Deagostini Cutty Sark User guide

  • Hello! I am an AI chatbot trained to assist you with the Deagostini Cutty Sark User guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
7Waterways and plates of the main deck
7Glue and nail the walnut side waterways 30 to the main deck 25, leaving a space of 8mm to the outer edge of the main deck. On the bow, this
distance should be 10mm to allow room to fit the four bow waterways 31 (two on each side) so that they overhang the outside of the main deck
25 by 2mm. Plate the main deck with the basswood battens 33, starting from a plate set amidship (broken red lines). Before covering the hatchways
and the three holes for the masts (broken red line rectangles and circles), mark their exact position so that they can be cut out when the plating is
finished. Sand off the deck’s surface with a fine-grain sandpaper.
7 THE CUTTY SARK: STEP BY STEP
30
8mm
2mm
2mm
10mm
diam. 8mm
diam. 8mm
diam. 6mm
25
25
31
33
33
/