Zippity ZP19008 Installation guide

Type
Installation guide

This manual is also suitable for

WWW.ZIPPITY-OUTDOOR.COM
1
ASSEMBLY
INSTRUCTIONS
ZP19008
WWW.ZIPPITY-OUTDOOR.COM
VER. 091020
ZP19008
ASSEMBLY
INSTRUCTIONS
45 MIN
Approximate assembly me for 2 screens
Want to see a video on how to
assemble this product?
Scan the QR code
WILMINGTON
PRIVACY SCREEN


WWW.ZIPPITY-OUTDOOR.COM
2
ASSEMBLY
INSTRUCTIONS
ZP19008
k Check the inside of the larger pieces in your box for other
materials packed inside.
k 

k 
unobstructed assembling.
k 
components.
VISIT OUR WEBSITE FIRST,
SO WE CAN HELP YOU RIGHT AWAY!
Although great care has been taken to ensure proper packaging





nychgroup.com/parts

704-892-5222 / 877-234-6196
Customer service agents are available to take calls weekdays from 8am-
5pm EST. If you call outside of business hours, please leave a voicemail.

number ZP19008



so
please give us a call at 704-892-5222 / 877-234-6196.


you will need to iniate the return from the
company you originally purchased from.
GENERAL
INFORMATION
MISSING
OR
DAMAGED
PARTS?
NEED
ASSEMBLY
HELP?
NEED TO
RETURN?
IMPORTANT
WWW.ZIPPITY-OUTDOOR.COM
3
ASSEMBLY
INSTRUCTIONS
ZP19008
Middle Rail (2)

Post Anchor

Stainless
Steel Screw

Stainless Steel Screw
Joiner Clip 
Rail End Cap 

Top Rail (2)

Boom Rail (2)

Post

Post Cap 
Picket 

STEP 1:
LAY OUT MATERIALS
J
K
I
HA
B C
D E
F G
WWW.ZIPPITY-OUTDOOR.COM
4
ASSEMBLY
INSTRUCTIONS
ZP19008
STEP 2:
ASSEMBLE SCREEN FRAME
(D) (F) and
middle rails (E)
rail end caps (H) into the ends of each rail.

(B) as

slide the top and


(towards the locking
tabs).


top and middle rails. Fasten together

 (J).
 (C)



pickets lock into place.
Note: Top and Boom Rails only have picket holes on one side.
Top of screen
Align holes
J
B
H
D
E
F
C
STEP 2.1
STEP 2.2
STEP 2.3
STEP 2.4
WWW.ZIPPITY-OUTDOOR.COM
5
ASSEMBLY
INSTRUCTIONS
ZP19008
STEP 3:
FINISH ASSEMBLING SCREEN
G
STEP 3.1 STEP 3.2




posts. Insert each picket into the

Slide the post
anchors (G) 


anchor should be


Fasten together

drilled holes in the



10 in
WWW.ZIPPITY-OUTDOOR.COM
6
ASSEMBLY
INSTRUCTIONS
ZP19008





post anchors should be inserted into


STEP 4:
ASSEMBLE SCREEN FRAME
STEP 4.1 STEP 4.2
STEP 3.3
Repeat steps 1

second screen.
WWW.ZIPPITY-OUTDOOR.COM
7
ASSEMBLY
INSTRUCTIONS
ZP19008
Oponally:
1. 

hammer as illustrated.
2. 
3. 

the ground.

STEP 4.3
3
2
1
WWW.ZIPPITY-OUTDOOR.COM
8
ASSEMBLY
INSTRUCTIONS
ZP19008




may need to dig a hole large enough
to accommodate one post from

Approximately 8” in diameter and 10”
deep
STEP 4.4
STEP 4.5
WWW.ZIPPITY-OUTDOOR.COM
9
ASSEMBLY
INSTRUCTIONS
ZP19008

joiner clips (I)
 (K)
as illustrated.
45° degree

90° degree

STEP 5:
FASTEN JOINER CLIPS
STEP 3.1
K
I
WWW.ZIPPITY-OUTDOOR.COM
10
ASSEMBLY
INSTRUCTIONS
ZP19008
Push the post caps
(A)
posts to lock into
place.
STEP 6:
FASTEN POST CAPS
STEP 2.1
A
WWW.ZIPPITY-OUTDOOR.COM
12
ASSEMBLY
INSTRUCTIONS
ZP19008
WWW.ZIPPITY-OUTDOOR.COM
704-892-5222
877-234-6196
support@zippity-outdoor.com
6935 Reames Rd. Ste. K.
Charloe, NC 28216
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12

Zippity ZP19008 Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI