MCE Element Hydro 42-QR-1P26 B3 Quick start guide

  • Hello! I am an AI chatbot trained to assist you with the MCE Element Hydro 42-QR-1P26 B3 Quick start guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1. Review job prints.
2. Connect grounding lug (NEC Article 250).
3. Connect AC power, motor, and valves.
1. On the SCE-CPU and SCE-HVI boards
unplug the five connectors pictured to
the left.
2. Use MCE jumper assembly CPU-
CONSTR-JPR-HY to replace the three
SCE-CPU and the top SCE-HVI con-
nectors (wired as shown).
3. Use MCE jumper assembly HVI-
CONSTR-JPR-HY to replace the GOV/
SAFH/.. connector (wired SAFC to 2).
STEP 1: POWER CONNECTIONS.
STEP 2: CONSTRUCTION OPERATION ON MACHINE ROOM INSPECTION. STEP 3: CONSTRUCTION OPERATION ON CARTOP INSPECTION.
42-QR-1P26 B3
© Motion Control Engineering. www.mceinc.com. 916 463 9200.
Low power or signal wires
must always be in
separate conduit from high
power/current wires.
Ground
Three phase
building supply
SEE JOB PRINTS FOR MOTOR & VALVE CONNECTIONS
4. On the SCE-CPU board, INSP, CAR
DOOR BYPASS, HOISTWAY DOOR
BYPASS all UP. FLT BYPASS jumper
in BYPASS position.
Run Enable
Run Up
Insp
Norm
Run Down
EMERGENCY STOP
SCE-CPU
SCE-HVI
* Remove jumper wire when connecting switch.
THIS INSTRUCTION WILL HELP YOU GET THE ELEMENT HYDRAULIC CONTROLLER RUNNING ON CONSTRUCTION OPERATION
SCE-UPD
SCE-UPD
TEMPORARY RUN BOX
CTEN
INCP
ICTU
ICTD
INCT*
GOV
SAFH
SAFC*
ESC
1
2
2
2LS
2LS
DLN2
DLN1
GOS2
GOS1
24HWY
24FS
24CTP
1
1
1
SCE-CPU
SCE-HVI
CPU-CONSTR HVI-CONSTR
RGOK
+24V
L24V
1
FRA
FRS
FRSA
FRSM
CTEN
INCP
ICTU
ICTD
INCT
INA
ATU
ATD
ABU
ABD
UTL
USL1
USL2
DTL
DSL1
DSL2
UETS
DETS
GOV
SAFH
SAFC
ESC
2
If your job has optional features like emergency power or an oil
pressure input, wire them or add jumpers before you run. See
your job prints and/or the SYSTEM IO/Programmed Inputs
menu to verify additional inputs.
From To
+24V INCP
INCT
INA
RGOK
UTL
USL1
USL2
DTL
DSL1
From To
2 SAFC
5. Power up. Verify UTILS, Construct &
Bypass Faults enabled. Verify Home
screen indicates BP CONSTRUCTION.
REMOVE temporary jumpers before connecting
actual equipment. Otherwise, circuit boards will
be damaged (not covered by warranty).
ALL
jumpers must be removed before the car is
released to passenger operation.
for Construction Operation
/