Upper Handle
A
B
Shift Lever
Chute Control
Hex Rod
Form No. 778-11823A© 2009 31AH55Q5
Chute
Handle Knobs
Chute Base
Chute Support
Bracket
Chute Control
Head
Place shift lever A.
into F6 position.
Pivot upper handle B.
into operating
position
Tighten handle C.
knobs.
A
B
C
Place chute onto
chute base and
secure with the
hardware removed
in Step 2.
Squeeze the trigger on
the joystick and rotate
the chute by hand to
face forward.
The holes
in the rear of the
chute control head
will be facing up.
Insert the round end of
the hex rod (hole pointing
upward) as far as possible
into the chute control head.
Insert the hex end of the
rod (hole pointing upward)
into the pinion gear.
Secure the round end
of the hex rod to the
chute control head as
shown, with the cotter pin
removed in Step 2.
Remove cotter pin, wing nut A.
and hex screw from chute
control head.
Remove clevis B.
pin and bow-
tie pin from
chute support
bracket.
Rotate the chute
control to
1 o’clock, so the silver
arrow on the pinion
gear faces upward.
1
4
2
5
3
6
READ AND UNDERSTAND ALL INSTRUCTION, WARNING, AND DANGER LABELS.
PARA INSTRUCCIONES EN ESPAÑOL, REFIÉRASE AL MANUAL DEL OPERADOR.
IMPORTANT: READ OPERATOR'S MANUAL AND ENGINE MANUAL THOROUGHLY
AND FOLLOW THE IMPORTANT SAFE OPERATION PRACTICES BEFORE OPERATING .
Need Help? Call 1-888-TO-HELP-U