301 Fulling Mill Road, Suite G
Middletown, PA 17057
Phone (800) 321-2343 / Fax (717) 702-2546
www.onqlegrand.com
Page 1 of 1
INSTRUCTION/INSTALLATION SHEET
PLC Transceiver Kit
IS-0008 REV. B
©Copyright 2007 by On-Q/Legrand All Rights Reserved.
1. INTRODUCTION
The On-Q/Legrand Power Line Carrier Transceiver Kit, P/N
363438-01, may be used with On-Q’s Home Lighting Controller
or any On-Q HMS Controller to enable the controller to transmit
power line carrier (PLC) signals throughout the home.
The kit (see Figure 1) includes the following:
1 – PLC Interface (Plug-In Cube)
1 – 6P4C Modular Cable (reversed end-to-end)
2. INSTALLATION (see Figure 2)
Step 1: Plug the supplied PLC Plug-In Cube into a 120VAC
outlet in the house.
Step 2: Plug one end of the supplied modular cable into the
Plug-In Cube and the other end into the X-10 jack on the
appropriate controller.
Step 3: The LED on the Plug-In Cube should be on and blink off when the Interface receives a signal from the controller or
from any other X-10 source.
3. Warranty
On-Q/Legrand warrants to the end-user, each new switch to be free of defects in materials or workmanship for a period of
one year from the date of original purchase from On-Q/Legrand or its authorized reseller or installer. Each product is
deemed warrantable under conditions of normal use and when installed and operated within On-Q/Legrand specifications
and in accordance with the applicable National Electrical Code and Safety Standards of Underwriters Laboratories. When
determined to be warrantable, On-Q/Legrand shall at its option and expense, replace any defective product with a new or
reconditioned product. On-Q/Legrand will continue to warrant any replaced product for a period of ninety (90) days from
shipment, or through the end of the original warranty period, which ever is longer.
Figure 2
PLC Transceiver
Kit P/N 363438-01
Fi
ure 1