Installation Instructions
Step-by-Step Installation Sequence
11/18/2021 Copyright 2021 ANOVA® Manufactured in the U.S.
Note: Please contact Customer Care at 1-866-797-1761 when ordering replacement parts.
2.
1.
7. Check the concrete manufacturer's specications to see how long the
concrete needs to dry before proceeding to attach the remaining parts. Once
the concrete has properly set you may proceed with the assembly.
3.
4.
5.
6.
Using a shovel place approximately six inches of gravel into the hole then
tamp it down with a 2" x 4". Repeat this step one more time so there is a total
of 6" of gravel.
Place the post in the center of the hole. It should go down 24" for a 4' post or
36" for an 8' post. It is necessary to set up a couple of braces to ensure the
proper height and that the post is level.
To do so hammer a couple of wood posts into the ground using a sledge
hammer and screw another post to each post using a drill. Then use clamps to
brace the posts together.
NOTE: When bracing the post in place you should constantly be checking it
with a level to ensure that it set properly.
NOTE: When digging the hole it is recommended that it has a slight angle and
increases in size the farther down it goes. This helps prevent frost upheaval.
Mix the concrete in a wheel barrel to the manufacturer's specications.
NOTE: Check with a local contractor for the best option on how to pour
the concrete. Images 6.1 and 6.2 show two standard practices, but we still
recommend seeking out a local contractor.
Pour the concrete based on your local recommendation.
Dig out the holes for the posts using a post hole digger and a digging iron. The
distance between holes should be determined by the size of panel being used
and should be a minimum of 6" diameter hole. The depth of the hole should
be below the frost line to prevent shiing.
Stake out the outline of the area of where the fencing is going to be installed
and attach string to the outer stakes to ensure the holes are dug along the
correct path.
2 3
CAUTION: Call your local utility companies to mark where there are any
cables or pipelines before digging any holes.
Frost Line
1
4
6.1 6.2