Bryant 773470 HXJ Series Jack Wiring Installation guide

Type
Installation guide
Control No. Page of
Rev. Date:
®Hubbell Premise Wiring Instruction Sheet ®Hubbell Premise Wiring Instruction Sheet Control No. Page of
Rev. Date:
77347001 1 2
B 13SEP01
SHT: 3 OF 10 DR. NO. 773470 REV. 2
HXJ SERIES JACK WIRING
110 TOOL TERMINATION INSTRUCTIONS
Note: 22 & 24 AWG
CABLE PREPARATION
A) STRIP BACK UTP APPROXIMATELY 1-1/2"
TO 2" OF CABLE JACKET FOR LACING
PREPARATION. TRIM BACK RIP CORD, IF
NECESSARY, AND INSPECT CABLE FOR
ANY NICKS OR CUTS TO CONDUCTORS
DURING STRIPPING PROCESS.
B) FAN OUT THE CABLE PAIRS TO THE
APPROPRIATE WIRING CONFIGURATION
FOR TOWER LACING.
CONDUCTOR INSTALLATION
LACE CONDUCTORS INTO HXJ JACK AND PRESS DOWN
FIRMLY UNTIL CONDUCTOR IS SECURED INTO IDC CATCH.
USE COLOR CODED LABELS FOR PROPER PLACEMENT
OF CONDUCTORS. BRING CABLE JACKET AS CLOSE AS
POSSIBLE TO REAR HOUSING OF JACK.
1
2
CONDUCTOR TERMINATION
FOLLOWING THE ANGLE OF THE
TERMINATION TOWERS, HOLD THE
IPT110B PUNCH DOWN TOOL (SHOWN)
PERPENDICULAR TO THE HXJ JACK AND
CYCLE TOOL TO TERMINATE THE LACED
CONDUCTORS.
*NOTE: BE SURE CUTTING EDGE OF TOOL
ALWAYS FACES THE OUTSIDE EDGE
OF HXJ JACK.
3
STUFFER CAP INSTALLATION
4
T568B
WIRING LABELS: T568A
LOCATED ON SIDES LOCATED IN MIDDLE OF TOWERS
NOTE: FOR OPTIMIZED TERMINATION, LACE IN REAR
CONDUCTORS FIRST AND THEN FRONT
CONDUCTORS
3A
CONDUCTORS
SHOULD BE TRIMMED
FLUSH AGAINST
TERMINATION
TOWERS
*CUTTING
EDGE
IPT110B
TOOL
4A
STUFFER CAP
SNAP
CONDUCTORS
CABLE
JACKET
TERMINATION
TOWER
2A
REAR
FRONT
STUFFER CAP INSTALLED ON JACK
PRIOR TO TERMINATION
(REQUIRED FOR PUNCH DOWN)
T568B/USOC
LABEL
T568A LABEL
(NOT USED ON USOC JACKS)
HXJ JACK
123
3029282726252423
COMPLETELY TRIM CABLE
JACKET APPROXIMATELY
1-1/2" TO 2" FROM END
1A
CUT JACKET
HERE
AFTER TERMINATING CONDUCTORS REMOVE, STUFFER CAP
FROM BOTTOM OF JACK, PRESS FIRMLY AND SNAP ONTO
TERMINATION TOWERS.
T568B
WIRING LABELS: T568A
LOCATED ON SIDES LOCATED IN MIDDLE OF TOWERS
6 POSITION USOC 8 POSITION USOC
77347001 1 2
B 13SEP01
HXJ SERIES JACK WIRING
110 TOOL TERMINATION INSTRUCTIONS
Note: 22 & 24 AWG
CABLE PREPARATION
A) STRIP BACK UTP APPROXIMATELY 1-1/2"
TO 2" OF CABLE JACKET FOR LACING
PREPARATION. TRIM BACK RIP CORD, IF
NECESSARY, AND INSPECT CABLE FOR
ANY NICKS OR CUTS TO CONDUCTORS
DURING STRIPPING PROCESS.
B) FAN OUT THE CABLE PAIRS TO THE
APPROPRIATE WIRING CONFIGURATION
FOR TOWER LACING.
CONDUCTOR INSTALLATION
LACE CONDUCTORS INTO HXJ JACK AND PRESS DOWN
FIRMLY UNTIL CONDUCTOR IS SECURED INTO IDC CATCH.
USE COLOR CODED LABELS FOR PROPER PLACEMENT
OF CONDUCTORS. BRING CABLE JACKET AS CLOSE AS
POSSIBLE TO REAR HOUSING OF JACK.
1
2
CONDUCTOR TERMINATION
FOLLOWING THE ANGLE OF THE
TERMINATION TOWERS, HOLD THE
IPT110B PUNCH DOWN TOOL (SHOWN)
PERPENDICULAR TO THE HXJ JACK AND
CYCLE TOOL TO TERMINATE THE LACED
CONDUCTORS.
*NOTE: BE SURE CUTTING EDGE OF TOOL
ALWAYS FACES THE OUTSIDE EDGE
OF HXJ JACK.
3
STUFFER CAP INSTALLATION
4
NOTE: FOR OPTIMIZED TERMINATION, LACE IN REAR
CONDUCTORS FIRST AND THEN FRONT CONDUC-
TORS
AFTER TERMINATING CONDUCTORS REMOVE, STUFFER CAP
FROM BOTTOM OF JACK, PRESS FIRMLY AND SNAP ONTO
TERMINATION TOWERS.
IPT110B PUNCH DOWN TOOL
WITH CUTTING BIT INSTALLED.
FAN OUT CABLE PAIRS
1B
STUFFER CAP INSTALLED ON JACK
PRIOR TO TERMINATION
(REQUIRED FOR PUNCH DOWN)
T568B/USOC
LABEL
T568A LABEL
(NOT USED ON USOC JACKS)
HXJ JACK
IPT110B PUNCH DOWN TOOL
WITH CUTTING BIT INSTALLED.
123
3029282726252423
COMPLETELY TRIM CABLE
JACKET APPROXIMATELY
1-1/2" TO 2" FROM END
1A
CUT JACKET
HERE
FAN OUT CABLE PAIRS
1B
CONDUCTORS
CABLE
JACKET
TERMINATION
TOWER
2A
REAR
FRONT
3A
CONDUCTORS
SHOULD BE TRIMMED
FLUSH AGAINST
TERMINATION
TOWERS
*CUTTING
EDGE
IPT110B
TOOL
4A
STUFFER CAP
SNAP
T568BWIRING LABELS: T568A 6 POSITION USOC 8 POSITION USOC
6 POSITION USOC 8 POSITION USOC
Hubbell Premise Wiring, HUBBELL INCORPORATED (Delaware)
14 Lord's Hill Rd, Stonington CT 06378 (800) 626-0005, Fax (860) 535-8328
www.hubbell-premise.com
Hubbell Premise Wiring, HUBBELL INCORPORATED (Delaware)
14 Lord's Hill Rd, Stonington CT 06378 (800) 626-0005, Fax (860) 535-8328
www.hubbell-premise.com
Control No. Page of
Rev. Date:
Control No. Page of
Rev. Date:
SHT: 4 OF 10 DR. NO. 773470 REV. 2
77347001 2 2
B 13SEP01
TOOL-LESS TERMINATION INSTRUCTIONS
CABLE PREPARATION
A) STRIP BACK UTP APPROXIMATELY 1-1/2" TO 2"
OF CABLE JACKET FOR LACING
PREPARATION. TRIM BACK RIP CORD, IF
NECESSARY, AND INSPECT CABLE FOR ANY NICKS
OR CUTS TO CONDUCTORS DURING
STRIPPING PROCESS.
B) FAN OUT THE CABLE PAIRS TO THE
APPROPRIATE WIRING CONFIGURATION
FOR REAR TOWER LACING.
CONDUCTOR INSTALLATION
LACE CONDUCTORS INTO HXJ JACK AND PRESS DOWN
FIRMLY UNTIL CONDUCTOR IS SECURED INTO IDC CATCH.
USE COLOR CODED LABELS FOR PROPER PLACEMENT
OF CONDUCTORS. BRING CABLE JACKET AS CLOSE AS
POSSIBLE TO REAR HOUSING OF JACK.
1
2
CABLE TRIMMING INSTRUCTIONS
TRIM/CUT ALL CONDUCTORS FLUSH
TO TERMINATION TOWERS.
3
STUFFER CAP INSTALLATION
AFTER TRIMMING CONDUCTORS,
REMOVE STUFFER CAP FROM
BOTTOM OF JACK, PRESS FIRMLY
AND SNAP ONTO TERMINATION
TOWERS. TERMINATING LACED
CONDUCTORS, (AS SHOWN).
4
T568BWIRING LABELS: T568A
LOCATED ON SIDES LOCATED IN MIDDLE OF TOWERS
6 POSITION USOC 8 POSITION USOC
Note: 22 & 24 AWG
4A STUFFER CAP
SNAP
NOTE: MUST BE PARALLEL WITH
HXJ JACK AND STUFFER CAP.
NOTE: FOR OPTIMIZED TERMINATION, LACE IN REAR
CONDUCTORS FIRST AND THEN FRONT
CONDUCTORS
T568B/USOC
LABEL
STUFFER CAP INSTALLED ON JACK
PRIOR TO TERMINATION
(REQUIRED FOR PUNCH DOWN)
T568B/USOC
LABEL
T568A LABEL
(NOT USED ON USOC JACKS)
HXJ JACK
77347001 2 2
B 13SEP01
TOOL-LESS TERMINATION INSTRUCTIONS
T568BWIRING LABELS: T568A
LOCATED ON SIDES LOCATED IN MIDDLE OF TOWERS
6 POSITION USOC 8 POSITION USOC
CABLE PREPARATION
CONDUCTOR INSTALLATION
LACE CONDUCTORS INTO HXJ JACK AND PRESS DOWN
FIRMLY UNTIL CONDUCTOR IS SECURED INTO IDC CATCH.
USE COLOR CODED LABELS FOR PROPER PLACEMENT
OF CONDUCTORS. BRING CABLE JACKET AS CLOSE AS
POSSIBLE TO REAR HOUSING OF JACK.
1
2
CABLE TRIMMING INSTRUCTIONS
TRIM/CUT ALL CONDUCTORS FLUSH
TO TERMINATION TOWERS.
3
STUFFER CAP INSTALLATION
AFTER TRIMMING CONDUCTORS,
REMOVE STUFFER CAP FROM
BOTTOM OF JACK, PRESS FIRMLY
AND SNAP ONTO TERMINATION
TOWERS. TERMINATING LACED
CONDUCTORS, (AS SHOWN).
4
NOTE: FOR OPTIMIZED TERMINATION, LACE IN REAR
CONDUCTORS FIRST AND THEN FRONT
CONDUCTORS
123
3029282726252423
COMPLETELY TRIM CABLE
JACKET APPROXIMATELY
1-1/2" TO 2" FROM END
1A
CUT JACKET
HERE
FAN OUT CABLE PAIRS
1B
CONDUCTORS
2A
CABLE
JACKET
REAR
FRONT
CONDUCTORS
2A
CABLE
JACKET
REAR
FRONT
123
3029282726252423
COMPLETELY TRIM CABLE
JACKET APPROXIMATELY
1-1/2" TO 2" FROM END
1A
CUT JACKET
HERE
FAN OUT CABLE PAIRS
1B
CUTTING
TOOL
3A
CONDUCTORS SHOULD BE
TRIMMED FLUSH AGAINST
TERMINATION TOWERS
A) STRIP BACK UTP APPROXIMATELY 1-1/2" TO 2"
OF CABLE JACKET FOR LACING
PREPARATION. TRIM BACK RIP CORD, IF
NECESSARY, AND INSPECT CABLE FOR ANY NICKS
OR CUTS TO CONDUCTORS DURING
STRIPPING PROCESS.
B) FAN OUT THE CABLE PAIRS TO THE
APPROPRIATE WIRING CONFIGURATION
FOR REAR TOWER LACING.
CUTTING
TOOL
3A
CONDUCTORS SHOULD BE
TRIMMED FLUSH AGAINST
TERMINATION TOWERS
4A
STUFFER CAP
SNAP
NOTE: MUST BE PARALLEL WITH
HXJ JACK AND STUFFER CAP.
Note: 22 & 24 AWG
STUFFER CAP INSTALLED ON JACK
PRIOR TO TERMINATION
(REQUIRED FOR PUNCH DOWN)
T568B/USOC
LABEL
T568A LABEL
(NOT USED ON USOC JACKS)
HXJ JACK
HUBBELL PREMISE WIRING, HUBBELL INCORPORATED (DELAWARE)
23 CLARA DR MYSTIC, CT 06355 (800) 626-0005, FAX (860) 535-8328
WWW.HUBBELL-PREMISE.COM
HUBBELL PREMISE WIRING, HUBBELL INCORPORATED (DELAWARE)
23 CLARA DR MYSTIC, CT 06355 (800) 626-0005, FAX (860) 535-8328
WWW.HUBBELL-PREMISE.COM
  • Page 1 1
  • Page 2 2

Bryant 773470 HXJ Series Jack Wiring Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI