AVFI DIR9200-12 Assembly Guide

  • Hello! I've reviewed the assembly instructions for the AVFI DIR9200 Rack Cube and I'm ready to assist you with any questions you might have. The document outlines the necessary steps for assembling the rack, including attaching the rails, securing the top, and adding equipment. It also highlights the need for a 3/8" wrench or socket during assembly. Please feel free to ask me anything about the assembly process or the features of the rack.
  • What should I do if I can't understand the instructions?
    What tools are required for assembly?
    What size are the rack screws needed to mount equipment?
DIR9200 Rack Cube
Thank you for purchasing AVFIā€™s DIR9200 rack cube.
This rack has various models in multiple heights.
If you cannot understand these instructions or are concerned about safety of the installation
Contact a qualified contractor or contact AVFI at 1-877-834-3876.
3/8ā€ Socket or wrench
DIR9200 Assembly Instructions
www.video-furn.com 288 Don Hillock Drive |Aurora |Ontario|L4G 0G9
1.877.834.3876
(4) Rack rail
Length will depend on model
(2) DIR9200 TOP and Bottom
3/8ā€ wrench
Or socket.
(16) 1/4-20
Hex Nuts
Height will vary
depending on model
Assemble rack rails with base
as shown. Turn nuts by hand
leaving loose.
Attach top base and tighten all
16 nuts.
Proceed to add equipment
using 10-32 rack screws.
Front
Back
2
1
3
Supplied Parts
Tools required
/