BLOTZ B28-ME-110 Assembly Instructions

Type
Assembly Instructions
28mm Desert Fort Long Wall (Barracks)
B28-ME-110
Please read these instructions fully before starting construction.
PVA or equivalent glue will be required to stick sections together.
Sand paper can be used to gently clean any joints.
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due care and remember
to cut away from yourself at all times.
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold pieces in place while
you allow glue to dry.
Remove these pieces from the sprue.
Glue them together as shown above.
Take the wall and connector pieces.
Attach the sub-assembly to the base then add the
wall and connector pieces.
Take the door and roof supports.
[Optional] Glue the door behind the doorway.
Glue the supports into place, inserting them
through the back of the wall.
Add the walkway, carefully inserting the lugs into
the corresponding holes.
Add the front wall.
Place (do not glue) the barracks roof into position.
The barracks roof can be removed during gameplay by applying gentle pressue to the edge next to the
walkway allowing it to pivot on the supporting arch.
  • Page 1 1
  • Page 2 2

BLOTZ B28-ME-110 Assembly Instructions

Type
Assembly Instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI