RAB Lighting RDLED2AR8-40YHC-TS Operating instructions

Type
Operating instructions
RDLED2T ND2T WITH TRIM INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
IMPORTANT
READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
RAB xtures must be wired in accordance with the National Electrical Code and all applicable local codes. Proper grounding
is required for safety. THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE BY A
PERSON FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED.
WARNING: Make certain power is OFF before installing or maintaining xture.
RDLED2R RDLED2S
Fig: 1
ROUGHIN MOUNTING FOR ND2T
For both round and square xture, prepare mounting
surface with 2 1/2” diameter cutout.
1. Nailer bars are provided for use with wood joist
installations. Insert through nailer bar slots and secure
accordingly.
2. Buttery brackets provided to use C-Channels.
(optionally available, consult factory). Consult local
building codes for nal support of xture.
3. The xture can be adjusted from 1/2” to 1” max ceiling
thickness. For height adjustment, loosen the Wing Nut
and slide the Buttery Bracket. If necessary remove the
Wing Nut and insert in screw in dierent hole provided
on the Buttery Bracket. (Fig: 1)
4. Adjust both the Buttery Brackets such that the
downturn collar of Rough-In Section is ush with the
nished ceiling surface. Tighten the Wing nuts.
5. Drop down Supply Wire must be atleast 9” long to allow
xture removal.
6. Loosen the Junction Box Screw and open the Junction
Box (Fig.2). Attach Supply Wires into Junction Box and
connect to the xture. See wiring section for details.
7. Push up and slide the Junction Box section into the
ceiling. Be sure the Spring Clips is snapped in and Trim
Ring is ush and secure. Allow the Junction Box section
of housing to rest on the Leg support of the Rough-in
Section.
Buttery Brackets
Nailer Bar
Wing Nut
SURFACE PREPARATION
This xture can be installed with ceiling temperature not exceeding of 40°C and with minimum plenum height of 5.
The xture can be used to replace an existing unit or for new construction.
Cutout must be accurate not undersized or oversized. A hole saw is recommended. CEILING CUT OUT MUST BE FREE
OF ANY DEBRIS AND BURRS.
Downturn Collar
Rough-in
Section
Supply wires
Junction Box
Screw
Junction Box
Leg
Fig: 2
Trim Ring
Spring Clip
WARNING: Suitable for wet locations where the ambient temperature is 0°C minimum, +40°C maximum.
WARNING: Suitable for installation in Non-Accessible and Accessible Ceilings.
WARNING: Suitable for installation in Insulated Ceilings & Non-Insulated Ceilings.
RDLED2T ND2T WITH TRIM INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
REMODELER MOUNTING
For both round and square xture, prepare mounting
surface with 2 3/8” diameter cutout.
1. Install Ceiling Collar into opening. Secure Ceiling Collar
by pushing ngertabs down tightly over ceiling. Fig. (3)
Note: Ceiling Collar is intended for 5/8”-3/4” sheet rock
ceilings. For 1/2” ceiling applications, use 1/8” shim to secure
trim module.
2. Loosen the Junction Box Screw and open the Junction
Box (Fig.2). Attach Supply Wires into Junction Box and
connect to the xture. See wiring section for details.
3. Push up and slide the Junction Box section into the
Ceiling Collar. Be sure the Spring Clips are snapped in
and Trim Ring is ush and secure.
Ceiling
Fig: 3
Remodeler Unit
Fig: 4
Ceiling Collar
5/8” TYP
3/4”MAX
WALLWASH MOUNTING
1. For the Wallwash Model, orient the xture such that
the Reector is aimed in correct orientation. Look for
Towards the Wall’ label on the xture.
2. If necessary, the position of the wall wash reector can be
changed. Unscrew the two Trim Ring screws and remove
the Trim Ring.
3. Remove the Friction Ring, and change the position
of the reector. Note: Square Wall Wash reector can
rotate by 90. Be sure the slot on the Reector is aligned
to slot in Trim Ring.
TROUBLESHOOTING
1. Check that the line voltage at the xture is correct. Refer
to wiring directions.
2. Is the xture grounded properly?
CLEANING & MAINTENANCE
CAUTION: Be sure xture temperature is cool enough to
touch. Do not clean or maintain while xture is energized.
1. Do not open xture to clean the LED. Do not touch
the LED.
2. Do not touch reector, lens or trim cone.
3. Do not clean any xture surface with wood base cleaning
material such as paper towels or tissues.
WIRING
RISK OF FIRE. Compatible with triac drivers at 120V, 50 or
60 Hz. Drop down supply wires must be atleast 9” long to
allow xture removal.
1. Connect the GROUND wire from xture to supply
ground.
2. Connect the black xture lead to the (+) LINE supply lead.
3. Connect the white xture lead to the (-) COMMON supply
lead.
Ceiling Collar
Trim Ring Screws
Square Wall Wash reector
Trim Ring
Friction Ring
Fig: 5
use wood
Shim (if
necessary)
RDLED2T ND2T WITH TRIM INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
Easy Answers
rabweb.com
Visit our website for product info
Tech Help Line
Call our experts - 888 722-1000
e-mail
Answered promptly - sales@rabweb.com
Free Lighting Layouts
Answered online or by request
© 2017 RAB LIGHTING Inc.
Northvale, New Jersey 07647 USA
Ø1-3/8”
3.0”
7.53”
3-1/4”
1-1/4”
3.0X3.0”
DIMENSIONAL DRAWING
RDLED2R
RDLED2S
7.53”
3-1/4”
RDLED2T-IN 01017
RDLED2TL ND2TL WITH TRIMLESS INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
IMPORTANT
READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
RAB xtures must be wired in accordance with the National Electrical Code and all applicable local codes. Proper grounding
is required for safety. THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE BY A
PERSON FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED.
WARNING: Make certain power is OFF before installing or maintaining xture.
RDLED2R RDLED2S
Fig: 1
ROUGHIN & REMODELER
MOUNTING FOR ND2TL
For both round and square xture, prepare mounting
surface with 3-3/16” diameter cutout. Use hole saw only
1. Nailer bars are provided for use with wood joist
installations. Insert through nailer bar slots and secure
accordingly.
2. Buttery brackets provided to use C-Channels.
(optionally available, consult factory). Consult local
building codes for nal support of xture.
3. The xture can be mounted into max 3/4” ceiling
thickness. For height adjustment, loosen the Wing Nut
and slide the Buttery Bracket. If necessary remove the
Wing Nut and insert in screw in dierent hole provided
on the Buttery Bracket. (Fig: 1)
4. Adjust both the Buttery Brackets such that the frame
of Rough-In Section is ush with the nished ceiling
surface. Tighten the Wing nuts.
5. Drop down Supply Wires must be atleast 9” long to
allow xture removal.
6. Loosen the Junction Box Screw and open the Junction
Box (Fig.2). Attach Supply Wires into Junction Box and
connect to the xture. See wiring section for details.
7. Push up and slide the Junction Box section into the
ceiling. Be sure the Spring Clips is snapped in and Trim
Ring is ush and secure. Allow the Junction Box section
of housing to rest on the Leg support of the Rough-in
Section.
Buttery Brackets
Nailer Bar
Wing Nut
SURFACE PREPARATION
This xture can be installed with ceiling temperature not exceeding of 40°C and with minimum plenum height of 5.
The xture can be used to replace an existing unit or for new construction.
For both round and square xture, cutout must be accurate not undersized or oversized. A hole saw is recommended.
CEILING CUT OUT MUST BE FREE OF ANY DEBRIS AND BURRS.
Rough-in
Section
Supply wires
Junction Box
Screw
Junction Box
Leg
Fig: 2
Trim Ring
Spring Clip
WARNING: Suitable for wet locations where the ambient temperature is 0°C minimum, +40°C maximum.
WARNING: Suitable for installation in Non-Accessible and Accessible Ceilings.
WARNING: Suitable for installation in Insulated & Non-Insulated Ceilings.
RDLED2TL ND2TL WITH TRIMLESS INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
Fig: 3
TROUBLESHOOTING
1. Check that the line voltage at the xture is correct. Refer
to wiring directions.
2. Is the xture grounded properly?
CLEANING & MAINTENANCE
CAUTION: Be sure xture temperature is cool enough to
touch. Do not clean or maintain while xture is energized.
1. Do not open xture to clean the LED. Do not touch
the LED.
2. Do not touch reector, lens or trim cone.
3. Do not clean any xture surface with wood base cleaning
material such as paper towels or tissues.
WIRING
RISK OF FIRE. Compatible with triac drivers at 120V, 50 or
60 Hz. Drop down supply wires must be atleast 9” long to
allow xture removal.
1. Connect the GROUND wire from xture to supply
ground.
2. Connect the black xture lead to the (+) LINE supply lead.
3. Connect the white xture lead to the (-) COMMON supply
lead.
SPACKLED FLANGE MOUNTING
1. Place Spackle Flange on ceiling and align the opening
with the ceiling cutout. Carefully mark the (4) hole
pattern on ceiling and remove Spackle Flange.
2. For New Construction (Fig: 3): Use a 7/32” drill bit to drill
ceiling typical 5/8” ceiling depth. Align rib of Spackle
Flange to rib in Rough-in. Insert the Spackle Flange and
secure with 8-32 x 1-1/2” at head counter shank machine
screws.
NOTE: DO NOT DRILL HOLES DEEPER THAN THE
CEILING THICKNESS.
3. For Remodeler Unit without rough-in frame (Fig4): Use
5/16” drill bit and drill ceiling at 4 marked places. Install
Wall Anchors and secure Spackled Flange with 8-32 X
1-1/4” at head counter shank sheet metal screws.
4. Apply joint compound to spackle frame edge. Remove
Dust protector and remove small debries and make it
ush to ceiling.
8/32 X 1-1/4”
screws at head
counter shank(4)
Wall Anchors (4)
Fig: 4
WALLWASH MOUNTING
1. For the Wallwash Model, orient the xture such that
the Reector is aimed in correct orientation. Look for
Towards the Wall’ label on the xture.
2. If necessary, the position of the wall wash reector can be
changed. Unscrew the two Trim Ring screws and remove
the Trim Ring.
3. Remove the Friction Ring, and change the position
of the reector. Note: Square Wall Wash reector can
rotate by 90. Be sure the slot on the Reector is aligned
to slot in Trim Ring.
Spackled Flange
Trim Ring Screws
Square Wall Wash reector
Trim Ring
Ceiling
Friction Ring
Fig: 5
Spackled Flange
Ceiling
8-32 x 1-1/2” screws
at head counter
shank (4)
Note: These instructions do not cover all details or variations in
equipment nor do they provide for every possible situation during
installation, operation or maintenance.
RDLED2TL ND2TL WITH TRIMLESS INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
Ø1-3/8”
3.0”
7.53”
3-1/4”
1-1/4”
3.0X3.0”
DIMENSIONAL DRAWING
RDLED2R
RDLED2S
7.53”
3-1/4”
RDLED2TL-IN 1017
Easy Answers
rabweb.com
Visit our website for product info
Tech Help Line
Call our experts - 888 722-1000
e-mail
Answered promptly - sales@rabweb.com
Free Lighting Layouts
Answered online or by request
© 2017 RAB LIGHTING Inc.
Northvale, New Jersey 07647 USA
RDLED2AR ADJUSTABLE INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
Fig. 1
Buttery Brackets
Nailer Bar
Wing Nut
Downturn Collar
Rough-in
Section
Supply wires
Junction Box
Screw
Junction Box
Leg
Fig. 2
Trim Ring
Spring Clip
IMPORTANT
READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
RAB xtures must be wired in accordance with the National Electrical Code and all applicable local codes. Proper grounding
is required for safety. THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE BY A
PERSON FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED.
WARNING: Make certain power is OFF before installing or maintaining xture.
RDLED2AR
ROUGHIN MOUNTIN
For both round and square xture, prepare mounting
surface with 2 1/2” diameter cutout.
1. Nailer bars are provided for use with wood joist
installations. Insert through nailer bar slots and secure
accordingly.
2. Buttery brackets provided to use C-Channels.
(optionally available, consult factory). Consult local
building codes for nal support of xture.
3. The xture can be adjusted from 1/2” to 1” max ceiling
thickness. For height adjustment, loosen the Wing Nut
and slide the Buttery Bracket. If necessary remove the
Wing Nut and insert in screw in dierent hole provided
on the Buttery Bracket. (Fig. 1)
4. Adjust both the Buttery Brackets such that the
downturn collar of Rough-In Section is ush with the
nished ceiling surface. Tighten the Wing nuts.
5. Drop down Supply Wire must be at least 9” long to allow
xture removal.
6. Loosen the Junction Box Screw and open the Junction
Box (Fig. 2). Attach Supply Wires into Junction Box and
connect to the xture. See wiring section for details.
7. Push up and slide the Junction Box section into the
ceiling. Be sure the Spring Clips is snapped in and Trim
Ring is ush and secure. Allow the Junction Box section
of housing to rest on the Leg support of the Rough-in
Section.
SURFACE PREPARATION
This xture can be installed with ceiling temperature not exceeding of 40°C and with minimum plenum height of 5.
The xture can be used to replace an existing unit or for new construction.
Prepare mounting surface with 2.5” diameter cutout. Cutout must be accurate not undersized or oversized. A hole saw is
recommended. CEILING CUT OUT MUST BE FREE OF ANY DEBRIS AND BURRS.
WARNING: Suitable for wet locations where the ambient temperature is 0°C minimum, +40°C maximum.
WARNING: Suitable for installation in Non-Accessible and Accessible Ceilings.
WARNING: Suitable for installation in Insulated Ceilings & Non-Insulated Ceilings.
RDLED2AR ADJUSTABLE INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
REMODELER MOUNTING
For both round and square xture, prepare mounting
surface with 2 3/8” diameter cutout.
1. Install Ceiling Collar into opening. Secure Ceiling Collar
by pushing ngertabs down tightly over ceiling. Fig. (3)
Note: Ceiling Collar is intended for 5/8”-3/4” sheet rock
ceilings. For 1/2” ceiling applications, use 1/8” shim to secure
trim module.
2. Loosen the Junction Box Screw and open the Junction
Box (Fig. 2). Attach Supply Wires into Junction Box and
connect to the xture. See wiring section for details.
3. Push up and slide the Junction Box section into the
Ceiling Collar. Be sure the Spring Clips are snapped in
and Trim Ring is ush and secure.
Ceiling
Fig. 3
Remodeler Unit
Fig. 4
Ceiling Collar
5/8” TYP
3/4”MAX
TROUBLESHOOTING
1. Check that the line voltage at the xture is correct. Refer
to wiring directions.
2. Is the xture grounded properly?
CLEANING & MAINTENANCE
CAUTION: Be sure xture temperature is cool enough to
touch. Do not clean or maintain while xture is energized.
1. Do not open xture to clean the LED. Do not touch
the LED.
2. Do not touch reector, lens or trim cone.
3. Do not clean any xture surface with wood base cleaning
material such as paper towels or tissues.
WIRING
RISK OF FIRE. Compatible with Triac and ELV dimmers at
120V, 50 or 60 Hz. Drop down supply wires must be at least
9” long to allow xture removal.
1. Connect the GROUND wire from xture to supply
ground.
2. Connect the black xture lead to the LINE supply lead.
3. Connect the white xture lead to the COMMON supply
lead.
Ceiling Collar
use wood
Shim (if
necessary)
ADJUSTABILITY
Adjust gimbal up to 30°
Rotate trim ring 360°
Rotatetrimring
360°
Adjustgimbalup
to30°
Adjustability
RDLED2AR ADJUSTABLE INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
Easy Answers
rabweb.com
Visit our website for product info
Tech Help Line
Call our experts - 888 722-1000
e-mail
Answered promptly - sales@rabweb.com
Free Lighting Layouts
Answered online or by request
© 2017 RAB LIGHTING Inc.
Northvale, New Jersey 07647 USA
DIMENSIONAL DRAWING
RDLED2AR-IN 1017
7.54”
3.28”
2.95”
Ø1.41
RDLED2AR ADJUSTABLE TRIMLESS INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
IMPORTANT
READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
RAB xtures must be wired in accordance with the National Electrical Code and all applicable local codes. Proper grounding
is required for safety. THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE BY A
PERSON FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED.
WARNING: Make certain power is OFF before installing or maintaining xture.
RDLED2AR
ROUGHIN MOUNTING
For both round and square xture, prepare mounting
surface with 3-3/16” diameter cutout. Use hole saw only
1. Nailer bars are provided for use with wood joist
installations. Insert through nailer bar slots and secure
accordingly.
2. Buttery brackets provided to use C-Channels.
(optionally available, consult factory). Consult local
building codes for nal support of xture.
3. The xture can be mounted into max 3/4” ceiling
thickness. For height adjustment, loosen the Wing Nut
and slide the Buttery Bracket. If necessary remove the
Wing Nut and insert in screw in dierent hole provided
on the Buttery Bracket. (Fig. 1)
4. Adjust both the Buttery Brackets such that the frame
of Rough-In Section is ush with the nished ceiling
surface. Tighten the Wing nuts.
5. Drop down Supply Wires must be at
6. least 9” long to allow xture removal.
7. Loosen the Junction Box Screw and open the Junction
Box (Fig. 2). Attach Supply Wires into Junction Box and
connect to the xture. See wiring section for details.
8. Push up and slide the Junction Box section into the
ceiling. Be sure the Spring Clips is snapped in and Trim
Ring is ush and secure. Allow the Junction Box section
of housing to rest on the Leg support of the Rough-in
Section.
SURFACE PREPARATION
This xture can be installed with ceiling temperature not exceeding of 40°C and with minimum plenum height of 5.
The xture can be used to replace an existing unit or for new construction.
Cutout must be accurate not undersized or oversized. A hole saw is recommended. CEILING CUT OUT MUST BE FREE
OF ANY DEBRIS AND BURRS.
WARNING: Suitable for wet locations where the ambient temperature is 0°C minimum, +40°C maximum.
WARNING: Suitable for installation in Non-Accessible and Accessible Ceilings.
WARNING: Suitable for installation in Insulated & Non-Insulated Ceilings.
Fig. 1
Buttery Brackets
Nailer Bar
Wing Nut
Downturn Collar
Rough-in
Section
Leg
Supply wires
Junction Box
Screw
Junction Box
Fig. 2
Trim Ring
Spring Clip
RDLED2AR ADJUSTABLE TRIMLESS INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
Fig. 3
TROUBLESHOOTING
1. Check that the line voltage at the xture is correct. Refer
to wiring directions.
2. Is the xture grounded properly?
CLEANING & MAINTENANCE
CAUTION: Be sure xture temperature is cool enough to
touch. Do not clean or maintain while xture is energized.
1. Do not open xture to clean the LED. Do not touch
the LED.
2. Do not touch reector, lens or trim cone.
3. Do not clean any xture surface with wood base cleaning
material such as paper towels or tissues.
WIRING
RISK OF FIRE. Compatible with Triac and ELV dimmers at
120V, 50 or 60 Hz. Drop down supply wires must be at least 9”
long to allow xture removal.
1. Connect the GROUND wire from xture to supply ground.
2. Connect the black xture lead to the LINE supply lead.
3. Connect the white xture lead to the COMMON supply
lead.
SPACKLED FLANGE MOUNTING
1. Place Spackle Flange on ceiling and align the opening
with the ceiling cutout. Carefully mark the (4) hole
pattern on ceiling and remove Spackle Flange.
2. For New Construction (Fig. 3): Use a 7/32” drill bit to drill
ceiling typical 5/8” ceiling depth. Align rib of Spackle
Flange to rib in Rough-in. Insert the Spackle Flange
and secure with 8-32 x 1-1/2” at head counter shank
machine screws.
NOTE: DO NOT DRILL HOLES DEEPER THAN THE
CEILING THICKNESS.
3. For Remodeler Unit (Fig. 4): Use 5/16” drill bit and drill
ceiling at 4 marked places. Install Wall Anchors and
secure Spackled Flange with 8-32 X 1-1/4” at head
counter shank sheet metal screws.
4. Apply joint compound to spackle frame edge. Remove
Dust protector and remove small debries and make it
ush to ceiling.
8/32 X 1-1/4”
screws (4)
Wall Anchors (4)
Fig. 4
Spackled Flange
Ceiling
Spackled Flange
Ceiling
8-32 x 1-1/2”
screws (4)
Note: These instructions do not cover all details or variations in equipment nor do they provide for every possible situation during installation,
operation or maintenance.
ADJUSTABILITY
Adjust gimbal up to 30°
Rotate trim ring 360°
Rotatetrimring
360°
Adjustgimbalup
to30°
Adjustability
RDLED2AR ADJUSTABLE TRIMLESS INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
Easy Answers
rabweb.com
Visit our website for product info
Tech Help Line
Call our experts - 888 722-1000
e-mail
Answered promptly - sales@rabweb.com
Free Lighting Layouts
Answered online or by request
© 2017 RAB LIGHTING Inc.
Northvale, New Jersey 07647 USA
DIMENSIONAL DRAWING
RDLED2AR-TL-IN 1017
7.54”
3.28”
2.95”
Ø1.41
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12

RAB Lighting RDLED2AR8-40YHC-TS Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI