American Standard T064.502.295 Installation guide

Category
Sanitary ware
Type
Installation guide

This manual is also suitable for

American Standard T064.502.295 is a bath and shower trim kit that allows you to control the flow and temperature of water in your shower and tub. It features a pressure-balancing valve that helps to maintain a consistent water temperature, even when other water sources in your home are being used. The trim kit also includes a diverter spout that allows you to switch between the shower head and tub spout.

American Standard T064.502.295 is a bath and shower trim kit that allows you to control the flow and temperature of water in your shower and tub. It features a pressure-balancing valve that helps to maintain a consistent water temperature, even when other water sources in your home are being used. The trim kit also includes a diverter spout that allows you to switch between the shower head and tub spout.

BATH AND SHOWER TRIM KIT
M 9 6 8 8 3 7 R e v . 1 . 1
M 9 6 8 8 3 7 R e v . 1 . 1
M 9 6 8 8 3 7 R e v . 1 . 1 M 9 6 8 8 3 7 R e v . 1 . 1
To assure proper positioning in relation to wall,
note roughing-in dimensions.
M953540-YYY0A
SHOWER HEAD
M962493-YYY0A
SHOWER ARM & FLANGE
M907053-YYY0A
CARTRIDGE CAP
ROUGHING-IN DIMENSIONS
Certified to comply with ANSI A112.18.1
MODEL NUMBER
5
Remove HANDLE (see step 3 and reverse).
Remove ESCUTCHEON and CARRIDGE CAP (see step 1 and reverse).
Shut off water supply by either closing off main water supply, or closing off
the hot and cold CHECK STOPS on valve.
TO GAIN ACCESS TO VALVE FOR SERVICING
Remove CARTRIDGE (1) by removing CARTRIDGE SCREWS (2). Remove three SCREWS (3) from FIXATION RING (4) and
pull out PRESSURE BALANCING (5) unit.
Clean SEALS (9) on base of CARTRIDGE (1). Check base of PRESSURE BALANCING UNIT (5) and clean O-RINGS (6). Remove
CAPS (7) and check O-RINGS on inside of CAPS (7). Clean inside sealing surfaces of VALVE BODY (8).
Re-assemble PRESSURE BALANCING UNIT (5) and CARTRIDGE (1). Tighten all screws.
Turn on water supply and see above for installing TRIM and HANDLE.
VALVE LEAKS WHEN SHUT OFF
BACK TO BACK INSTALLATION
BACK TO BACK INSTALLATION
ROTATE 180˚
Remove PRESSURE BALANCE UNIT (5).
Remove CAPS (7) and clean valve thoroughly.
Examine balancing unit and check condition of O-ring on end of piston. Piston should move back and forth. Order Repair
Part M952100-0070A if balancing unit is defective.
Replace CAPS (7) and install PRESSURE BALANCE UNIT (5). Make sure inlets line up with two holes in bottom of casting.
Top flange should butt-up against top of casting.
Remove PRESSURE BALANCE UNIT (5). Rotate PRESSURE BALANCE UNIT (5) 180˚ so that the inlets face up and the
large outlet port faces down.
Push PRESSURE BALANCE UNIT (5) in casting make sure inlets line up with holes in bottom of casting. Top flange should
butt up against top of casting.
Reassemble FIXATION RING (4) and CARTRIDGE (1).
UNABLE TO MAINTAIN CONSTANT TEMPERATURE
1
2
9
5
5
7
8
6
4
3
INLETS
LARGE OUTLET
Installation
Instructions
ONE
T064.50X
THREADED INLETS (STOPS)
INLETS
1/2" NPT
5-7/8"
INLETS 1/2" NPT
OUTLETS
1/2" NPT
OUTLETS
1/2" NPT
3-3/8"
3-3/8"
3-3/8"
THREADED INLETS
6
Recommened Tools
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
Plumbers' Putty or Caulking
Phillips Screwdriver
HOT LINE FOR HELP
For toll-free information and answers to your questions, call:
1 (800) 442-1902
Weekdays 8:00 a.m. to 6:00 p.m. EST
IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093)
Weekdays 8:00 a.m. to 7:00 p.m. EST
Pr o duc t na m es list ed h ere i n a r e t r ade mark s o f Am e ric a n S tand ard Inc .
© A mer i can Sta ndar d In c. 2 006
4"
BOTTOM OF TUB
74" FOR HEAD
CLEARANCE
18" OPTIONAL
5-1/8" REF.
1/2" NPT
1-5/8"
to
3-1/4"
1/2" NPT
7-1/4"
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 80''
TOP OF TUB RIM
A918477-0070A
HANDLE SCREW
M918039-0070A
HANDLE ADAPTER
Teflon Tape
BATH AND SHOWER TRIM KITS
ONE
T064.50X
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
4-1/16"
5-7/8"
INLETS
4-1/16"
4-1/16"
INLETS
1/2" NOM.
COPPER
SWEAT
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
2"
SWEAT
INLETS
SWEAT
INLETS (STOPS)
INLETS
1/2" NOM.
COPPER
SWEAT
1/2" REF.
1-5/8" TO 3-1/4"
FINISHED WALL
1
5
1
3
1
1
9
7
5
3
1
0
1
5
1
3
1
1
9
7
5
3
1
1
5
1
3
1
1
9
7
5
3
1
COLDER
(Larger Numbers)
0 1 3 5 7 9 11 13 15
HOTTER
(Smaller Numbers)
0 1 3 5 7 9 11 13 15
ADJUST HOT LIMIT STOP
By restricting HANDLE rotation and limiting the amount of hot
water allowed to mix with the cold, the HOT LIMIT SAFETY
STOP (1) reduces risk of accidental scalding. To set the maximum
hot water temperature of your faucet, all you need to do
is adjust the setting on the HOT LIMIT SAFETY STOP (1).
4
Turn CARTRIDGE STEM (2) to the OFF position (coldest setting) before
making adjustment to HOT LIMIT STOP (1). Use aflat blade screwdriver to pry
free the HOT LIMIT SAFETY STOP (1). Pull forward and rotate counterclockwise
one number to limit hot water temperature. Use ARROW (3) on CARTRIDGE (4)
and NUMBERS (5) on HOT LIMIT STOP (1) for indication.
1
5
4
3
1
5
4
3
2
2
1
INSTALL VALVE TRIM
1
1
Figure 1.
Figure 2.
Figure 3.
7
3
5
6
5
4
2
1
2
INSTALL TRIM
Remove PIPE PLUG and CAP (1, 2) from shower pipe and tub
filler pipe.
Install SHOWER ESCUTCHEON (3) onto SHOWER
ARM (4). Apply sealant or Teflon tape to threads on
both ends of SHOWER ARM (4) and thread longer
leg of SHOWER ARM (4) into shower elbow.
Thread SHOWER HEAD (5) onto SHOWER ARM (4).
Thread TUB SPOUT (6) onto spout nipple flush with finished wall.
1
2
CAUTION: Protect finish on SHOWER
HEAD and TUB SPOUT when installing.
Figure 1. Remove plaster guard from valve. Push CAP (1)
over VALVE CARTRIDGE (2) until seated against stop.
Figure 2. Push ESCUTCHEON HOLDER (3) onto CAP (1)
and attach to valve body with LONG SCREWS (4). Mount
ESCUTCHEON SUPPORT (5) to ESCUTCHEON HOLDER (3)
with 4 SHORT SCREWS (6).
Figure 3. Install ESCUTCHEON (7) onto CAP (1) and push
flush against finished wall.
3
INSTALL HANDLE
4
3
1
5
Hold ADAPTER (1) onto VALVE STEM (2) and install
ADAPTER SCREW (3) through ADAPTER (1) into
VALVE STEM (2).Tighten ADAPTER SCREW (3) to
secure ADAPTER (1) to VALVE STEM (2).
Install HANDLE BASE (4) onto ADAPTER (1). Insert
SET SCREW (5) into HANDLE BASE (4). Align
HANDLE BASE (4) and tighten with HEX WRENCH
(6) supplied.
Thread LEVER HANDLE (7) into HANDLE BASE (4).
Note: Apply sealant or Teflon Tape to shower and tub
spout connections.
2
6
3
4
6
7
023572-YYY0A
DIVERTER SPOUT (IPS)
M962426-YYY0A
HANDLE KIT
012653-YYY0A
DIVERTER SPOUT
REPAIR KIT
A953876-YYY0A
ESCUTCHEON
M962642-0070A
ESCUTCHEON HOLDER
PLSTER
GUARD
APPLY SEALANT OR
TEFLON TAPE TO THREADS
To ensure that your installation proceeds smoothly-please read these
instructions carefully before you begin.
5-5/8" REF.
8-1/8" REF.
2-3/8"
CHROME
SATIN NICKEL
002
295
Replace the "YYY" with
appropriate finish code
IN MEXICO 01-800-839-12-00
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.
DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH.
DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A
CLOTH WITH A COARSE SURFACE.
CARE INSTRUCTIONS:
BATH AND SHOWER TRIM KIT
M 9 6 8 8 3 7 R e v . 1 . 1
M 9 6 8 8 3 7 R e v . 1 . 1
M 9 6 8 8 3 7 R e v . 1 . 1 M 9 6 8 8 3 7 R e v . 1 . 1
To assure proper positioning in relation to wall,
note roughing-in dimensions.
M953540-YYY0A
SHOWER HEAD
M962493-YYY0A
SHOWER ARM & FLANGE
M907053-YYY0A
CARTRIDGE CAP
ROUGHING-IN DIMENSIONS
Certified to comply with ANSI A112.18.1
MODEL NUMBER
5
Remove HANDLE (see step 3 and reverse).
Remove ESCUTCHEON and CARRIDGE CAP (see step 1 and reverse).
Shut off water supply by either closing off main water supply, or closing off
the hot and cold CHECK STOPS on valve.
TO GAIN ACCESS TO VALVE FOR SERVICING
Remove CARTRIDGE (1) by removing CARTRIDGE SCREWS (2). Remove three SCREWS (3) from FIXATION RING (4) and
pull out PRESSURE BALANCING (5) unit.
Clean SEALS (9) on base of CARTRIDGE (1). Check base of PRESSURE BALANCING UNIT (5) and clean O-RINGS (6). Remove
CAPS (7) and check O-RINGS on inside of CAPS (7). Clean inside sealing surfaces of VALVE BODY (8).
Re-assemble PRESSURE BALANCING UNIT (5) and CARTRIDGE (1). Tighten all screws.
Turn on water supply and see above for installing TRIM and HANDLE.
VALVE LEAKS WHEN SHUT OFF
BACK TO BACK INSTALLATION
BACK TO BACK INSTALLATION
ROTATE 180˚
Remove PRESSURE BALANCE UNIT (5).
Remove CAPS (7) and clean valve thoroughly.
Examine balancing unit and check condition of O-ring on end of piston. Piston should move back and forth. Order Repair
Part M952100-0070A if balancing unit is defective.
Replace CAPS (7) and install PRESSURE BALANCE UNIT (5). Make sure inlets line up with two holes in bottom of casting.
Top flange should butt-up against top of casting.
Remove PRESSURE BALANCE UNIT (5). Rotate PRESSURE BALANCE UNIT (5) 180˚ so that the inlets face up and the
large outlet port faces down.
Push PRESSURE BALANCE UNIT (5) in casting make sure inlets line up with holes in bottom of casting. Top flange should
butt up against top of casting.
Reassemble FIXATION RING (4) and CARTRIDGE (1).
UNABLE TO MAINTAIN CONSTANT TEMPERATURE
1
2
9
5
5
7
8
6
4
3
INLETS
LARGE OUTLET
Installation
Instructions
ONE
T064.50X
THREADED INLETS (STOPS)
INLETS
1/2" NPT
5-7/8"
INLETS 1/2" NPT
OUTLETS
1/2" NPT
OUTLETS
1/2" NPT
3-3/8"
3-3/8"
3-3/8"
THREADED INLETS
6
Recommened Tools
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
Plumbers' Putty or Caulking
Phillips Screwdriver
HOT LINE FOR HELP
For toll-free information and answers to your questions, call:
1 (800) 442-1902
Weekdays 8:00 a.m. to 6:00 p.m. EST
IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093)
Weekdays 8:00 a.m. to 7:00 p.m. EST
Pr o duc t na m es list ed h ere i n a r e t r ade mark s o f Am e ric a n S tand ard Inc .
© A mer i can Sta ndar d In c. 2 006
4"
BOTTOM OF TUB
74" FOR HEAD
CLEARANCE
18" OPTIONAL
5-1/8" REF.
1/2" NPT
1-5/8"
to
3-1/4"
1/2" NPT
7-1/4"
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 80''
TOP OF TUB RIM
A918477-0070A
HANDLE SCREW
M918039-0070A
HANDLE ADAPTER
Teflon Tape
BATH AND SHOWER TRIM KITS
ONE
T064.50X
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
4-1/16"
5-7/8"
INLETS
4-1/16"
4-1/16"
INLETS
1/2" NOM.
COPPER
SWEAT
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
2"
SWEAT
INLETS
SWEAT
INLETS (STOPS)
INLETS
1/2" NOM.
COPPER
SWEAT
1/2" REF.
1-5/8" TO 3-1/4"
FINISHED WALL
1
5
1
3
1
1
9
7
5
3
1
0
1
5
1
3
1
1
9
7
5
3
1
1
5
1
3
1
1
9
7
5
3
1
COLDER
(Larger Numbers)
0 1 3 5 7 9 11 13 15
HOTTER
(Smaller Numbers)
0 1 3 5 7 9 11 13 15
ADJUST HOT LIMIT STOP
By restricting HANDLE rotation and limiting the amount of hot
water allowed to mix with the cold, the HOT LIMIT SAFETY
STOP (1) reduces risk of accidental scalding. To set the maximum
hot water temperature of your faucet, all you need to do
is adjust the setting on the HOT LIMIT SAFETY STOP (1).
4
Turn CARTRIDGE STEM (2) to the OFF position (coldest setting) before
making adjustment to HOT LIMIT STOP (1). Use aflat blade screwdriver to pry
free the HOT LIMIT SAFETY STOP (1). Pull forward and rotate counterclockwise
one number to limit hot water temperature. Use ARROW (3) on CARTRIDGE (4)
and NUMBERS (5) on HOT LIMIT STOP (1) for indication.
1
5
4
3
1
5
4
3
2
2
1
INSTALL VALVE TRIM
1
1
Figure 1.
Figure 2.
Figure 3.
7
3
5
6
5
4
2
1
2
INSTALL TRIM
Remove PIPE PLUG and CAP (1, 2) from shower pipe and tub
filler pipe.
Install SHOWER ESCUTCHEON (3) onto SHOWER
ARM (4). Apply sealant or Teflon tape to threads on
both ends of SHOWER ARM (4) and thread longer
leg of SHOWER ARM (4) into shower elbow.
Thread SHOWER HEAD (5) onto SHOWER ARM (4).
Thread TUB SPOUT (6) onto spout nipple flush with finished wall.
1
2
CAUTION: Protect finish on SHOWER
HEAD and TUB SPOUT when installing.
Figure 1. Remove plaster guard from valve. Push CAP (1)
over VALVE CARTRIDGE (2) until seated against stop.
Figure 2. Push ESCUTCHEON HOLDER (3) onto CAP (1)
and attach to valve body with LONG SCREWS (4). Mount
ESCUTCHEON SUPPORT (5) to ESCUTCHEON HOLDER (3)
with 4 SHORT SCREWS (6).
Figure 3. Install ESCUTCHEON (7) onto CAP (1) and push
flush against finished wall.
3
INSTALL HANDLE
4
3
1
5
Hold ADAPTER (1) onto VALVE STEM (2) and install
ADAPTER SCREW (3) through ADAPTER (1) into
VALVE STEM (2).Tighten ADAPTER SCREW (3) to
secure ADAPTER (1) to VALVE STEM (2).
Install HANDLE BASE (4) onto ADAPTER (1). Insert
SET SCREW (5) into HANDLE BASE (4). Align
HANDLE BASE (4) and tighten with HEX WRENCH
(6) supplied.
Thread LEVER HANDLE (7) into HANDLE BASE (4).
Note: Apply sealant or Teflon Tape to shower and tub
spout connections.
2
6
3
4
6
7
023572-YYY0A
DIVERTER SPOUT (IPS)
M962426-YYY0A
HANDLE KIT
012653-YYY0A
DIVERTER SPOUT
REPAIR KIT
A953876-YYY0A
ESCUTCHEON
M962642-0070A
ESCUTCHEON HOLDER
PLSTER
GUARD
APPLY SEALANT OR
TEFLON TAPE TO THREADS
To ensure that your installation proceeds smoothly-please read these
instructions carefully before you begin.
5-5/8" REF.
8-1/8" REF.
2-3/8"
CHROME
SATIN NICKEL
002
295
Replace the "YYY" with
appropriate finish code
IN MEXICO 01-800-839-12-00
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.
DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH.
DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A
CLOTH WITH A COARSE SURFACE.
CARE INSTRUCTIONS:
BATH AND SHOWER TRIM KIT
M 9 6 8 8 3 7 R e v . 1 . 1
M 9 6 8 8 3 7 R e v . 1 . 1
M 9 6 8 8 3 7 R e v . 1 . 1 M 9 6 8 8 3 7 R e v . 1 . 1
To assure proper positioning in relation to wall,
note roughing-in dimensions.
M953540-YYY0A
SHOWER HEAD
M962493-YYY0A
SHOWER ARM & FLANGE
M907053-YYY0A
CARTRIDGE CAP
ROUGHING-IN DIMENSIONS
Certified to comply with ANSI A112.18.1
MODEL NUMBER
5
Remove HANDLE (see step 3 and reverse).
Remove ESCUTCHEON and CARRIDGE CAP (see step 1 and reverse).
Shut off water supply by either closing off main water supply, or closing off
the hot and cold CHECK STOPS on valve.
TO GAIN ACCESS TO VALVE FOR SERVICING
Remove CARTRIDGE (1) by removing CARTRIDGE SCREWS (2). Remove three SCREWS (3) from FIXATION RING (4) and
pull out PRESSURE BALANCING (5) unit.
Clean SEALS (9) on base of CARTRIDGE (1). Check base of PRESSURE BALANCING UNIT (5) and clean O-RINGS (6). Remove
CAPS (7) and check O-RINGS on inside of CAPS (7). Clean inside sealing surfaces of VALVE BODY (8).
Re-assemble PRESSURE BALANCING UNIT (5) and CARTRIDGE (1). Tighten all screws.
Turn on water supply and see above for installing TRIM and HANDLE.
VALVE LEAKS WHEN SHUT OFF
BACK TO BACK INSTALLATION
BACK TO BACK INSTALLATION
ROTATE 180˚
Remove PRESSURE BALANCE UNIT (5).
Remove CAPS (7) and clean valve thoroughly.
Examine balancing unit and check condition of O-ring on end of piston. Piston should move back and forth. Order Repair
Part M952100-0070A if balancing unit is defective.
Replace CAPS (7) and install PRESSURE BALANCE UNIT (5). Make sure inlets line up with two holes in bottom of casting.
Top flange should butt-up against top of casting.
Remove PRESSURE BALANCE UNIT (5). Rotate PRESSURE BALANCE UNIT (5) 180˚ so that the inlets face up and the
large outlet port faces down.
Push PRESSURE BALANCE UNIT (5) in casting make sure inlets line up with holes in bottom of casting. Top flange should
butt up against top of casting.
Reassemble FIXATION RING (4) and CARTRIDGE (1).
UNABLE TO MAINTAIN CONSTANT TEMPERATURE
1
2
9
5
5
7
8
6
4
3
INLETS
LARGE OUTLET
Installation
Instructions
ONE
T064.50X
THREADED INLETS (STOPS)
INLETS
1/2" NPT
5-7/8"
INLETS 1/2" NPT
OUTLETS
1/2" NPT
OUTLETS
1/2" NPT
3-3/8"
3-3/8"
3-3/8"
THREADED INLETS
6
Recommened Tools
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
Plumbers' Putty or Caulking
Phillips Screwdriver
HOT LINE FOR HELP
For toll-free information and answers to your questions, call:
1 (800) 442-1902
Weekdays 8:00 a.m. to 6:00 p.m. EST
IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093)
Weekdays 8:00 a.m. to 7:00 p.m. EST
Pr o duc t na m es list ed h ere i n a r e t r ade mark s o f Am e ric a n S tand ard Inc .
© A mer i can Sta ndar d In c. 2 006
4"
BOTTOM OF TUB
74" FOR HEAD
CLEARANCE
18" OPTIONAL
5-1/8" REF.
1/2" NPT
1-5/8"
to
3-1/4"
1/2" NPT
7-1/4"
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 80''
TOP OF TUB RIM
A918477-0070A
HANDLE SCREW
M918039-0070A
HANDLE ADAPTER
Teflon Tape
BATH AND SHOWER TRIM KITS
ONE
T064.50X
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
4-1/16"
5-7/8"
INLETS
4-1/16"
4-1/16"
INLETS
1/2" NOM.
COPPER
SWEAT
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
2"
SWEAT
INLETS
SWEAT
INLETS (STOPS)
INLETS
1/2" NOM.
COPPER
SWEAT
1/2" REF.
1-5/8" TO 3-1/4"
FINISHED WALL
1
5
1
3
1
1
9
7
5
3
1
0
1
5
1
3
1
1
9
7
5
3
1
1
5
1
3
1
1
9
7
5
3
1
COLDER
(Larger Numbers)
0 1 3 5 7 9 11 13 15
HOTTER
(Smaller Numbers)
0 1 3 5 7 9 11 13 15
ADJUST HOT LIMIT STOP
By restricting HANDLE rotation and limiting the amount of hot
water allowed to mix with the cold, the HOT LIMIT SAFETY
STOP (1) reduces risk of accidental scalding. To set the maximum
hot water temperature of your faucet, all you need to do
is adjust the setting on the HOT LIMIT SAFETY STOP (1).
4
Turn CARTRIDGE STEM (2) to the OFF position (coldest setting) before
making adjustment to HOT LIMIT STOP (1). Use aflat blade screwdriver to pry
free the HOT LIMIT SAFETY STOP (1). Pull forward and rotate counterclockwise
one number to limit hot water temperature. Use ARROW (3) on CARTRIDGE (4)
and NUMBERS (5) on HOT LIMIT STOP (1) for indication.
1
5
4
3
1
5
4
3
2
2
1
INSTALL VALVE TRIM
1
1
Figure 1.
Figure 2.
Figure 3.
7
3
5
6
5
4
2
1
2
INSTALL TRIM
Remove PIPE PLUG and CAP (1, 2) from shower pipe and tub
filler pipe.
Install SHOWER ESCUTCHEON (3) onto SHOWER
ARM (4). Apply sealant or Teflon tape to threads on
both ends of SHOWER ARM (4) and thread longer
leg of SHOWER ARM (4) into shower elbow.
Thread SHOWER HEAD (5) onto SHOWER ARM (4).
Thread TUB SPOUT (6) onto spout nipple flush with finished wall.
1
2
CAUTION: Protect finish on SHOWER
HEAD and TUB SPOUT when installing.
Figure 1. Remove plaster guard from valve. Push CAP (1)
over VALVE CARTRIDGE (2) until seated against stop.
Figure 2. Push ESCUTCHEON HOLDER (3) onto CAP (1)
and attach to valve body with LONG SCREWS (4). Mount
ESCUTCHEON SUPPORT (5) to ESCUTCHEON HOLDER (3)
with 4 SHORT SCREWS (6).
Figure 3. Install ESCUTCHEON (7) onto CAP (1) and push
flush against finished wall.
3
INSTALL HANDLE
4
3
1
5
Hold ADAPTER (1) onto VALVE STEM (2) and install
ADAPTER SCREW (3) through ADAPTER (1) into
VALVE STEM (2).Tighten ADAPTER SCREW (3) to
secure ADAPTER (1) to VALVE STEM (2).
Install HANDLE BASE (4) onto ADAPTER (1). Insert
SET SCREW (5) into HANDLE BASE (4). Align
HANDLE BASE (4) and tighten with HEX WRENCH
(6) supplied.
Thread LEVER HANDLE (7) into HANDLE BASE (4).
Note: Apply sealant or Teflon Tape to shower and tub
spout connections.
2
6
3
4
6
7
023572-YYY0A
DIVERTER SPOUT (IPS)
M962426-YYY0A
HANDLE KIT
012653-YYY0A
DIVERTER SPOUT
REPAIR KIT
A953876-YYY0A
ESCUTCHEON
M962642-0070A
ESCUTCHEON HOLDER
PLSTER
GUARD
APPLY SEALANT OR
TEFLON TAPE TO THREADS
To ensure that your installation proceeds smoothly-please read these
instructions carefully before you begin.
5-5/8" REF.
8-1/8" REF.
2-3/8"
CHROME
SATIN NICKEL
002
295
Replace the "YYY" with
appropriate finish code
IN MEXICO 01-800-839-12-00
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.
DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH.
DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A
CLOTH WITH A COARSE SURFACE.
CARE INSTRUCTIONS:
BATH AND SHOWER TRIM KIT
M 9 6 8 8 3 7 R e v . 1 . 1
M 9 6 8 8 3 7 R e v . 1 . 1
M 9 6 8 8 3 7 R e v . 1 . 1 M 9 6 8 8 3 7 R e v . 1 . 1
To assure proper positioning in relation to wall,
note roughing-in dimensions.
M953540-YYY0A
SHOWER HEAD
M962493-YYY0A
SHOWER ARM & FLANGE
M907053-YYY0A
CARTRIDGE CAP
ROUGHING-IN DIMENSIONS
Certified to comply with ANSI A112.18.1
MODEL NUMBER
5
Remove HANDLE (see step 3 and reverse).
Remove ESCUTCHEON and CARRIDGE CAP (see step 1 and reverse).
Shut off water supply by either closing off main water supply, or closing off
the hot and cold CHECK STOPS on valve.
TO GAIN ACCESS TO VALVE FOR SERVICING
Remove CARTRIDGE (1) by removing CARTRIDGE SCREWS (2). Remove three SCREWS (3) from FIXATION RING (4) and
pull out PRESSURE BALANCING (5) unit.
Clean SEALS (9) on base of CARTRIDGE (1). Check base of PRESSURE BALANCING UNIT (5) and clean O-RINGS (6). Remove
CAPS (7) and check O-RINGS on inside of CAPS (7). Clean inside sealing surfaces of VALVE BODY (8).
Re-assemble PRESSURE BALANCING UNIT (5) and CARTRIDGE (1). Tighten all screws.
Turn on water supply and see above for installing TRIM and HANDLE.
VALVE LEAKS WHEN SHUT OFF
BACK TO BACK INSTALLATION
BACK TO BACK INSTALLATION
ROTATE 180˚
Remove PRESSURE BALANCE UNIT (5).
Remove CAPS (7) and clean valve thoroughly.
Examine balancing unit and check condition of O-ring on end of piston. Piston should move back and forth. Order Repair
Part M952100-0070A if balancing unit is defective.
Replace CAPS (7) and install PRESSURE BALANCE UNIT (5). Make sure inlets line up with two holes in bottom of casting.
Top flange should butt-up against top of casting.
Remove PRESSURE BALANCE UNIT (5). Rotate PRESSURE BALANCE UNIT (5) 180˚ so that the inlets face up and the
large outlet port faces down.
Push PRESSURE BALANCE UNIT (5) in casting make sure inlets line up with holes in bottom of casting. Top flange should
butt up against top of casting.
Reassemble FIXATION RING (4) and CARTRIDGE (1).
UNABLE TO MAINTAIN CONSTANT TEMPERATURE
1
2
9
5
5
7
8
6
4
3
INLETS
LARGE OUTLET
Installation
Instructions
ONE
T064.50X
THREADED INLETS (STOPS)
INLETS
1/2" NPT
5-7/8"
INLETS 1/2" NPT
OUTLETS
1/2" NPT
OUTLETS
1/2" NPT
3-3/8"
3-3/8"
3-3/8"
THREADED INLETS
6
Recommened Tools
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
Plumbers' Putty or Caulking
Phillips Screwdriver
HOT LINE FOR HELP
For toll-free information and answers to your questions, call:
1 (800) 442-1902
Weekdays 8:00 a.m. to 6:00 p.m. EST
IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093)
Weekdays 8:00 a.m. to 7:00 p.m. EST
Pr o duc t na m es list ed h ere i n a r e t r ade mark s o f Am e ric a n S tand ard Inc .
© A mer i can Sta ndar d In c. 2 006
4"
BOTTOM OF TUB
74" FOR HEAD
CLEARANCE
18" OPTIONAL
5-1/8" REF.
1/2" NPT
1-5/8"
to
3-1/4"
1/2" NPT
7-1/4"
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 80''
TOP OF TUB RIM
A918477-0070A
HANDLE SCREW
M918039-0070A
HANDLE ADAPTER
Teflon Tape
BATH AND SHOWER TRIM KITS
ONE
T064.50X
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
4-1/16"
5-7/8"
INLETS
4-1/16"
4-1/16"
INLETS
1/2" NOM.
COPPER
SWEAT
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
2"
SWEAT
INLETS
SWEAT
INLETS (STOPS)
INLETS
1/2" NOM.
COPPER
SWEAT
1/2" REF.
1-5/8" TO 3-1/4"
FINISHED WALL
1
5
1
3
1
1
9
7
5
3
1
0
1
5
1
3
1
1
9
7
5
3
1
1
5
1
3
1
1
9
7
5
3
1
COLDER
(Larger Numbers)
0 1 3 5 7 9 11 13 15
HOTTER
(Smaller Numbers)
0 1 3 5 7 9 11 13 15
ADJUST HOT LIMIT STOP
By restricting HANDLE rotation and limiting the amount of hot
water allowed to mix with the cold, the HOT LIMIT SAFETY
STOP (1) reduces risk of accidental scalding. To set the maximum
hot water temperature of your faucet, all you need to do
is adjust the setting on the HOT LIMIT SAFETY STOP (1).
4
Turn CARTRIDGE STEM (2) to the OFF position (coldest setting) before
making adjustment to HOT LIMIT STOP (1). Use aflat blade screwdriver to pry
free the HOT LIMIT SAFETY STOP (1). Pull forward and rotate counterclockwise
one number to limit hot water temperature. Use ARROW (3) on CARTRIDGE (4)
and NUMBERS (5) on HOT LIMIT STOP (1) for indication.
1
5
4
3
1
5
4
3
2
2
1
INSTALL VALVE TRIM
1
1
Figure 1.
Figure 2.
Figure 3.
7
3
5
6
5
4
2
1
2
INSTALL TRIM
Remove PIPE PLUG and CAP (1, 2) from shower pipe and tub
filler pipe.
Install SHOWER ESCUTCHEON (3) onto SHOWER
ARM (4). Apply sealant or Teflon tape to threads on
both ends of SHOWER ARM (4) and thread longer
leg of SHOWER ARM (4) into shower elbow.
Thread SHOWER HEAD (5) onto SHOWER ARM (4).
Thread TUB SPOUT (6) onto spout nipple flush with finished wall.
1
2
CAUTION: Protect finish on SHOWER
HEAD and TUB SPOUT when installing.
Figure 1. Remove plaster guard from valve. Push CAP (1)
over VALVE CARTRIDGE (2) until seated against stop.
Figure 2. Push ESCUTCHEON HOLDER (3) onto CAP (1)
and attach to valve body with LONG SCREWS (4). Mount
ESCUTCHEON SUPPORT (5) to ESCUTCHEON HOLDER (3)
with 4 SHORT SCREWS (6).
Figure 3. Install ESCUTCHEON (7) onto CAP (1) and push
flush against finished wall.
3
INSTALL HANDLE
4
3
1
5
Hold ADAPTER (1) onto VALVE STEM (2) and install
ADAPTER SCREW (3) through ADAPTER (1) into
VALVE STEM (2).Tighten ADAPTER SCREW (3) to
secure ADAPTER (1) to VALVE STEM (2).
Install HANDLE BASE (4) onto ADAPTER (1). Insert
SET SCREW (5) into HANDLE BASE (4). Align
HANDLE BASE (4) and tighten with HEX WRENCH
(6) supplied.
Thread LEVER HANDLE (7) into HANDLE BASE (4).
Note: Apply sealant or Teflon Tape to shower and tub
spout connections.
2
6
3
4
6
7
023572-YYY0A
DIVERTER SPOUT (IPS)
M962426-YYY0A
HANDLE KIT
012653-YYY0A
DIVERTER SPOUT
REPAIR KIT
A953876-YYY0A
ESCUTCHEON
M962642-0070A
ESCUTCHEON HOLDER
PLSTER
GUARD
APPLY SEALANT OR
TEFLON TAPE TO THREADS
To ensure that your installation proceeds smoothly-please read these
instructions carefully before you begin.
5-5/8" REF.
8-1/8" REF.
2-3/8"
CHROME
SATIN NICKEL
002
295
Replace the "YYY" with
appropriate finish code
IN MEXICO 01-800-839-12-00
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.
DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH.
DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A
CLOTH WITH A COARSE SURFACE.
CARE INSTRUCTIONS:
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

American Standard T064.502.295 Installation guide

Category
Sanitary ware
Type
Installation guide
This manual is also suitable for

American Standard T064.502.295 is a bath and shower trim kit that allows you to control the flow and temperature of water in your shower and tub. It features a pressure-balancing valve that helps to maintain a consistent water temperature, even when other water sources in your home are being used. The trim kit also includes a diverter spout that allows you to switch between the shower head and tub spout.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI