mode.
The MPU card of SM6600 series device has two shapes, that is, half-width card
and full-width card.
The appearance of the half-width MPU card is as follows:
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
1
1
1
5
5
5
5 T
T
T
T
HE
HE
HE
HE APPEARANCE
APPEARANCE
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM OF
OF
OF
OF THE
THE
THE
THE HALF
HALF
HALF
HALF
-
-
-
-
WIDTH
WIDTH
WIDTH
WIDTH
MPU
MPU
MPU
MPU
CARD
CARD
CARD
CARD
1. C aptive screw 2. Card extractor
3. CF card slot 4. Function port
5. Function status indicator 6. MPU card ID color block (yellow)
The appearance diagram of the full-width MPU card:
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
1
1
1
6
6
6
6 T
T
T
T
HE
HE
HE
HE APPEARANCE
APPEARANCE
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM OF
OF
OF
OF THE
THE
THE
THE FULL
FULL
FULL
FULL
-
-
-
-
WIDTH
WIDTH
WIDTH
WIDTH
MPU
MPU
MPU
MPU
CARD
CARD
CARD
CARD
1. C aptive screw 2. Card extractor
3. Function port 4. CF card slot
5. Function status indicator 6. MPU card ID color block (yellow)
1.3 SFU
SFU
SFU
SFU Card
Card
Card
Card
SFU: Switching Fabric Unit switching card
The SFU card is the switching network unit of the S6600 series routing switching,
realizing the switching function of the service data between the LPU cards. When
MyPower S6600 Series Routing Switch Installation Manual
Installation Preparations
copyright ©2015 Maipu All rights reserved.
7
inserting two cards, realize the 1+1 backup function.
The appearance diagram of the SFU card is as follows:
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
1
1
1
7
7
7
7 T
T
T
T
HE
HE
HE
HE APPEARANCE
APPEARANCE
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM OF
OF
OF
OF THE
THE
THE
THE
SFU
SFU
SFU
SFU
CARD
CARD
CARD
CARD
1. C aptive screw 2. Card extractor
3. LPU card status indicator 4. SFU card ID color block (blue)
The SFU card contains two versions. Different versions of SFU cards cannot be
in mixed use, that is, each frame can only be configured with the same version
of SFU card.
1.4 LPU
LPU
LPU
LPU Card
Card
Card
Card
LPU: Line Processing Unit user network interface card. It provides various
different interface shapes for the user to select, meeting the requirements of
various application scenarios.
The appearance diagram of the LPU card is as follows:
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
1
1
1
8
8
8
8 T
T
T
T
HE
HE
HE
HE APPEARANCE
APPEARANCE
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM OF
OF
OF
OF THE
THE
THE
THE
LPU
LPU
LPU
LPU
CARD
CARD
CARD
CARD
1. C aptive screw 2. Card extractor
3. Status indicator 4. Function port
Installation Preparations MyPower S6600 Series Routing Switch Installation Manual
8
copyright ©2015 Maipu All rights reserved.
5. LPU card ID color block (green)
1.5 SIU
SIU
SIU
SIU Card
Card
Card
Card
SIU : System Interface Unit system interface card
The SIU card is used for SM6600-08-MF and one is optional. With the LCD panel
and buttons, the user can query the product working status and indicate the
system working status via the LED indicator.
The SM66-SIU appearance diagram is as follows:
F
F
F
F
IGURE
IGURE
IGURE
IGURE
1
1
1
1
9
9
9
9 SM66-
SM66-
SM66-
SM66- SIU
SIU
SIU
SIU
APPEARANCE
APPEARANCE
APPEARANCE
APPEARANCE DIAGRAM
DIAGRAM
DIAGRAM
DIAGRAM
1. C aptive screw 2. Company logo
3. LCD screen 4. Function button
5. Status indicator 6. Device model nameplate
1.6 Power
Power
Power
Power Module
Module
Module
Module
S6600 series routing switch supports AC and DC power supply mode. The user
can select the AC or DC power module as desired.
The AC and DC power modules both can support N+1 redundant backup and also
can realize the output power balance, so as to improve the system reliability. The
power modules automatically realize the current sharing and do not need the
user operation.
/