APEC Booster Pumped R.O. SYSTEM:
Installation Addendum
How to install your RO-PUMP system:
The steps for installing the Booster Pumped RO system is the same as the included manual.
Please follow the direction in the Installation Manual from pages 1-12.
When you get to Step 6: “Connecting The System” in the manual (page 13), please use
this Addendum for “Summary of Tubing Connections”. Once tubing connections are
completed, proceed to page 14 - “Details on Tubing Connections”.
Step 6: Connecting The System
There are 4 connections:
Point A to X: Connect RO to COLD water supply — Red tubing.
Point G to Y: Connect product water from 5
th
-stage filter to tank — Yellow tubing*.
Point H to Z: Connect product water from 5
th
-stage output to dispensing faucet — Clear tubing.
Drain line to W: Connect waste water from 4
th
-stage membrane to the drain pipe — Black tubing.
* Note: The Yellow tubing is a 2-way line. Product water enters and leaves the tank via this
same line.
1
free drinking water.com