BARRON TLED-LVT Series 2' and 4' Linear Vaportight Installation guide

Type
Installation guide
TLED-LVT
INSTALLATION INSTRUCTIONS
800533.3948 www.barronltg.com
20070072 REV 1 - 01/14 1
SAVE THESE INSTRUCTIONS!
READ CAREFULLY AND FOLLOW ALL INSTRUCTIONS FOR YOUR OWN SAFETY
DISCONNECT AC POWER SUPPLY BEFORE SERVICING.
• Installation and servicing of this equipment should be performed by qualified service personnel only.
• Ensure the electricity connections conform to the National Electrical Code and local regulations if applicable.
• Do not mount near gas or electrical heaters.
• Equipment should be mounted in locations and at heights where it will not readily be subjected to tampering by
unauthorized personnel.
• The use of accessory equipment not recommended by the manufacturer may cause an unsafe condition. Any
modification or use of non-original components will void the warranty and product liability.
• Do not use this equipment for other than intended use.
INSTALLATION INSTRUCTIONS
CABLE MOUNTED
Ceiling
Screw Hole
Electric drill
Drill holes at desired location to
mount steel cables.
1
Secure fixture to the end of the
steel cables, using appropriate
hardware.
3
Steel
Cable
Connect steel cables to ceiling,
using appropriate hardware for
mounting surface.
2
Adjust to desired height, clean off
dust and debris.
4
  • Page 1 1
  • Page 2 2

BARRON TLED-LVT Series 2' and 4' Linear Vaportight Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI