AKR 928 - AKR 958
5019 318 33088
INSTALLATION - ASSEMBLY INSTRUCTIONS
Preliminary information for installing the hood
Before starting installation, disconnect the power supply at the home main switch.
Remove the grease filter/s and the carbon filter holder.
1.
Pre-assemble the three parts of the flue support bracket with 4 screws; the width
X
of the bracket
G
must
be identical to the internal width of the telescopic flue.
For filter version only
:
Pre-assemble the three parts of the deflector with 2 screws; the width
X
of the deflector
F
must be
identical to the internal width of the telescopic flue.
2.
Place the extraction unit on a flat surface and fit the bottom part of the hood on it.
Secure it with 4 screws.
Model AKR 958 only
Carry out the electrical connections between the two parts.
3.
Using a pencil, draw the centre line on the wall up to the ceiling to facilitate installation operations.
4.
Attach the hole diagram to the wall: the vertical centre line printed on the hole diagram must match the
centre line drawn on the wall, and the lower edge of the hole diagram must match the lower edge of the
hood.
Remember that with installation completed the bottom of the hood must be at least 50 cm above the hob
in case of electric cookers and 75 cm in case of gas or mixed cookers.
5.
Place the support bracket on the hole diagram so that it matches the dashed rectangle, mark the two
external holes and drill, remove the hole diagram.
6.
Insert 2 wall plugs and fix the hood support bracket with two 5x45 mm screws.
7.
Hook the hood to the bracket.
8.
Adjust the distance between the hood and the wall.
9.
Adjust the hood horizontally.
10.
From the inside of the extraction unit, mark the holes for fixing the hood (to do so, remove the filter
holder; refit it after fixing the hood).
11.
Remove the hood from the bracket and drill on the mark (Ø 8 mm - see step 10). Insert 1 wall plug.
12.
Fit the flue support bracket
G
to the wall and against the ceiling, use the support bracket as hole diagram
(the small slot on the support must match the line drawn on the wall - step 3) and mark 2 holes with the
pencil, drill the holes (Ø 8 mm), and finally insert 2 plugs.
13.
Fix the flue support bracket to the wall with two 5x45 mm screws.
14.
Hook the hood to the bottom bracket. Fix the hood to the wall with a 5x45mm screw (ABSOLUTELY
NECESSARY).
15.
Connect an exhaust pipe (pipe and clamps are not supplied and must be bought separately) to the collar
B
located above the extraction motor unit.
For extractor operation, connect the other end of the exhaust pipe to the home discharge device. For filter
operation, fix the deflector
F
to the flue support bracket
G
with 4 screws and connect the other end of
the exhaust pipe to the deflector collar
F
(if the collar is not already fitted it should be inserted on the
deflector and secured with 1 screw). Once the steam and fumes have been filtered by the carbon filter
(not provided, to be ordered separately) they are conveyed back to the kitchen through grid
H
.
16.
Carry out the electrical connection.
17.
Fit the casing on the runners.
18.
Fix the casing to the hood with 4 screws
19.
Apply the flues and fix them with 2 screws (
19a
) to the flue support
G
(
19b
).
20. Model AKR 928 only
: Carry out the electrical connections between the two parts.
21.
Slide the bottom section of the flue in the special seat above the hood to completely cover the extraction
unit and fix it to the hood (
21a
) with 2 screws (
22b
).
Refit the grease filter/s and the carbon filter holder, and check for correct hood operation.
S
N DK
FIN
GB