CTV-1501

Goodway CTV-1501 User guide

  • Hello, I'm a chat assistant that has reviewed the CTV-1501 Quick Start Guide. This document provides a step-by-step guide to getting your Cooling Tower Vacuum ready for use. I understand the priming procedure, hose connections, and initial start-up. Feel free to ask me any questions you have regarding this device.
  • Where can I find important safety instructions?
    What should I do if the unit fails to prime?
    What is the first step in priming the device?
CTV-1501 Quick
Start Guide
PLEASE REVIEW
IMPORTANT SAFETY
INSTRUCTIONS
LOCATED IN
OPERATORS MANUAL
Proper Startup
Essentials
* Accessories sold separately
PLEASE REVIEW IMPORTANT SAFETY INSTRUCTIONS
LOCATED IN THE OPERATORS MANUAL CTV-F2 Optional Filter
GETTING READY
Outlet Hose Prime Valve
Closed
Inlet Valve
Open
Outlet Valve
Closed
Power
Switch
OFF
Inlet Hose
PRIMING THE
CTV-1501
With the water supply turned on, submerge
the cleaning tool under the surface of the
water in the cooling tower basin.
1
Open the prime valve to…
2
Purge the air from the
inlet hose.
3
When the air
bubbles stop,
go back to the
machine and
turn the power
switch on and
partially open
the outlet valve.
4
GOODWAY® TECHNOLOGIES CORPORATION
420 West Avenue, Stamford, CT 06902 USA
Tel: 203-359-4708 · Toll-Free Tel: 800-243-7932
Fax: 203-359-9601 · Toll-Free Fax: 800-359-9625
Email: goodway@goodway.com
Visit: www.goodway.com
HVAC & FACILITY MAINTENANCE SOLUTIONS
Close the prime valve when a full
column of water is owing. Begin
vacuuming the basin, keeping the
cleaning tool under the surface
of the water. If the unit fails to
prime consult the Operating and
Maintenance Manual.
5
FNL 0823
/