Mettler Toledo KES Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Mettler Toledo KES Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
2. Determine location of terminal
A Good
B Unsuitable, difficult to access
C Wrong, the terminal could easily be damaged
5. Dimension drawing
SP Support points for leveling feet of the weighing platform
K Cable conduit
Pit construction diagram
Wet pit with cleaning recess
METTLER MultiRange
KES1500/KES3000
Standard equipment
1. Determine location of weighing platform
A Good, sufficient room to load
pallets on the weighing platform
B Unsuitable, difficult to access
C Wrong, unnecessary wear on weighing
platform
Note maximum static load:
with central load:
4500 kg
with lateral load:
3000 kg
with corner load at one side:
1500 kg
Check that the location you have selected is acceptable from
a constructional viewpoint!
Load-bearing capacity of pit base: min. 1700 kg / 25 cm
C
B
A
Set up terminal to ensure ease of access.
The standard equipment of the weighing platform includes a
connection cable of length 4 m for attachment to the terminal.
3. Prepare framework pit
• Excavate framework pit of approx. 205 x 260 cm, depth approx. 35 cm.
• Ensure appropriate gradient for drain water.
Install recess with siphon as shown.
• Excavate channel of depth approx. 23 cm for cable conduit.
The cable conduit should exit from the middle of one of the longer sides
• Pipe diameter min. 50 mm.
Do not use a right-angled pipe, rather two pipes of 45°.
152 x 212 cm
ca. 205 x 260 cm
4. Concrete forming
Assemble steel pit frame.
When tightening the bolts ensure that the frame is flat.
Check that the frame is rectangular.
• Prepare stable wooden frame (see sketch for dimensions).
The steel frame must fit the wooden frame exactly.
• Install wooden frame together with steel frame in the framework pit.
The steel frame must be exactly horizontal.
When concreting ensure that the wooden frame remains in place.
After the pit base has set and the formwork removed, concrete the supports
for the leveling feet of the weighing platform
Item No. Designation Number
1 Pit brackets, lengthwise
2 Pit brackets, crosswise
3 Support beams
4 Support points
5 Cover plates for
cleaning recess
6 Separators
Hex bolts
M12x30 DIN 933
2
Mettler Instrumente AG 1989 ME-703606 Printed in West Germany 1.5/8903/33.47
A
Entrance/Exit
CC
B
Designation
2 Nuts M12 DIN 934
2 Locking plate
2 Dowels
6 Screws
6 Washers
2 Rubber grommets
2 Clamping plates
6 Transport hooks
24 Pit construction instructions
x
22 cm
212 cm
152 cm
x
Section X-X
30 cm
212 cm
152 cm
10 cm
152 cm
B
A
A
Section A-A
Section B-B
B
2
6
SP SP
1
4
5
4
22 cm
30 cm
22 cm
30 cm
4
K
3
4
Number
4
1
4
4
4
2
8
2
/