Classic Exhibits VK-1970 Setup Instructions

Type
Setup Instructions
© 2017
Order #XXXXX
SETUP INSTRUCTIONS
If you would like to tell us about your experience with your setup instructions please email us at [email protected]
VK-1970 Supernova General Layout
Plan View
10’
10’
Scale: 18
© 2017
Order #XXXXX
DO NOT USE POWER TOOLS
ALL CONNECTIONS MUST
BE TIGHTLY SECURED
Part Identification - Numbering
Spline Connection Base Plate & Extrusion Connection
General Setup Instructions
- Read entire setup instruction manual prior to
unpacking parts and pieces.
- The setup instructions are created specifically
for this configuration.
- Setup instructions are laid out sequentially in
steps, including exploded views with detailed
explanation for assembly.
WARNING
Cleaning & Packing
- For Cleaning Metal, Plex, & Laminate Parts:
Use a MILD NON-ABRASIVE cleanser and
soft cloth/paper towel to clean all surfaces.
- Keep exhibit components away from heat
and prolonged sun exposure.
Heat and UV exposure will warp and
fade components.
- Retain all provided Packing Materials.
All provided packing materials are for
ease of repacking & component protection.
Disassembly
- For loss prevention, tighten all setscrews
and locks during disassembly
7A
Hex Tool - Essential for Assembly
Extrusion & Lock Connection Engaged Lock
LADDERS OR LIFTS
MAY BE REQUIRED
General Information
© 2017
Order #XXXXX SEG Graphic Installation
Graphic Removal
To remove the graphic from
the frame, locate the fabric
pull tab. Gently pull up on the
tab to remove the fabric.
Step 1
Insert corner A. Turn edge of
graphic so silicon welt is
perpendicular to face of
graphic. Insert narrow side
of welt with fabric to outside
into the channel. Repeat for
other side of this corner.
Step 2
Repeat Step 1 for opposite
corner C, then insert corner
B, followed by corner D, to
complete the installation of
the corners.
Step 3
Once all corners are inserted,
press one silicon edge into
channel from corners and
work toward the center.
Make sure welt is fully inserted
into channel. Continue until
all sides are done. Smooth
out edges of graphic.
It is important to first insert
graphic into each alternate
corner then to the sides of
the frame. If this is not done,
graphic will not fit into the
frame correctly.
Corner A
Corner D
Corner B
Corner C
© 2017
Order #XXXXX CEI-110 Frames Assembly
CEI-110 Profile
Straight Connection
Corner Connection
TS RV 4
Bracket
Insert Bracket
into the Interior
Center Slot
of extrusion.
Slide connecting
extrusion over
exposed end
of bracket.
Secure extrusion
using remaining
set screws.
Set
Screw
CEI-110 Frames Assembly
Disassembly
1) Loosen set screws on brackets, then slide
extrusions off of brackets.
Straight Bracket Installation (when required)
1) Slide TWO-PIECE TS RV 4 straight bracket into
Interior Center Slot of extrusion so that two of the
set screws are inside groove.
Tighten two set screws to secure.
2) Slide connecting extrusion over exposed end
of bracket. Tighten two remaining set screws
to secure.
Corner Bracket Installation
1) Slide TWO-PIECE TS RV 2 L-bracket into
Interior Center Slot of extrusion so that two
set screws are inside groove.
Tighten two set screws to secure.
2) Slide one A1 L-Bracket into outer interior
grooves of upper and lower horizontals.
Tighten set screws to secure.
3) Slide vertical extrusion over exposed ends
of brackets in lower horizontal.
Tighten set screws to secure.
4) Slide exposed ends of installed brackets of
upper horizontal into open ends of verticals.
Tighten set screws to secure.
TS RV 2
Upper
Horizontal
Lower
Horizontal
Upper
Horizontal
Lower
Horizontal
TS RV 2
8 Brackets Total:
(4) - TS RV 4
(4) - A1 L-Brackets
A1
A1
Slide verticals over
brackets of lower
horizontal, then slide
upper horizontal &
brackets into grooves
& center slots
of verticals.
Completed
Assembly
Insert L-Brackets into the
Interior Center Slot & outer
interior grooves of extrusion.
Completed
Assembly
Secure inserted half
of bracket, using
set screws.
© 2017
Order #XXXXX
Case 1 of 3
Case Packing
2 4 4A2A 3 5
6,7
8,8
8A,8A
9
6A,7A
5A3A
Top View of Each Level
Level 1 Level 2 Level 3
Base
Plates
Graphic
Setup Hardware
© 2017
Order #XXXXX
Case 2 of 3
Case Packing
Counter Top
Door
1
Blocker Fabric
Top View of Each Level
Level 1 Level 2 Level 3 Level 4
1A 2 2A
Door
© 2017
Order #XXXXX
Case 3 of 3
Case Packing
Assembled
Counter
Side
Assembled
Counter
Side
Top View of Each Level
Level 1 Level 2 Level 3 Level 4
Shelf
Shelf
8
5
8A
Shelf
© 2017
Order #XXXXX
Step 1 of 4
VK-1969 Backwall Assembly
12
5
6
5A
4A
4
6A
3
2A
3A
1
Completed Assembly
Item
1
2/2A
3/3A
4/4A
5/5A
6/6A
Qty.
2
1/1
1/1
1/1
1/1
1/1
Description
Base Plate
46” CEI-110 Horizontal Extrusion
46” CEI-110 Horizontal Extrusion
46” CEI-110 Horizontal Extrusion
46” CEI-110 Horizontal Extrusion
40” S44 Vertical Extrusion
Steps:
1) Attach base plates [1] to vertical extrusions [2] and [3],
using bolts.
2) Assemble CEI-110 extrusions [2 thru 5A] as shown.
See CEI-110 Frames Assembly sheet for instruction.
3) Attach vertical extrusions [6] to [4] and [6A] to [5],
using bolts.
4) Connect Lights and Transformers, then route cords thru
horizontal [2] and connect to power. See Light to Light
Connection and Light to Transformer Connection details.
5) Install SEG graphic to front and blocker fabric to
back of assembled Backwall. See SEG Graphic
Installation page for instruction.
to power
to power
Lighting Instalation Warning
Bolt Nylon
Washer
If utilizing your own hardware,
purchase Nylon Washers to prevent
metal screw heads from damaging
the circuit board. Attach no more
than seven lights per chain.
Diamond
Washer
Power Break
Power Break
to power
++
+
-
-
-
to power
Lights
Male
Male
Female
Female
144W - 6A
Transformer
Light to Light Connection
Light to Transformer Connection
© 2017
Order #XXXXX
Step 2 of 4
7
8
8
9
9
9
9
4
5
8A
8A
Shelf
Shelf
Bolt
Bolt
7A
Completed Assembly
Item
7/7A
8/8A
9
Qty.
1/1
1/1
1
Description
40” S44 Vertical Extrusion
12” Z32 Horizontal Extrusion
8” Z32 Horizontal Extrusion
Steps:
1) Attach horizontal extrusions [8] and [8A] to vertical extrusions [7] and [7A],
making sure tops of [8A] are at tops of [7] and [7A].
2) Attach extrusions [8] and [8A] to Backwall vertical extrusions [4] and [5].
3) Connect vertical extrusions [7] and [7A] to base plate, using bolts.
4) Attach horizontal extursions [9] to each side of extrusions
[7] and [7A], making sure tops of [9] are level with tops of [7] and [7A].
5) Connect Shelf to Velcro on tops of extrusions [8A] and [9].
VK-1969 Backwall Attachments
© 2017
Order #XXXXX
Step 3 of 4
MOD-1700 Counter Assembly
*
1
1A
2
2A
78
8
8A
8A
7
Shelf
Support
7A
3
3A
4
5
6
Door
Door
Infill
Infill
CEI-110 Frame Assembly
Item
1/1A
2/2A
3/3A
4
5
6
7/7A
8/8A
Qty.
1/1
1/1
1/1
1
1
1
2/2
2/2
Description
46.25” CEI-110 Horizontal Extrusion
37.5” CEI-110 Vertical Extrusion
37.5” S44 Vertical Extrusion
37.5” S44 Vertical Extrusion w/Door Hinges
37.5” S44 Vertical Extrusion w/Door Stops
37.5” S44 Vertical Extrusion w/Door Hinges
14.153” Z45 Horizontal Extrusion
20.408” Z45 Horizontal Extrusion
Steps:
1) Assemble Frame Extrusions [1,1A,2,2A]. See CEI-110 Frame Assembly page.
2) Connect Lights and Transformer. See Light to Light Connection and
Light to Transformer Connection details.
3) Attach Horizontals [7] & [8] between Verticals [3,3A,4,5,6].
4) Slide Infills between Verticals [3,4] & [3A,6].
5) Connect Doors between Verticals [4,5] & [5,6]. See Door Connection detail.
6) Attach Horizontals [7A] & [8A] between Verticals [3,3A,4,5,6] and on top
of Infills and Doors.
7) Connect Shelf Supports to Velcro on inside of Infills and insert pins to
Verticals [3] [3A] & [5]. See Shelf Pin detail.
7A
Door
Hinge
Hinge
Pin
Slide Pin into
Hinge attached
to Vertical.
Slide Door
Hinge over Pin.
Door Connection
*
*
*
*
*
Transformer
to power
**
Shelf Pin
1) Slide pin into groove
of Vertical Extrusion.
2) Use hex tool to
tighten pin in place.
Pin
*
++
+
-
-
-
to power
Lights
Male
Male
Female
Female
144W - 6A
Light to Light Connection
Light to Transformer Connection
© 2017
Order #XXXXX
Step 4 of 4
MOD-1700 Counter Assembly (Cont’d)
*
Counter Top
Velcro
Light Blocker
Shelf
Align hole with pin Rotate pin. Spring
will push pin into hole.
Counter Top Attachment
12
*
Pin
Hole
*
Steps:
1) Connect Light Blocker to Velcro on interior of assembled Frame.
2) Attach assembled Frame to Verticals [3] & [3A].
See Frame Attachment detail.
3) Install SEG Graphic to front of assembled Frame.
See SEG Graphic Installation detail.
4) Place Shelf inside assembled base on top of pins and supports.
5) Place Counter Top on assembled base, then secure with pins.
See Counter Top Attachment detail.
Graphic Removal
To remove the graphic from
the frame, locate the fabric
pull tab. Gently pull up on the
tab to remove the fabric.
Step 1
Insert corner A. Turn edge of
graphic so silicon welt is
perpendicular to face of
graphic. Insert narrow side
of welt with fabric to outside
into the channel. Repeat for
other side of this corner.
Step 2
Repeat Step 1 for opposite
corner C, then insert corner
B, followed by corner D, to
complete the installation of
the corners.
Step 3
Once all corners are inserted,
press one silicon edge into
channel from corners and
work toward the center.
Make sure welt is fully inserted
into channel. Continue until
all sides are done. Smooth
out edges of graphic.
SEG Graphic Installation
It is important to first insert
graphic into each alternate
corner then to the sides of
the frame. If this is not done,
graphic will not fit into the
frame correctly.
Corner A
Corner D
Corner B
Corner C
Completed MOD-1700
Assembly
SEG Graphic
3
3A
Attach Frame to
Connector on
Vertical Extrusion,
using bolt.
CEI-110 Frame Attachment
Bolt
Connector
*
*
*
*
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11

Classic Exhibits VK-1970 Setup Instructions

Type
Setup Instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI