Installation
•M8threadedrods,2pcs.
•Lockingwashers,2pcs.
(AHKDanchorcanbeusedasanalternative,whichthe
rodsareî„®xeddirectlyinto).
1.Cutthependlebracketpipetoalengthequallingthe
distancemeasuredbetweentheconcreteceilingand
thelowerfaceofthesuspendedceilingminus50mm.
Thislengthisappropriateforadoublegypsumlayerin
theceilingandanextraallowanceof12mm.
2.Cutthethreadedrodtoalengthequallingthedistance
betweentheconcreteceilingandthelowerfaceof
thesuspendedceilingminus10mm.
3.Wheninstalling,î„®rstinstallthetopyokeforthecenter
bracketoftherailInstalltheyokeasdescribedin
theinstallationinstructionsfordirectinstallationina
concreteceiling.Inthiscase,however,drillbothholes
fortheexpansionboltsatthesametime.
4.Whendrivingintheexpansionbolts,leaveapprox.
15mmtoprotrudingbelowthenut,sothatyou
canscrewthecouplingnutontoittoitshalflength.
Counter-tightenthecouplingnutagainsttheexpansion
boltnut.
5.Attachanutapprox.20mmontothethreadedrod
andscrewthethreadedrodintothecouplingnut,until
ittouchestheexpansionbolt,andcounter-tighten
thenut.
6.Attachthebottomyokeandsecureitwithnuts.
Avoidpaintonthebottomsectionofthe
threadedrodsuntiltheinstallationiscomplete.
7.Preparetherestoftheinstallationpointsaftera
carefulandaccuratemeasuring.
Firststepoftheinstallationisnowcompleteand
theconstructionofthesuspendedceilingcanbe
completed.
Intheî„®nalinstallation,positionthedistancepipeinthe
suspendedceiling.Thispipewillprotectthesuspended
ceiling.Cutthedistancepipetoalengthcreatinga
distanceof1-5mmbetweenthelowerfaceofthe
suspendedceilingandtheupperfaceoftheinstallation
bracket;insteadofpipes,nutsandwasherscanbeused
toensuretherecommendeddistance.
3.2.3WoodenCeiling
CAUTION!
–Donotinstallrailstoawoodenceilingwith
tensionscrews,suchascoachscrews.
–Donotinstallrailstoawoodenceilingwith
plainwoodscrews,withouthavingperformed
ariskassessment.
QuickBracket
Insomecases,mountingtoaceilingtimberworkmaybe
analternativetomountingtowallorwallsupport.
Itisprovidedthattheceilingtimberworkisaccessible
fromabove.Whenbeingmountedintheceilingtimber
work,exchangeshouldbeplacedasreinforcement.When
reinforcing,itisimportanttoselectexchangewoodthat
isdimensionedtotoleratethedistancebetweentwo
ceilingbeams,sosufî„®cientcarryingcapacityisachieved.
Whenhavingmarkeduptoallceilingbracketsinthe
ceiling,youshouldexaminewhetherthereisfreespace
abovetheceilingmaterial.Whenthisisdone,holeswith
adiameterofØ12.5mmaredrilledthroughtheceiling
material.Theholesmaynowbelocalizedfromabove,
theycanbepreparedfortheexchanges,andyoumay
measurehowlongthethreadedrodsshouldbe.The
exchangeshouldcoveratleasttwoceilingbeamsoneach
sideofthesuspensionpoint.Whenusingexchanges,
two45x95mmexchangesshouldbeplacedparallelto
eachother,atadistanceof14mm,providingapassage
foranM12threadedrod.Fordeterminingthelengthof
thethreadedrod,determinetheceilingbeam’sheight+
lengthofexchangewood+ceilingmaterial+60mmfor
washerandnuts.
Placetheadaptedthreadedrodbetweentheexchange
woodandputinawasherandnutbeforethethreaded
rodisguidedfurtherdownthroughtheceilingandposition
itwithanaluminiumplate,atighteningwasherandnut
overtheexchangewood.Thealuminiumplateisscrewed
intotheexchangewoodfromthetop.Letapproximately
25mmthreadedrodprotrudedownundertheceiling
material.Aquickceilingbracketmaynowbescrewedonto
thethreadedrodbeneaththeceilingmaterial.Theceiling
bracketisfastenedwithanM12lownut.Thethreaded
rodistobescrewedentirelythroughthenut,butmust
protrudefurtherdownthatbelowtheî„®tting.
Whenmountingthebracketandnut,itisimportantto
useadhesiveonbracketaswellasnut.Whenallbrackets
aremounted,liftuptherail,adjustthelengthandsecure
it.Beforetherailisfasteneduptotheceiling,whichis
donefromabovetheceiling,itshouldbecheckedthatthe
exchangewoodisrestingonbothceilingbeams.Ifnot,
somethingshouldbeplacedbetween.
Thenutovertheexchangewoodisnowsecuredcarefully
untilthebracketliesevenlywiththeceilingmaterial.Itis
importantnottotightensomuchthattheceilingmaterial
ispulledupbetweentheceilingbeams.Whenthisis
done,asteelplateisplacedinaroundthethreadedrod
belowtheexchangewood,andthenutissecuredupinto
thesteelplate,thuslockingtheposition.
Finally,alocknutissecuredagainstthenutontheupside
oftheexchangewood.Trolleys,endstopandrailend
plugsaremountedasdescribedinsection5.2.1.
StandardBracket
•ThreadedrodsM10,2pcs.
•M10nuts4pcs.
•Yoke1pcs.
•Braces45x90x1500mm,2pcs.
1586749-C
17