Upper Handle
Fitting
Shift Lever
Chute Directional
Control
778-12098© 2010 31AH97P7
Chute Assembly
Chute Base
Support Tube
Place shift lever into A.
F6 position.
Pivot upper handle B.
into operating
position.
A
B
B
Secure the lower handle, upper A.
handle and support tubes with the
hardware removed earlier.
Tighten the upper B.
handle knobs.
Remove the handle knobs,
washers and carriage bolts from
each side of the lower handle.
A
Place chute assembly
onto chute base
with the two flange
keepers beneath the
lip of the chute base.
Reinstall the flange
keeper removed in
Step 4.
Remove the left flange
keeper, hex nuts and hex
screws from the chute
assembly.
Remove the hairpin A.
clip from the fitting.
Insert the chute directional B.
control rod into the fitting
and re-secure with the
hairpin clip.
A
B
1
4
2
5
3
6
READ AND UNDERSTAND ALL INSTRUCTION, WARNING, AND DANGER LABELS.
PARA INSTRUCCIONES EN ESPAÑOL, REFIÉRASE AL MANUAL DEL OPERADOR.
IMPORTANT: READ OPERATOR'S MANUAL AND ENGINE MANUAL THOROUGHLY
AND FOLLOW THE IMPORTANT SAFE OPERATION PRACTICES BEFORE OPERATING .
Need Help? Call 1-888-TO-HELP-U