BLOTZ B20-ME-006, B20_ME_006 Assembly Instructions

  • Hello! I've reviewed the instructions for the BLOTZ Middle Eastern Building models B15-ME-006 and B20-ME-006. This document provides step-by-step guidance on how to assemble the building. It includes instructions for attaching the walls, base, door, roof supports, and roof using glue and other tools. I'm ready to answer any questions you have about the assembly process or the model itself.
  • What kind of glue is required?
    What tool is needed to remove parts from the sprue?
    Can I use pegs or elastic bands during assembly?
    Is this document for both 15mm and 20mm versions of the kit?
15mm / 20mm Middle Eastern Building #6
B15-ME-006 / B20-ME-006
Please read these instructions fully before starting construction.
PVA or equivalent glue will be required to stick sections together.
Sand paper can be used to gently clean any joints.
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due care and
remember to cut away from yourself at all times.
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold pieces in place while
you allow glue to dry.
The instructions show the 15mm version of the kit, but the 20mm kit follows the same steps.
Remove the four walls of the building and the
base from the sprue.
Glue the four walls together as shown above and
attach them to the base.
Remove the four roof supports and the door
from the sprue.
Glue the door behind the opening and attach the
supports by pushing the lugs through the holes in the
walls so that they stick out as shown above.
Glue the trapdoor to the roof and place (do not
glue) the roof on top of the roof supports.
The finished building.
/