FläktGroup LQN(N,P) Air cooler Installation guide

Type
Installation guide
FläktGroup DC_9145GB 20180329_R0
Specifications are subject to alteration without notice
INSTALLATION INSTRUCTION
LQN(N,P) AIR COOLER
Fig. 1
CONDENSATE DRAINAGE FOR THE LQN(N, P)
The finned heat exchangers are provided with 32 mm dia. drain con-
nections for connection to a water trap with a depth of at least 100
mm. Preferably use the LQAZ-08 water trap (see separate instruction).
LQNP AIR COOLER
Connections should be carried out by a refrigeration fitter.
The air cooler should be connected to the pipework in such a manner
that expansion forces or the deadweight of the pipework will not be
applied to the liquid connections.
LQNN AIR COOLER
Connections to the pipework should be made by the pipework con-
tractor. Connect the finned heat exchanger to the pipework in such a
manner that expansion forces or the dead weight of the pipework will
not be applied to the liquid connections.
The liquid connections are provided with identification plates for the in-
let and outlet.
CAUTION!
Use a pipe wrench to restrain the pipe connections of
the heat exchanger when tightening the external pipe
connections.
Fig. 2
LQAZ-08 Water trap
  • Page 1 1