Baxter DPC1S Proofer Installation guide

Type
Installation guide
DPC1S DEHUMIDIFYING
PROOFING CABINET
INSTALLATION INSTRUCTIONS
DPC1S ML-132533
- NOTICE -
This Manual is prepared for the use of trained Hobart Service Technicians and should not
be used by those not properly qualified.
This manual is not intended to be all encompassing. If you have not attended a Hobart Service
School for this product, you should read, in its entirety, the repair procedure you wish to
perform to determine if you have the necessary tools, instruments and skills required to
perform the procedure. Procedures for which you do not have the necessary tools,
instruments and skills should be performed by a trained Hobart Service Technician.
The reproduction, transfer, sale or other use of this manual, without the express written
consent of Hobart, is prohibited.
This manual has been provided to you by ITW Food Equipment Group LLC ("ITW FEG")
without charge and remains the property of ITW FEG, and by accepting this manual you agree
that you will return it to ITW FEG promptly upon its request for such return at any time in the
future.
SERVICE MANUAL
A product of Baxter MFG. Co., Inc 19220 State Route 162 East Orting, WA 98360
F45568 Rev. D (0923)
TABLE OF CONTENTS
SERVICE UPDATES ....................................................................................... 3
SERVICE UPDATES ................................................................................... 3
GENERAL .................................................................................................. 4
INTRODUCTION ....................................................................................... 4
UNPACKING ........................................................................................... 4
LOCATION ............................................................................................. 4
CLEARANCE DIMENSIONS ............................................................................ 4
TOOLS ................................................................................................. 5
BASIC CABINET CONSTRUCTION ..................................................................... 6
WALL CONFIGURATIONS ............................................................................. 6
PREASSEMBLED CABINETS .............................................................................. 8
POSITION CABINET ................................................................................... 8
FLOOR ................................................................................................. 8
FLOOR BRACKETS .................................................................................... 9
ELECTRICAL SUPPLY CONNECTION ................................................................ 10
FINAL CHECKS ....................................................................................... 11
UNASSEMBLED CABINETS .............................................................................. 12
WALL PANEL ......................................................................................... 12
CEILING PANELS ..................................................................................... 12
FLOOR ............................................................................................... 12
FLOOR BRACKETS ................................................................................... 13
AIR DUCT ASSEMBLY ................................................................................ 14
DRAIN ................................................................................................ 16
AIR INTAKE COVER .................................................................................. 17
GUIDE RAIL .......................................................................................... 17
DOOR HANDLE ....................................................................................... 18
DOOR HINGES ....................................................................................... 18
DOOR MAGNET ...................................................................................... 20
DOOR SWEEP ........................................................................................ 20
COMPONENT & JUNCTION BOX ..................................................................... 20
HUMIDITY/TEMPERATURE SENSOR ................................................................. 22
VENT ................................................................................................. 22
WATER SUPPLY LINE CONNECTION ................................................................ 23
TRIM PANELS ........................................................................................ 24
CONTROLLER TO COMPONENT BOX CONNECTION ................................................ 24
ELECTRICAL SUPPLY CONNECTION ................................................................ 26
FINAL CHECKS ....................................................................................... 28
APPENDIX ................................................................................................ 29
APPENDIX 1 - WATER SUPPLY FITTING CONNECTIONS ............................................ 29
APPENDIX 2 - WATER DRAIN SYSTEM FITTING CONNECTIONS .................................... 32
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS
© BAXTER 2023
F45568 Rev. D (0923) Page 2 of 35
SERVICE UPDATES
SERVICE UPDATES
September 2023
Updated DOOR HINGES.
Added APPENDIX 1 - Water Supply Fitting
Connections.
Added APPENDIX 2 - Water Drain System Fitting
Connections.
October 2020
Updated ELECTRICAL SUPPLY
CONNECTION under PREASSEMBLED
CABINETS.
Updated ELECTRICAL SUPPLY
CONNECTION under UNASSEMBLED
CABINETS.
March 2020
Updated TOOLS.
January 2020
Updated LOCATION.
Updated AIR DUCT ASSEMBLY.
Updated DRAIN.
Updated COMPONENT & JUNCTION BOX.
Updated WATER SUPPLY LINE
CONNECTION.
June 2019
Updated ELECTRICAL SUPPLY
CONNECTION under PREASSEMBLED
CABINETS.
Updated ELECTRICAL SUPPLY
CONNECTION under UNASSEMBLED
CABINETS.
November 2017
Updated LOCATION.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - SERVICE UPDATES
Page 3 of 35 F45568 Rev. D (0923)
GENERAL
INTRODUCTION
These instructions are for Baxter DPC1S
dehumidifying proofer. The DPC1S 40.5 inch deep
cabinet can be shipped assembled requiring minimal
field assembly. This cabinet can also be shipped
unassembled requiring field assembly. Both shipping
methods will require leveling and connection to
utilities. All utility connections are the responsibility of
the customer. All information, illustrations and
specifications contained in this manual are based on
the latest product information available at the time
indicated on the cover of the manual. Retain these
instructions for future reference.
UNPACKING
Remove crating from cabinet and check for possible
shipping damage. If cabinet is found to be damaged
after un-crating, save packaging material and contact
the carrier within 15 days of delivery. If location has
multiple cabinets, keep serial numbered crates
together. Check contents against packing list with
shipment. Refer to hardware list for identifying
hardware usage.
LOCATION
• Flooring:
Level floor within 1/8" per foot up to 3/4" in
all directions.
NOTE: For units supplied without a cabinet floor, the
equipment is to be installed on flooring materials that
are corrosion resistant and cleanable. Flooring
materials meeting these requirements may include
masonry materials. If a floor drain is located inside the
proofer, any exposed hardware should be constructed
of non-ferrous material.
Drain connection:
1/2" FNPT (Female National Pipe Thread)
rear or front drain connection at 5" above
finished floor, route to air gap drain.
Water connection:
Water and waste piping and connections
shall comply with the International Plumbing
Code 2003, International Code Council
(ICC), or to the Uniform Plumbing Code
2003, International Association of Plumbing
and Mechanical Officials (IAPMO).
NOTE: Plumbing connections must comply with
applicable sanitary, safety and plumbing codes and
provide adequate backflow protection to comply with
applicable federal, state and local codes.
3/4" MGHT (Male Garden Hose
Thread) water line connection at 95"
above finished floor. Connection to
solenoid requires 3/4" FGHT (Female
Garden Hose Thread); 3/4" FGHT - to
- 1/2" FNPT adaptor is provided.
30-80 psi flow.
Cold water.
Water Quality:
Hardness 2-4 GPG. pH 7.0 to 8.0.
Chloride concentration 0-30ppm.
Sediment <.5 micron.
Turbidity <.5NTU.
Total dissolved solids <400ppm.
The electrical diagram is located on the cover of
the component box. Cabinets require a single
phase or three phase 208-240 volt electrical
connection. Neutral wire circuitry needed to
provide 110-120 volt for miscellaneous control
components. A separate 110-120 volt line may
be run or a transformer option will be required if
110-120 volt is not available. Consult Bakery
Product Support for 110-120 volt line or
transformer option requirements.
Single Phase (L1, L2, Neutral, Ground).
Three Phase (L1, L2, L3, Neutral, Ground).
CLEARANCE DIMENSIONS
Cabinets UL/CSA Listed for 0" clearance for back and
side walls.
A 2" to 4" back clearance is recommended when
plumbing rear drain connection.
Top of cabinet requires a minimum of 24" clearance
for servicing accessibility.
Side wall(s) require a minimum of 1" clearance for
better performance if the DPC1S cabinet is installed
next to an oven.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - GENERAL
F45568 Rev. D (0923) Page 4 of 35
TOOLS
Standard Tools
Standard set of hand tools.
VOM with AC current tester.
Special Tools
Hammer drill 1/2" Grainger No. 3TB72 to drill
holes in floor for anchor bolts.
3/8" masonry drill bit to drill holes in floor for
anchor bolts.
Setting tool Part No. 01-1000V4-73A to set drop-
in anchors in facility floor (no longer supplied
with proofer hardware as of 4/1/2020).
Tile Trowel (square notch) Grainger No. 5LG06.
Roller Tool (Laminate J Roller) - for completing
seal of floor trim to wall.
7/32" hex socket 3/8" drive Grainger No. 3LB97.
5/16" hex key 6" long Grainger No. 4RE58 to lock
cam locks.
Handheld, digital temperature and humidity
sensor Grainger No. 13G532 Extech SDL500 or
Grainger No. 4FKP4 THWD-5.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - GENERAL
Page 5 of 35 F45568 Rev. D (0923)
BASIC CABINET CONSTRUCTION
Fig. 1
WALL CONFIGURATIONS
The right side wall will always be the solid wall. The
left side wall will contain the proofing system.
DPC1S Cabinet Width = 42.00"
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - GENERAL
F45568 Rev. D (0923) Page 6 of 35
Fig. 2
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - GENERAL
Page 7 of 35 F45568 Rev. D (0923)
PREASSEMBLED CABINETS
Cabinet can be shipped assembled. You may want to remove door(s) prior to maneuvering cabinet into place. Each
cabinet is shipped with the individual parts needed for on-site assembly, along with a packing list. Before installing
cabinet, compare parts to packing list to ensure all parts were received. Wait as long as possible before removing
plastic protective covering from panels. Apply silicone between floor and wall angle or floor and base channel seams.
Leave no voids.
POSITION CABINET
NOTE: If cabinet rear drain is not accessible from the
back when in final location, route the proofer drain
outside of the cabinet to the facility drain before setting
proofer in final location.
1. Position cabinet near the final location.
2. Determine if the drain must be routed out the
back or front of the unit.
NOTE: If the drain is not accessible with the unit in
the final location, install drain prior to moving unit into
final location.
3. Position cabinet in final location and level.
NOTE: If necessary, place shims under walls to level
cabinet.
FLOOR
1. Install rear corner brackets at both rear corners
of cabinet.
NOTE: Place a spot of silicone on back side of
brackets to aid in holding brackets into position.
Fig. 3
2. Install front corner brackets at bottom of door
jambs.
NOTE: Place a spot of silicone on back side of
brackets to aid in holding brackets into position.
Fig. 4
3. (Cabinet No Floor option only) Check walls for
squareness and Install floor angels.
NOTE: Do not use floor angles on cabinets with floor.
Fig. 5
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - PREASSEMBLED
CABINETS
F45568 Rev. D (0923) Page 8 of 35
4. Apply adhesive to bottom of floor and spread
evenly with a trowel. Cover entire floor surface
with adhesive
Fig. 6
5. Place cabinet floor in final position.
NOTE: Position cabinet floor such that side flange is
behind air duct.
Fig. 7
NOTE: Floor brackets may need to be removed to
position the floor in place.
6. Anchor cabinet floor to facility floor.
7. Check cabinet for being level. If necessary, place
shims under cabinet walls to level.
8. Install door jamb mounting brackets to front
cabinet corners and secure to facility floor.
NOTE: If mounting bracket holes do not line up with
clearance holes in floor, drill new clearance holes.
Fig. 8
FLOOR BRACKETS
1. Install floor brackets to cabinet walls.
NOTE: Ensure front and rear corner brackets are in
the gap between cabinet floor and wall.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - PREASSEMBLED
CABINETS
Page 9 of 35 F45568 Rev. D (0923)
Fig. 10
2. Apply silicone to front and rear corner brackets,
and position them at cabinet floor and wall
panels.
NOTE: Use one floor bracket for each side wall and
one for the rear wall.
3. Install door jamb mounting brackets to front
cabinet corners and secure to facility floor.
NOTE: If mounting bracket holes do not line up with
clearance holes in floor, drill new clearance holes.
4. If door removed earlier, install door onto door
hinges.
Fig. 11
5. Install outer floor trim, remove film covering from
double sided tape and seal trim to wall. Use roller
tool to complete seal to wall.
NOTE: Remove outer protective plastic after outer
floor trim is installed.
NOTE: Before installing outer floor trim, clean outer
wall surface with degreaser.
6. Apply silicone to front corner floor trim at top and
bottom seams.
7. Secure front edge of cabinet floor to facility floor.
8. Install air duct assembly onto cabinet.
ELECTRICAL SUPPLY
CONNECTION
Disconnect the electrical power to
the machine and follow lockout /
tagout procedures. There may be
multiple circuits. Be sure all circuits
are disconnected.
1. Connect electrical supply per the wiring diagram
on the component box cover or back side of lower
front trim, ensuring the neutral wire is
connected at terminal #3 on terminal strip
(Fig. 13 , Fig. 14).
Energizing power supply without a neutral
connection could result in damage to circuit
board.
NOTE: Damage resulting from failure to confirm
neutral connection prior to energizing the equipment
will not be covered under warranty.
NOTE: If 208-240 volt electrical supply does not have
a neutral, a step-down transformer can be installed
(see Fig. 12). Step down transformer must be installed
into a leak tight housing supplied by customer.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - PREASSEMBLED
CABINETS
F45568 Rev. D (0923) Page 10 of 35
Fig. 12
Fig. 13
Fig. 14
FINAL CHECKS
1. Remove all remaining protective plastic.
2. Install plug buttons in unused holes i.e. wall and
ceiling panels.
3. Ensure all holes with wiring / tubing through wall
and ceiling panels are filled with silicone.
4. Test for proper operation.
NOTE: The fans of each proofing system will run
continuously for 20 minutes after power has been shut
off at the controller.
5. Calibrate cabinet for temperature and humidity
following instructions supplied.
6. Complete Installation Checklist and distribute
copies per instructions on checklist.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - PREASSEMBLED
CABINETS
Page 11 of 35 F45568 Rev. D (0923)
UNASSEMBLED CABINETS
WALL PANEL
Refer to WALL CONFIGURATIONS for sequence of
wall panel assembly. As walls are added, ensure
panel seals are on opposite sides.
1. Start with left rear corner at final position on
facilities floor.
NOTE: Both rear corner panels should be positioned
with the cam locks at the top.
NOTE: Turn top cam Clockwise and bottom cam
Counter Clockwise to lock.
2. Attach adjacent rear wall panel and left wall panel
to left rear corner and lock in place.
3. Follow WALL CONFIGURATIONS to assemble
remaining panels.
Fig. 15
CEILING PANELS
1. Start with rear ceiling panel with the square vent
hole in it.
2. Position rear ceiling such that vent hole on left
side of unit. Align edges of ceiling panel with rear
wall and lock into place.
Fig. 16
3. Secure rear ceiling panel to side walls with cam
locks.
NOTE: All cam locks on ceiling panels turn clockwise
except cam locks on front corner panels.
4. When placing front ceiling panel lock ceiling
panels together and then lock to side walls.
FLOOR
1. Install rear corner brackets at both rear corners
of cabinet.
NOTE: Place a spot of silicone on back side of
brackets to aid in holding brackets into position.
Fig. 17
2. Install front corner brackets at bottom of door
jambs.
NOTE: Place a spot of silicone on back side of
brackets to aid in holding brackets into position.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - UNASSEMBLED CABINETS
F45568 Rev. D (0923) Page 12 of 35
Fig. 18
3. (Cabinet No Floor option only) Check walls for
squareness and Install floor angles.
NOTE: Do not use floor angles on cabinets with floor.
Fig. 19
4. Apply adhesive to bottom of floor and spread
evenly with a trowel. Cover entire floor surface
with adhesive.
Fig. 20
5. Place cabinet floor in final position.
A. Position left hand side flange of single piece
cabinet floor such that side flange is behind
air duct.
Fig. 21
6. Anchor cabinet floor to facility floor.
7. Check proofer for being level. If necessary, place
shims under cabinet walls to level.
FLOOR BRACKETS
1. Install floor brackets to cabinet walls.
NOTE: Ensure front and rear corner brackets are in
the gap between cabinet floor and wall.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - UNASSEMBLED CABINETS
Page 13 of 35 F45568 Rev. D (0923)
Fig. 23
2. Apply silicone to front and rear corner brackets,
and position them at cabinet floor and wall
panels.
NOTE: Use one floor bracket for each side wall and
one for the rear wall.
3. Install door jamb mounting brackets to front
cabinet corners and secure to facility floor.
NOTE: If mounting bracket holes do not line up with
clearance holes in floor, drill new clearance holes.
4. If door removed earlier, install door onto door
hinges.
Fig. 24
5. Install outer floor trim, remove film covering from
double sided tape and seal trim to wall. Use roller
tool to complete seal to wall.
NOTE: Remove outer protective plastic after outer
floor trim is installed.
NOTE: Before installing outer floor trim, clean outer
wall surface with degreaser.
6. Apply silicone to front corner floor trim at top and
bottom seams.
7. Secure front edge of cabinet floor to facility floor.
8. Install air duct assembly onto cabinet.
AIR DUCT ASSEMBLY
1. Install plug buttons into unused holes that would
be behind air duct assembly.
2. Install grommets into routing holes in ceiling
panel.
NOTE: Insert in top and bottom of ceiling panel.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - UNASSEMBLED CABINETS
F45568 Rev. D (0923) Page 14 of 35
Fig. 25
3. Remove air intake cover from air duct assembly.
4. Install air duct bolts loosely into nutserts in ceiling
panel.
5. Hang air duct assembly onto bolts using key
holes in air duct assembly.
NOTE: Do not fully tighten bolts into ceiling panel.
6. Secure air duct assembly to wall panel (4 places)
and tighten ceiling bolts.
Fig. 26
NOTE: Insulation may need to be cleaned out of holes
so heater wires can be routed through.
7.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - UNASSEMBLED CABINETS
Page 15 of 35 F45568 Rev. D (0923)
Route heater, fan, and high limit lead wires
through appropriate access hole in ceiling. Install
a 40-inch long, 1/4" diameter piece of poly tubing
from spray nozzle, out through an access hole in
ceiling. There will be a grommet around both the
inner and outer skin access holes.
8. Install water line from solenoid to spray nozzle
using shallow radius bends.
Do not kink the water line.
NOTE: After all water lines and wiring are run up
through access holes, fill access holes with silicone to
prevent moisture from escaping the cavity.
NOTE: Fitting on spray nozzle is a self-locking push-
in type.
DRAIN
NOTE: See APPENDIX 2 - Water Drain System
Fitting Connections for detailed push-to-connect
instructions.
1. Remove knock-out from front or back of duct for
drain line, depending on drain line orientation.
2. Install drain tube with elbow from outside of
cabinet through hole in rear or front wall -
depending on location of facilities drain - then
through cover plate (2, Fig. 27) and side of duct.
NOTE: Insulation may need to be cleaned out of wall
hole so drain tube can be routed through.
Fig. 27
3. Connect Push-to-Connect (PTC) coupler (1, Fig.
28) to drain pan tube.
4. Insert 5" tube (2, Fig. 28) into coupler.
5. Attach PTC elbow (3, Fig. 28) to other end of 5"
tube.
6. Connect drain tube with pre-attached elbow (4,
Fig. 28) into PTC elbow.
Fig. 28
NOTE: Drain tube with elbow assembly may need to
be shortened to limit amount of drain line extending
outside the unit.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - UNASSEMBLED CABINETS
F45568 Rev. D (0923) Page 16 of 35
NOTE: Position drain tube and all fittings so that drain
slopes away from duct with a minimum of 1/4" slope
per foot.
7. Tighten all fittings, and check for leaks and
proper draining.
8. Use two metal screws (1, Fig. 27) to secure drain
line with drain cover plate (2, Fig. 27) to side of
air duct.
9. Use silicone to fill the hole in the cabinet where
the drain tube exits.
Fig. 29
AIR INTAKE COVER
1. Install air intake cover onto air duct assembly. Air
intake cover fits over air duct assembly.
2. Secure cover with 16 screws.
Fig. 30
GUIDE RAIL
1. Remove the necessary protective plastic.
2. Install rear guide rail to rear wall.
3. Install left and right guide rail(s) to rear guide rail
and wall(s).
NOTE: Right and left guide rails have slotted holes
for proper fitting.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - UNASSEMBLED CABINETS
Page 17 of 35 F45568 Rev. D (0923)
Fig. 31
Fig. 32
DOOR HANDLE
1. Remove the necessary protective plastic.
2. Install mounting screws through bumper.
3. Attach bumper to inside of door.
4. Using same screws, attach handle to front of
door.
Fig. 33
DOOR HINGES
Failure to follow this updated procedure may cause
irreparable damage to the front corner panels, making
them unusable. Following this procedure will retain the
backer plates within the corners, and not allow them
to possibly separate inside the corners.
NOTE: On double door units, the door with the control
opening will mount to the left side.
NOTE: Use Red High strength thread locker on all
hinge bolts.
NOTE: Torque all hinge bolts to 90 in-lbs or ft-lbs.
First Time Install Of Hinges
NOTE: Single door units can be hinged from either
corner panel to obtain door swing required.
1. Remove upper hinge bolts from upper and lower
hinge locations in the desired front corner
section.
2. Apply thread locker to both bolts and loosely
secure female halves of hinges to both hinge
locations.
3. Remove both lower hinge bolts from corner.
4. Rotate hinges to a vertical position.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - UNASSEMBLED CABINETS
F45568 Rev. D (0923) Page 18 of 35
Fig. 34
5. Apply thread locker to bolts and reinstall through
hinge.
6. Secure hinges by tightening all 4 hinge bolts.
7. Repeat process, if necessary, for opposite front
corner if the unit has two loading doors.
NOTE: Ensure bushings (Fig. 35) are installed in
female halves of hinges.
Fig. 35
Door Hinge Mounting
1. Remove upper hinge bolts from hinge locations
at top and bottom of door.
2. Apply thread locker to both bolts and loosely
secure male halves of hinges to both hinge
locations.
NOTE: Be sure to position male half of hinge with post
positioned downward (Fig. 36).
3. Remove both lower hinge bolts.
4. Rotate hinges to a vertical position.
5. Apply thread locker to bolts and reinstall through
hinge.
6. Secure hinges by tightening all 4 hinge bolts.
7. Repeat process, if necessary, for other loading
door if the unit has two loading doors.
Fig. 36
8. Remove unused hinging screws provided for
alternate door swing from opposite front corner
panel, and replace with plug buttons provided in
the unit assembly hardware package.
NOTE: Do not stand door up on door seal at any time.
9. Install plug buttons into hex sockets of all flat-
head hinge bolts in loading doors and front corner
panels.
NOTE: If button-head screws were removed from the
loading door to reverse hinging on single door unit, fill
socket in button-head screws with silicone caulk and
wipe smooth.
NOTE: Before installing plug buttons apply a dab of
silicone on back side of plug buttons.
10. Install door onto cabinet.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - UNASSEMBLED CABINETS
Page 19 of 35 F45568 Rev. D (0923)
DOOR MAGNET
1. Install magnet assembly to top of door.
Fig. 37
DOOR SWEEP
1. Remove rubber door sweep from bottom of door
sweep bracket by removing seven nuts & bolts.
Fig. 38
2. Replace rubber door sweep.
3. Evenly align rubber door sweep to bottom of door
sweep bracket.
4. Secure rubber door sweep to bottom of door
sweep bracket using seven nuts and bolts.
NOTE: Holes on door are elongated in order to
properly adjust placement of door sweep.
Fig. 39
COMPONENT & JUNCTION BOX
1. Install the component box assembly to top of
ceiling panel at front of cabinet.
Fig. 40
2. Verify grommets installed into wire holes in
ceiling panel above air duct.
3. Install junction box with self drilling screws.
DPC1S DEHUMIDIFYING PROOFING CABINET INSTALLATION INSTRUCTIONS - UNASSEMBLED CABINETS
F45568 Rev. D (0923) Page 20 of 35
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35

Baxter DPC1S Proofer Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI