Danfoss ECL 2000 User guide

  • Hello! I am an AI chatbot trained to assist you with the Danfoss ECL 2000 User guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Application Sheet
Lit. No.
VY7FC102
Date:
2000-02-04
ECL2000/Comfort - LON Network Bus Topology
ECL 2000
Terminator
LON
Heat Meter
Terminator
ECL Comfort 200/300
Main station
The FTT system (Free Type Topology) is
also designed to support bus topology wir-
ing. FTT-10 transceivers can be located at
any point along the network wiring. High ca-
pability simplifies system installation and
makes it easy to add nodes should the sys-
tem need to be expanded.
For the ECL 2000 the TP/XF-78 transceiver
is available as a lower price solution.
Limitations:
Maximum total cable length FTT 10-A:
2700 m.
Maximum total cable length TP/XF-78:
1400 m.
Maximum length of cable from “bus” to
equipment 3 m.
Requires 2 and only 2 terminators, con-
nected at the ends of the bus.
If the cable length exceeds 2700 m (FTT
10-A) / 1400 m (TP-XF-78), a physical re-
peater (maximum one) or a logical router
has to be connected every 2700/1400 me-
ters of the cable.
What do I need?
2 network terminators
If bindings between ECL 2000/Comfort, Heat Meter, etc. are desired or visualisation possibili-
ties of data from the network:
PC (Laptop)
Interface between LON network and the PC
Binding tool
Visualisation software incl. Drivers
/