Dell PowerSwitch S4048-ON Quick start guide

Category
Network switches
Type
Quick start guide
S4048-ON Installation Guide
January 2019
Notes, Cautions, and Warnings
NOTE: A NOTE indicates important information that helps you make better use of your computer.
CAUTION: A CAUTION indicates either potential damage to hardware or loss of data and tells you how to avoid the problem.
WARNING: A WARNING indicates a potential for property damage, personal injury, or death.
© 2014 - 2019 Dell Inc. or its subsidiaries. All rights reserved. Dell, EMC, and other trademarks are trademarks of Dell Inc. or its subsidiaries. Other
trademarks may be trademarks of their respective owners.
2019 - 01
Rev. A06
Contents
1 About this guide............................................................................................................................................. 5
Related documents............................................................................................................................................................ 5
2 The S4048–ON switch.................................................................................................................................. 6
Introduction.........................................................................................................................................................................6
Features...............................................................................................................................................................................7
Physical dimensions........................................................................................................................................................... 7
Switch status......................................................................................................................................................................8
LED display..........................................................................................................................................................................8
LED behavior................................................................................................................................................................ 9
Prerequisites.......................................................................................................................................................................11
S4048–ON congurations............................................................................................................................................... 11
3 Site preparations.......................................................................................................................................... 12
Site selection..................................................................................................................................................................... 12
Cabinet placement............................................................................................................................................................12
Rack mounting.................................................................................................................................................................. 13
Switch ground................................................................................................................................................................... 13
Fans and airow................................................................................................................................................................13
Fan combinations........................................................................................................................................................13
Power................................................................................................................................................................................. 13
Storing components......................................................................................................................................................... 13
4 NEBS compliance.........................................................................................................................................15
Important information...................................................................................................................................................... 15
5 S4048–ON installation................................................................................................................................. 16
Unpack the switch............................................................................................................................................................16
Unpack.........................................................................................................................................................................16
Rack or cabinet hardware installation............................................................................................................................ 16
Rack mount safety considerations............................................................................................................................17
ReadyRails system installation...................................................................................................................................17
Two-post ush-mount conguration........................................................................................................................18
Two-post center-mount conguration.....................................................................................................................19
Four-post threaded conguration............................................................................................................................20
S4048-ON installation................................................................................................................................................21
1U front-rack installation............................................................................................................................................ 21
Ground cable...............................................................................................................................................................23
SFP+ and QSFP+ optic installation................................................................................................................................23
QSFP+ optic replacement.........................................................................................................................................24
Split QSFP+ ports to SFP+ ports............................................................................................................................ 24
Switch power-up..............................................................................................................................................................24
Contents
3
Power up sequence................................................................................................................................................... 24
6 Power supplies.............................................................................................................................................25
Components..................................................................................................................................................................... 25
AC power supply installation...........................................................................................................................................26
AC power supply replacement..................................................................................................................................27
DC power supply installation...........................................................................................................................................27
DC power connections..............................................................................................................................................29
DC labels..................................................................................................................................................................... 30
7 Fans..............................................................................................................................................................31
Components......................................................................................................................................................................31
Fan module installation.................................................................................................................................................... 32
Fan module replacement.................................................................................................................................................32
After S4048–ON installation.......................................................................................................................................... 32
8 Management ports...................................................................................................................................... 33
RS-232 console port access...........................................................................................................................................33
Micro USB-B console port access.................................................................................................................................34
Mounting the USB storage.......................................................................................................................................34
Before you install an OS.................................................................................................................................................. 35
Example of the grub bootloaderExample of ONIE.................................................................................................35
ONIE service discovery............................................................................................................................................. 36
9 Specications..............................................................................................................................................38
Chassis physical design................................................................................................................................................... 38
IEEE standards................................................................................................................................................................. 39
Agency compliance..........................................................................................................................................................39
Network Equipment Building Systems Compliance.....................................................................................................39
USA Federal Communications Commission Statement.............................................................................................. 40
European Union EMC Directive Conformance Statement......................................................................................... 40
Japan VCCI Compliance for Class A Equipment...........................................................................................................41
Korean Certication of Compliance................................................................................................................................41
Safety Standards and Compliance Agency Certications.......................................................................................... 42
Electromagnetic Compatibility .......................................................................................................................................42
EmissionsImmunity.....................................................................................................................................................42
Product recycling and disposal....................................................................................................................................... 43
Waste Electrical and Electronic Equipment (WEEE) Directive for Recovery, Recycle and Reuse of IT
and Telecommunications Products.......................................................................................................................... 43
10 Technical Support...................................................................................................................................... 44
Dell EMC support.............................................................................................................................................................44
4
Contents
About this guide
This guide provides site preparation recommendations, step-by-step procedures for rack mounting and desk mounting, inserting optional
modules, and connecting to a power source.
CAUTION: To avoid electrostatic discharge (ESD) damage, wear grounding wrist straps when handling this equipment.
WARNING: Only trained and qualied personnel can install this equipment. Read this guide before you install and power up this
equipment. This equipment contains two power cords. Disconnect both power cords before servicing.
WARNING: This equipment contains optical transceivers, which comply with the limits of Class 1 laser radiation.
Figure 1. Class 1 laser product
NOTE
: When no cable is connected, visible and invisible laser radiation may be emitted from the aperture of the optical
transceiver ports. Avoid exposure to laser radiation and do not stare into open apertures.
Related documents
For more information about the S4048–ON switch, see the following documents:
Dell Networking S4048–Open Networking (ON) Getting Started Guide
Dell Networking S4048–Open Networking (ON) Release Notes
Dell Open Networking Troubleshooting Guide
NOTE
: For the most recent documentation, visit Dell EMC support: www.dell.com/support.
1
About this guide 5
The S4048–ON switch
The following sections describe the Dell EMC S4048–ON switch:
Topics:
Introduction
Features
Physical dimensions
Switch status
LED display
Prerequisites
S4048–ON congurations
Introduction
S4048-ON is a networking switch for campus aggregation and core switching 10 Gbps servers and 40 Gbps optical uplinks to the 40 Gbps
switching fabric in the core.
The S4048–ON has:
Forty-eight ports of 10G SFP+ ports for a 1/10 Gbps transceiver
Six 40 Gbps xed QSFP+ optical ports for a 40 Gbps transceiver
Serial RS 232 port, RJ-45, and MicroUSB
RJ–45 management port
The S4048–ON I/O side includes:
Forty-eight xed SFP+ and six xed QSFP+ ports
Management port
USB 2.0 port
Serial RS 232 port, RJ-45 and MicroUSB
LED display for the switch, fan, and power status
Figure 2. S4048–ON I/O-side view
2
6 The S4048–ON switch
1 SFP+ ports
2 QSFP+ ports
3 USB Type-A storage port
4 MicroUSB console port
Figure 3. S4048–ON PSU-side view
1 Power supply unit 1
2 Fan module
3 Out-of-band management port
4 Power supply unit 2
5 RS-232 serial console port
Features
The S4048–ON oers the following features:
Forty-eight xed 1/10 Gbps SFP+ ports
Six xed 40 Gbps QSFP+ ports for 40 Gbps transceivers
One Micro USB serial console port
One universal serial bus (USB) Type-A port for more le storage
Rangeley Central processing unit (CPU) system with large memory with 2 GB DDR III RAM
Temperature monitoring
Software-readable thermal monitor
Real time clock (RTC) support
Hot-plug redundant power supply
Power management monitoring
Removable fans
Standard 1U chassis
Physical dimensions
The S4048-ON has the following physical dimensions:
440 x 460 x 44 mm (W x D x H)
17.32 x 18.11 x 1.73 inches (W x D x H)
The S4048–ON switch
7
Switch status
You can view S4048–ON status information using the light emitting diodes (LEDs).
LED display
The S4048–ON includes LED displays on both the I/O Port and PSU side of the chassis, as shown. Some LED behaviors may change after
you install your software.
Figure 4. S4048–ON LEDs
1 SFP+ port Link and activity LEDs
2 System LEDs
3 QSFP+ port LEDs
4 FAN LED
5 Management port LEDs
6 PSU LED
8
The S4048–ON switch
LED behavior
The following S4048–ON switch LED behavior is seen during open networking installation environment (ONIE) operations:
Figure 5. S4048–ON LEDs
1 Master LED
2 System LED
3 Power LED
4 Fan LED
5 Locator LED
6 SFP+ link/activity LEDs
7 Stack LED
8 USB port LED
9 QSFP+ link/activity LEDs
Table 1. S4048–ON LED behavior
LED Description
System Status/Health LED
Solid green—Normal operation
Flashing green—Booting
Solid amber—Critical system error
Flashing amber—Non-critical system error, fan failure, or power
supply failure
Power LED
O—No power
Solid Green—Normal
Solid amber—POST is in process
Flashing amber—Power supply failed
MASTER LED
O—Switch is in Stacking Slave mode
Solid green—System is in Stacking Master or Standalone mode
The S4048–ON switch 9
LED Description
FAN LED
Solid green—fan powered and running at the expected RPM
Solid amber—fan failed including incompatible airow direction
when you insert the PSU or fan trays with diering airows
PSU LED
Solid green—Normal operation
Solid amber—Power supply critical event causing a shutdown
Flashing amber—Power supply warning event; power continues
to operate.
LOCATOR LED
O—Locator function is disabled
Flashing blue—Locator function is enabled
Table 2. Management Ethernet port LEDs
LED Description
Link LED
O—No Link
Solid green—Link on 1 Gbps speed
Solid yellow—Link on 10/100 Mbps speeds
Table 3. SFP+ port LEDs
LED Description
Link LED
O—No Link
Solid green—Link on 10 Gbps speed
Solid amber—Link on 1 Gbp speed
Activity LED
O—No Link
Blinking green—Transmit/receive is active
Table 4. Default 1x40G mode QSFP+ port LEDs
LED Description
Link LED
O—No Link
Solid green—Link operating at maximum speed—40 Gbps
Solid amber—Link operating at lower speed—10 Gbps
Flashing amber—one second on and one second o—port
beacon
Activity LED
O—No Link
Flashing green—Link activity at maximum speed—40 Gbps
Flashing amber—Link activity at lower speed—10 Gbps
10 The S4048–ON switch
Table 5. 4x10G mode QSFP+ port LEDs
LED Description
Link LED
O—No Link
Solid green—Link operating at 10 Gbps speed
Solid amber—Link operating at lower 1 Gbps speed
Activity LED
O—No Link
Flashing green—Link activity at 10 Gbps speed
Flashing amber—Link activity at 1 Gbps speed
Prerequisites
The following is a list of components required for successful installation of the S4048-ON.
NOTE: Detailed installation instructions for the S4048-ON are provided in Site Preparations and Install the S4048–ON.
S4048–ON chassis or multiple chassis, if stacking
AC country- and regional-specic cables to connect the AC power source to each of the chassis’ AC power supplies
Mounting brackets for rack installation, included
Screws for rack installation
#1 and #2 Phillips screwdrivers, not included
Torx screwdriver, not included
Ground cable screws, included
Copper/ber cables
Other optional components are:
Ground cable
Additional power supply unit
Additional fan module
Additional mounting brackets if installing in a four-post rack or cabinet
S4048–ON congurations
You can order the S4048–ON switch in several dierent congurations. You can also order optional modules and optics separately.
You can order the following supported hardware components:
S4048–ON AC Normal Airow: 48 port 10 G RJ-45 ports with six QSFP+ 40 G ports, one AC power supply and three fan subsystems.
Airow is from the I/O-side to the PSU-side.
S4048–ON AC Reverse Airow: 48 port 10 G RJ-45 ports with six QSFP+ 40 G ports, one AC power supply and three fan subsystems.
Airow is from the PSU-side to the I/O-side
Fan with airow from the I/O-side to the PSU-side
Fan with airow from the PSU-side to the I/O-side
AC Power supply with airow from the I/O-side to the PSU-side
AC Power supply with airow from the PSU-side to the I/O-side
The S4048–ON switch
11
Site preparations
The S4048–ON is suitable for installation as part of a common bond network (CBN).
You can install the switch in:
Network telecommunication facilities
Data centers
Other locations where the National Electric Code (NEC) applies
For more information about S4048–ON specications, see Specications.
NOTE: Install the S4048–ON switch into a rack or cabinet before installing any optional components.
Topics:
Site selection
Cabinet placement
Rack mounting
Switch ground
Fans and airow
Power
Storing components
Site selection
Install Dell EMC equipment in restricted access areas.
A restricted access area is one in which service personnel can only gain access using a special tool, lock, key or other means of security and
access is controlled by the authority responsible for the location.
Ensure that the area where you install your S4048–ON switch meets the following safety requirements:
Near an adequate power source. Connect the switch to the appropriate branch circuit protection as dened by your local electrical
codes.
Environmental temperature between 32° to 113°F (from 0° to 45°C).
The switch operating ambient temperature range is from 10° to 35°C (from 50° to 95°F).
Operating humidity is from 5 to 85 percent non-condensing.
Storage humidity is from 5 to 95 percent non-condensing.
In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot air vents or direct sunlight.
Away from sources of severe electromagnetic noise.
Positioned in a rack or cabinet, or on a desktop with adequate space in the front, rear, and sides of the S4048–ON for proper
ventilation and access.
Cabinet placement
Install the S4048–ON only in indoor cabinets designed for use in a controlled environment.
Do not install the S4048–ON in outside cabinets. For cabinet placement requirements, see Site Selection.
3
12 Site preparations
The cabinet must meet minimum size requirements. Airow must be in accordance with the Electronic Industries Alliance (EIA) standard.
Ensure that there is a minimum of 5 inches (12.7 cm) between the intake and exhaust vents and the cabinet wall.
Rack mounting
When you prepare your equipment rack, ensure that the rack is grounded.
Ground the equipment rack to the same ground point the power service in your area uses. The ground path must be permanent.
Switch ground
Dell EMC recommends you ground you switch. Use the S4048–ON in a common bond network (CBN).
Connect the grounding cables as described in Install the S4048–ON.
Fans and airow
The S4048–ON fans support two airow options.
Fan combinations
The S4048-ON has stock keeping units (SKUs) that support the following congurations. Installation of the fans is done as part of the
factory install based on SKU type.
AC PSU with fan airow from the I/O-side to the PSU-side
AC PSU with fan airow from the PSU-side to the I/O-side
Be sure to order the fans suitable to support your site’s ventilation. Use a single type of airow fan in your switch. Do not mix reverse and
normal air ows in a single S4048–ON chassis.
For proper ventilation, position the S4048-ON in an equipment rack (or cabinet) with a minimum of 5 inches (12.7 cm) of clearance around
the exhaust vents. When you install two S4048-ON switches near each other, position the two chassis at least 5 inches (12.7 cm) apart to
permit proper airow. The fan speed increases when the internal temperature reaches 161.6°F (72°C) and decreases to normal speed
when the temperature falls to 136.4°F (58°C). The S4048-ON never intentionally turns o the fans.
Power
To connect the chassis to the applicable power source, use the appropriate power cord with the S4048–ON. An AC power cord is included
with the switch.
When installing AC switches, follow the requirements of the National Electrical Code, ANSI/NFPA 70 where applicable.
The switch is powered-up when the power cord is connected between the switch and the power source.
CAUTION
: Always disconnect the power cable before you service the power supply slots.
CAUTION: Use the power supply cord as the main disconnect device on the AC switch. Ensure that the socket-outlet is located/
installed near the equipment and is easily accessible.
Storing components
If you do not install your S4048–ON and components immediately, Dell EMC recommends properly storing the switch and all optional
components by following these guidelines.
Storage location temperature must remain constant ranging from -40° to 158°F (from -40°C to 70°C).
Site preparations
13
Store on a dry surface or oor, away from direct sunlight, heat, and air conditioning ducts.
Store in a dust-free environment.
NOTE: ESD damage can occur when components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the S4048–ON and its accessories. After you remove the original packaging, place the S4048–ON and its
components on an anti-static surface.
14 Site preparations
NEBS compliance
For your switch to be network equipment building system (NEBS) compliant, you must follow the instructions detailed in this section.
To be NEBS compliant, orient your switch in the rack so that the air inlet is from the front aisle and the air exhaust is to the back aisle.
Important information
WARNING: The SFP+, QSFP, QSFP28, console, Ethernet management, and universal serial bus (USB) ports are suitable for
connection to intrabuilding or unexposed wiring or cabling only. You MUST NOT metallically connect the ports to interfaces that
connect to the out side plant (OSP) or its wiring. Use these interfaces as intrabuilding interfaces only (Type-2 or Type-4 ports as
described in GR-1089-CORE, Issue 6) and they require isolation from the exposed OSP cabling. Adding primary protectors is not
sucient protection to connect these interfaces metallically to OSP wiring.
WARNING: If you install and connect the S4048-ON switch to a commercial AC power source, you must connect the switch to
an external special protection device (SPD).
To be NEBs compliant:
Locate your switch in a restricted-access area were only trained personnel are allowed access.
Install and connect your switch to the common bonding network (CBN).
You can also install and connect your switch to the central oce.
Connect the battery returns of your switch as DC-I.
Ground your switch using a copper ground conductor.
Clean and coat all bare grounding connection points on your switch with an antioxidant solution before making connections.
Bring all unplated surfaces on your switch to a bright nish and treat them with an antioxidant solution before making connections.
To ensure electrical continuity, remove any nonconductive surfaces on your switch from the threads and connection points.
Use the two-hole, Listed, compression-type lug with an AWG 14 gauge wire for switch grounding.
NOTE
: The S4048–ON can operate at -40.5 VDC to -60 VDC at a maximum current level of 15A.
NOTE: The S4048-ON is Earthquake Z4-compliant when you attach the ReadyRails to the four-post frame using threaded
hardware. Do not use the tool-less or two-post installation methods.
4
NEBS compliance 15
S4048–ON installation
To install the S4048–ON switch, Dell EMC recommends completing the installation procedures in the order presented in this chapter.
Always handle the S4048–ON and its components with care. Avoid dropping the switch or its eld replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the S4048–ON and its components. As with all electrical devices of this type, take all the necessary safety precautions
to prevent injury when installing this switch.
Topics:
Unpack the switch
Rack or cabinet hardware installation
SFP+ and QSFP+ optic installation
Switch power-up
Unpack the switch
NOTE
: Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S4048-ON switch, make sure that the following items are included:
One S4048-ON switch
One RJ-45 to DB-9 female cable
Two sets of rail kits, no tools required
One PSU—a second PSU is sold separately
One AC country/region-specic power cord
S4048–ON Getting Started Guide
Safety and Regulatory Information
Warranty and Support Information
Unpack
1 Place the container on a clean, at surface and cut all straps securing the container.
2 Open the container or remove the container top.
3 Carefully remove the switch from the container and place it on a secure and clean surface.
4 Remove all packing material.
5 Inspect the product and accessories for damage.
Rack or cabinet hardware installation
You may either place the switch on the rack shelf or mount the switch directly into a 19" wide, EIA-310- E-compliant rack—four-post, two-
post, or threaded methods. The ReadyRails™ system is provided for one 1U front-rack and two-post installations.
The ReadyRails system includes two separately packaged rail assemblies and two rails that are shipped attached to the sides of the switch.
5
16 S4048–ON installation
WARNING: This is a condensed reference. Read the safety instructions in your Safety, Environmental, and Regulatory
information booklet before you begin.
NOTE: The illustrations in this document are not intended to represent a specic switch.
NOTE: Do not the use the mounted Ready-Rails as a shelf or a workplace.
Rack mount safety considerations
Rack loading—Overloading or uneven loading of racks may result in shelf or rack failure, causing damage to the equipment and possible
personal injury. Stabilize racks in a permanent location before loading begins. Mount the components beginning at the bottom of the
rack, then work to the top. Do not exceed your rack’s load rating.
Power considerations—Connect only to the power source specied on the unit. When multiple electrical components are installed in a
rack, ensure that the total component power ratings do not exceed the circuit capabilities. Overloaded power sources and extension
cords present re and shock hazards.
Elevated ambient temperature—If installed in a closed rack assembly, the operating temperature of the rack environment may be
greater than the room ambient temperature. Use care not to exceed the 45°C maximum ambient temperature of the switch.
Reduced air ow—Install the equipment in the rack so that the amount of airow required for safe operation of the equipment is not
compromised.
Reliable earthing—Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than
the direct connections to the branch circuit, for example: use of power strips.
Do not mount the equipment with the rear panel facing in the downward position.
ReadyRails system installation
The ReadyRails rack mounting system is provided to easily congure your rack for installation of your S4048-ON switch.
You can install the ReadyRails system using the 1U tool-less method or one of three possible 1U tooled methods: two-post ush mount,
two-post center mount, or four-post threaded.
CAUTION
: Your switch is not NEBS Earthquake Z4-compliant if you use the 1U tool-less square-hole or two-post installation
methods.
1 With the ReadyRails ange ears facing outward, place one rail between the left and right vertical posts.
Align and seat the rear ange rail pegs in the rear vertical post ange. Item 1 and its extractions show how the pegs appear in both the
square and non-threaded round holes.
S4048–ON installation
17
Figure 6. 1U tool-less conguration
2 Align and seat the front ange pegs in the holes on the front side of the vertical post, item 2.
3 Repeat this procedure for the second rail.
4 To remove each rail, pull on the latch release button on each ange ear and unseat each rail, item 3.
Two-post ush-mount conguration
CAUTION
: Your switch is not NEBS Earthquake Z4-compliant if you use this installation method.
1 For this conguration, remove the latch castings from the front side of each ReadyRails assembly, item 1.
To remove the two screws from each front ange ear on the switch side of the rail and remove each casting, use a Torx screwdriver.
Retain the castings for future rack requirements. It is not necessary to remove the rear ange castings.
18
S4048–ON installation
Figure 7. Two-post ush-mount conguration
2 Attach one rail to the front post ange with two user-supplied screws, item 2.
3 Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post ange with two user-supplied
screws. Refer to item 3.
4 Repeat this procedure for the second rail.
Two-post center-mount conguration
CAUTION
: Your switch is not NEBS Earthquake Z4-compliant if you use this installation method.
1 Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post ange with two user-supplied
screws, item 1.
S4048–ON installation
19
Figure 8. Two-post center-mount conguration
2 Slide the back bracket towards the post and secure it to the post ange with two user-supplied screws, item 2.
3 Repeat this procedure for the second rail.
Four-post threaded conguration
CAUTION
: To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in Step 1.
1 For this conguration, remove the latch castings from each end of the ReadyRails assemblies.
To remove the two screws from each ange ear and remove each casting, use a Torx driver, item 1. Retain the castings for future rack
requirements.
20
S4048–ON installation
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44

Dell PowerSwitch S4048-ON Quick start guide

Category
Network switches
Type
Quick start guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI