ABB Relion 650 Series REL650 Commissioning Manual

Type
Commissioning Manual
Relion
®
650 series
Line distance protection REL650 ANSI
Commissioning Manual
Document ID: 1MRK 506 331-UUS
Issued: June 2012
Revision: A
Product version: 1.2
© Copyright 2012 ABB. All rights reserved
Copyright
This document and parts thereof must not be reproduced or copied without written
permission from ABB, and the contents thereof must not be imparted to a third party,
nor used for any unauthorized purpose.
The software and hardware described in this document is furnished under a license and
may be used or disclosed only in accordance with the terms of such license.
Trademarks
ABB and Relion are registered trademarks of the ABB Group. All other brand or
product names mentioned in this document may be trademarks or registered
trademarks of their respective holders.
Warranty
Please inquire about the terms of warranty from your nearest ABB representative.
ABB Inc.
1021 Main Campus Drive
Raleigh, NC 27606, USA
Toll Free: 1-800-HELP-365, menu option #8
ABB Inc.
3450 Harvester Road
Burlington, ON L7N 3W5, Canada
Toll Free: 1-800-HELP-365, menu option #8
ABB Mexico S.A. de C.V.
Paseo de las Americas No. 31 Lomas Verdes 3a secc.
53125, Naucalpan, Estado De Mexico, MEXICO
Phone: (+1) 440-585-7804, menu option #8
Conformity
This product complies with the directive of the Council of the European Communities
on the approximation of the laws of the Member States relating to electromagnetic
compatibility (EMC Directive 2004/108/EC) and concerning electrical equipment for
use within specified voltage limits (Low-voltage directive 2006/95/EC). This
conformity is the result of tests conducted by ABB in accordance with the product
standards EN 50263 and EN 60255-26 for the EMC directive, and with the product
standards EN 60255-1 and EN 60255-27 for the low voltage directive. The product is
designed in accordance with the international standards of the IEC 60255 series and
ANSI C37.90. The DNP protocol implementation in the IED conforms to "DNP3
Intelligent Electronic Device (IED) Certification Procedure Subset Level 2", available
at
www.dnp.org .
Disclaimer
The data, examples and diagrams in this manual are included solely for the concept or
product description and are not to be deemed as a statement of guaranteed properties.
All persons responsible for applying the equipment addressed in this manual must
satisfy themselves that each intended application is suitable and acceptable, including
that any applicable safety or other operational requirements are complied with. In
particular, any risks in applications where a system failure and/or product failure would
create a risk for harm to property or persons (including but not limited to personal
injuries or death) shall be the sole responsibility of the person or entity applying the
equipment, and those so responsible are hereby requested to ensure that all measures
are taken to exclude or mitigate such risks.
This document has been carefully checked by ABB but deviations cannot be
completely ruled out. In case any errors are detected, the reader is kindly requested to
notify the manufacturer. Other than under explicit contractual commitments, in no
event shall ABB be responsible or liable for any loss or damage resulting from the use
of this manual or the application of the equipment.
Safety information
Dangerous voltages can occur on the connectors, even though the
auxiliary voltage has been disconnected.
Non-observance can result in death, personal injury or substantial
property damage.
Only a competent electrician is allowed to carry out the electrical
installation.
National and local electrical safety regulations must always be followed.
The frame of the IED has to be carefully grounded.
Whenever changes are made in the IED, measures should be taken to
avoid inadvertent tripping.
The IED contains components which are sensitive to electrostatic
discharge. Unnecessary touching of electronic components must
therefore be avoided.
Table of contents
Section 1 Introduction............................................................................9
This manual..............................................................................................9
Intended audience....................................................................................9
Product documentation...........................................................................10
Product documentation set................................................................10
Document revision history.................................................................11
Related documents............................................................................12
Symbols and conventions.......................................................................12
Symbols.............................................................................................12
Document conventions......................................................................13
Section 2 Available functions..............................................................15
Main protection functions........................................................................15
Back-up protection functions..................................................................16
Control and monitoring functions............................................................17
Communication.......................................................................................20
Basic IED functions.................................................................................22
Section 3 Starting up...........................................................................23
Factory and site acceptance testing.......................................................23
Commissioning checklist........................................................................23
Checking the power supply.....................................................................24
Energizing the IED..................................................................................24
Checking the IED operation...............................................................24
IED start-up sequence.......................................................................24
Setting up communication between PCM600 and the IED.....................25
Writing an application configuration to the IED.......................................30
Checking CT circuits...............................................................................31
Checking VT circuits...............................................................................32
Checking the RTXP test switch .............................................................32
Checking binary input and output circuits...............................................33
Binary input circuits............................................................................33
Binary output circuits.........................................................................33
Checking optical connections.................................................................33
Section 4 Establishing connection and verifying the IEC 61850
station communication.........................................................35
Table of contents
1
Commissioning Manual
Setting the station communication..........................................................35
Verifying the communication...................................................................35
Section 5 Testing IED operation..........................................................37
Preparing the IED to verify settings........................................................37
Activating test mode...............................................................................39
Preparing the connection to the test equipment.....................................39
Connecting the test equipment to the IED..............................................40
Releasing the function to be tested........................................................41
Verifying analog primary and secondary measurement.........................42
Testing protection functionality...............................................................43
Section 6 Testing functionality.............................................................45
Testing disturbance report......................................................................45
Introduction........................................................................................45
Disturbance report settings................................................................45
Identifying the function to test in the technical reference manual ..........45
Testing impedance protection functions.................................................46
Five zone distance protection, quadrilateral and mho
characteristic ZQMPDIS (21)............................................................46
Quadrilateral characteristics.........................................................46
Mho characteristics.......................................................................49
Measuring the operating limit of set values with shaped load
encroachment characteristics.......................................................51
Measuring the operate time of distance protection zones............51
Completing the test.......................................................................51
Phase selection with load encroachment, quadrilateral
characteristic FDPSPDIS (21)...........................................................52
Measuring the operate limit of set values.....................................55
Completing the test.......................................................................55
Faulty phase identification with load encroachment FMPSPDIS
(21)....................................................................................................55
Phase preference logic PPLPHIZ .....................................................55
Completing the test.......................................................................57
Power swing detection ZMRPSB (68)...............................................57
Verifying the settings....................................................................58
Testing the power swing detection function ZMRPSB (68)..........59
Testing the
tR1
timer....................................................................59
Completing the test.......................................................................60
Automatic switch onto fault logic, voltage and current based
ZCVPSOF..........................................................................................60
Table of contents
2
Commissioning Manual
External activation of ZCVPSOF..................................................60
Automatic initiation of ZCVPSOF.................................................61
Completing the test.......................................................................61
Testing current protection functions........................................................61
Instantaneous phase overcurrent protection 3-phase output
PHPIOC (50)......................................................................................61
Measuring the operate limit of set values.....................................62
Completing the test.......................................................................62
Instantaneous phase overcurrent protection phase segregated
output SPTPIOC (50)........................................................................62
Completing the test.......................................................................63
Four step phase overcurrent protection 3-phase output
OC4PTOC (51_67)............................................................................63
Verifying the settings....................................................................63
Completing the test.......................................................................64
Four step phase overcurrent protection phase segregated
output OC4SPTOC (51_67)...............................................................64
Verifying the settings....................................................................65
Completing the test.......................................................................66
Instantaneous residual overcurrent protection EFPIOC (50N)..........66
Measuring the operate limit of set values.....................................66
Completing the test.......................................................................67
Four step residual overcurrent protection, zero or negative
sequence direction EF4PTOC (51N/67N).........................................67
Four step directional residual overcurrent protection ..................67
Four step non-directional residual overcurrent protection............68
Completing the test.......................................................................68
Sensitive directional residual overcurrent and power protection
SDEPSDE (67N)................................................................................68
Measuring the operate and time limit for set values.....................68
Completing the test.......................................................................74
Thermal overload protection, one time constant, Fahrenheit/
Celsius LFPTTR/LCPTTR (26)..........................................................74
Testing the protection without external temperature
compensation (NonComp)............................................................74
Completing the test.......................................................................75
Breaker failure protection, phase segregated activation and
output CCRBRF (50BF).....................................................................75
Checking the phase current operate value,
Pickup_PH
...............76
Checking the residual (ground fault) current operate value
Pickup_N
set below
Pickup_PH
....................................................76
Table of contents
3
Commissioning Manual
Checking the re-trip and back-up times........................................76
Verifying the re-trip mode.............................................................77
Verifying the back-up trip mode....................................................78
Verifying the case
RetripMode
=
Contact
.....................................79
Verifying the function mode
Current&Contact
..............................79
Completing the test.......................................................................80
Breaker failure protection, phase segregated activation and
output CSPRBRF (50BF)...................................................................80
Checking the phase current operate value, Pickup_PH...............81
Checking the residual (GF) current operate value
IN>
set
below IP>......................................................................................81
Checking the re-trip and back-up times........................................81
Verifying the
RetripMode
..............................................................82
Verifying the case
RetripMode
=
No CB Pos Check
....................83
Verifying the function mode
Current&Contact
..............................83
Checking the case with fault current below set value
Pickup_BlkCont
............................................................................83
Checking the phase current operate value,
Pickup_PH
...............84
Completing the test.......................................................................84
Stub protection STBPTOC (50STB)..................................................84
Measuring the operate limit of set values.....................................85
Completing the test.......................................................................85
Pole discrepancy protection CCRPLD (52PD)..................................86
Verifying the settings....................................................................86
Completing the test.......................................................................86
Broken conductor check BRCPTOC (46)..........................................86
Measuring the operate and time limit of set values......................87
Completing the test.......................................................................87
Directional underpower protection GUPPDUP (37)...........................87
Verifying the settings....................................................................88
Completing the test.......................................................................89
Directional overpower protection GOPPDOP (32)............................90
Verifying the settings....................................................................90
Completing the test.......................................................................91
Testing voltage protection functions.......................................................91
Two step undervoltage protection UV2PTUV (27)............................91
Verifying the setting......................................................................91
Completing the test.......................................................................92
Two step overvoltage protection OV2PTOV (59)..............................92
Verifying the settings....................................................................92
Table of contents
4
Commissioning Manual
Completing the test.......................................................................92
Two step residual overvoltage protection ROV2PTOV (59N)...........93
Verifying the settings....................................................................93
Completing the test.......................................................................93
Loss of voltage check LOVPTUV (27)...............................................93
Measuring the operate limit of set values.....................................94
Completing the test.......................................................................94
Testing frequency protection functions...................................................95
Underfrequency protection SAPTUF (81)..........................................95
Verifying the settings....................................................................95
Completing the test.......................................................................96
Overfrequency protection SAPTOF (81)...........................................96
Verifying the settings....................................................................96
Completing the test.......................................................................97
Rate-of-change frequency protection SAPFRC (81).........................97
Verifying the settings....................................................................97
Completing the test.......................................................................98
Testing secondary system supervision functions...................................98
Current circuit supervision CCSRDIF (87).........................................98
Verifying the settings....................................................................99
Completing the test.......................................................................99
Fuse failure supervision SDDRFUF...................................................99
Checking that the binary inputs and outputs operate as
expected ....................................................................................100
Measuring the operate value for the negative sequence
function ......................................................................................100
Measuring the operate value for the zero-sequence
function ......................................................................................101
Checking the operation of the dv/dt and di/dt based
function ......................................................................................101
Completing the test.....................................................................102
Testing control functions.......................................................................102
Synchrocheck, energizing check, and synchronizing SESRSYN
(25)..................................................................................................103
Testing the synchronizing function.............................................105
Testing the synchrocheck check................................................106
Testing the energizing check......................................................110
Testing the voltage selection......................................................111
Completing the test.....................................................................112
Autorecloser for 3-phase operation SMBRREC (79).......................112
Preparation of the verification ....................................................114
Table of contents
5
Commissioning Manual
Switching the autorecloser for 3-phase operation function to
Enabled
and
Disabled
................................................................115
Verifying the autorecloser for 3-phase operation function
SMBRREC (79)..........................................................................115
Checking the reclosing conditions .............................................116
Completing the test.....................................................................117
Autorecloser for 1/3-phase operation STBRREC (79).....................117
Preparation of the verification.....................................................120
Switching the auto-reclosing function
Enabled
and
Disabled
......................................................................................121
Verifying the auto-reclosing function..........................................121
Checking the reclosing conditions..............................................122
Checking the influence of the INHIBIT signal.............................122
Check closing onto a fault..........................................................122
Checking the influence of CB not ready for reclosing.................122
Checking the influence of synchronism check (at three-pole
reclosing)....................................................................................123
Restoring equipment..................................................................123
Completing the test.....................................................................123
Testing scheme communication functions............................................124
Scheme communication logic with delta based blocking
scheme signal transmit ZCPSCH (85).............................................124
Testing permissive underreaching..............................................124
Testing permissive overreaching................................................124
Testing blocking scheme............................................................125
Testing delta blocking scheme...................................................125
Checking of unblocking logic......................................................126
Completing the test.....................................................................126
Current reversal and WEI logic for distance protection 3-phase
ZCRWPSCH (85).............................................................................126
Current reversal logic.................................................................127
Weak-end infeed logic at permissive schemes..........................127
Testing conditions.......................................................................128
Completing the test.....................................................................128
Current reversal and WEI logic for distance protection, phase
segregated ZCWSPSCH (85)..........................................................129
Current reversal logic.................................................................129
Weak-end infeed logic at permissive schemes..........................130
Testing conditions.......................................................................130
Completing the test.....................................................................130
Local acceleration logic ZCLCPLAL................................................131
Table of contents
6
Commissioning Manual
Verifying the settings..................................................................131
Completing the test.....................................................................131
Scheme communication logic for residual overcurrent
protection ECPSCH (85).................................................................131
Testing the directional comparison logic function.......................132
Completing the test.....................................................................133
Current reversal and weak-end infeed logic for residual
overcurrent protection ECRWPSCH (85)........................................134
Testing the current reversal logic...............................................134
Testing the weak-end infeed logic..............................................134
Completing the test.....................................................................136
Testing logic functions..........................................................................136
Tripping logic, common 3-phase output SMPPTRC (94)................136
Three-phase operating mode.....................................................137
Circuit breaker lockout................................................................137
Completing the test.....................................................................137
Tripping logic phase segregated output SPTPTRC (94).................138
1p/3p operating mode.................................................................138
Circuit breaker lockout................................................................139
Completing the test.....................................................................139
Testing monitoring functions.................................................................140
Event counter CNTGGIO.................................................................140
Fault locator LMBRFLO...................................................................140
Measuring the operate limit........................................................141
Completing the test.....................................................................142
Testing metering functions....................................................................142
Pulse counter PCGGIO...................................................................142
Exit test mode.......................................................................................142
Section 7 Commissioning and maintenance of the fault
clearing system.................................................................143
Commissioning and maintenance of the fault clearing system.............143
Commissioning tests........................................................................143
Periodic maintenance tests.............................................................143
Visual inspection.........................................................................144
Maintenance tests......................................................................144
Section 8 Troubleshooting ................................................................149
Fault tracing..........................................................................................149
Identifying hardware errors..............................................................149
Identifying runtime errors.................................................................149
Table of contents
7
Commissioning Manual
Identifying communication errors.....................................................149
Checking the communication link operation...............................150
Checking the time synchronization.............................................150
Running the display test..................................................................151
Indication messages.............................................................................151
Internal faults...................................................................................151
Warnings..........................................................................................152
Additional indications.......................................................................153
Correction procedures..........................................................................153
Changing and setting the password................................................153
Identifying IED application problems...............................................153
Inspecting the wiring...................................................................154
Section 9 Glossary............................................................................159
Table of contents
8
Commissioning Manual
Section 1 Introduction
1.1 This manual
The commissioning manual contains instructions on how to commission the IED. The
manual can also be used by system engineers and maintenance personnel for assistance
during the testing phase. The manual provides procedures for checking of external
circuitry and energizing the IED, parameter setting and configuration as well as
verifying settings by secondary injection. The manual describes the process of testing
an IED in a substation which is not in service. The chapters are organized in
chronological order in which the IED should be commissioned.
1.2 Intended audience
This manual addresses the personnel responsible for commissioning, maintenance and
taking the IED in and out of normal service.
The commissioning personnel must have a basic knowledge of handling electronic
equipment. The commissioning and maintenance personnel must be well experienced
in using protection equipment, test equipment, protection functions and the configured
functional logics in the IED.
1MRK 506 331-UUS A Section 1
Introduction
9
Commissioning Manual
1.3 Product documentation
1.3.1 Product documentation set
Planning & purchase
Engineering
Installing
Commissioning
Operation
Maintenance
Decommissioning
deinstalling
&
disposal
Application manual
Operation manual
Installation manual
Service manual
Engineering manual
Commissioning manual
Communication protocol
manual
Technical manual
Planning & purchase
Engineering
Installing
Commissioning
Operation
Maintenance
Decommissioning
deinstalling
&
disposal
Planning & purchase
Engineering
Installing
Commissioning
Operation
Maintenance
Decommissioning
deinstalling
&
disposal
Application manualApplication manual
Operation manualOperation manual
Installation manualInstallation manual
Service manualService manual
Engineering manualEngineering manual
Commissioning manualCommissioning manual
Communication protocol
manual
Communication protocol
manual
Technical manualTechnical manual
en07000220.vsd
IEC07000220 V1 EN
Figure 1: The intended use of manuals in different lifecycles
The engineering manual contains instructions on how to engineer the IEDs using the
different tools in PCM600. The manual provides instructions on how to set up a
PCM600 project and insert IEDs to the project structure. The manual also recommends
a sequence for engineering of protection and control functions, LHMI functions as well
as communication engineering for IEC 60870-5-103, IEC 61850 and DNP3.
The installation manual contains instructions on how to install the IED. The manual
provides procedures for mechanical and electrical installation. The chapters are
organized in chronological order in which the IED should be installed.
The commissioning manual contains instructions on how to commission the IED. The
manual can also be used by system engineers and maintenance personnel for assistance
Section 1 1MRK 506 331-UUS A
Introduction
10
Commissioning Manual
during the testing phase. The manual provides procedures for checking of external
circuitry and energizing the IED, parameter setting and configuration as well as
verifying settings by secondary injection. The manual describes the process of testing
an IED in a substation which is not in service. The chapters are organized in
chronological order in which the IED should be commissioned.
The operation manual contains instructions on how to operate the IED once it has been
commissioned. The manual provides instructions for monitoring, controlling and
setting the IED. The manual also describes how to identify disturbances and how to
view calculated and measured power grid data to determine the cause of a fault.
The service manual contains instructions on how to service and maintain the IED. The
manual also provides procedures for de-energizing, de-commissioning and disposal of
the IED.
The application manual contains application descriptions and setting guidelines sorted
per function. The manual can be used to find out when and for what purpose a typical
protection function can be used. The manual can also be used when calculating settings.
The technical manual contains application and functionality descriptions and lists
function blocks, logic diagrams, input and output signals, setting parameters and
technical data sorted per function. The manual can be used as a technical reference
during the engineering phase, installation and commissioning phase, and during normal
service.
The communication protocol manual describes a communication protocol supported by
the IED. The manual concentrates on vendor-specific implementations.
The point list manual describes the outlook and properties of the data points specific to
the IED. The manual should be used in conjunction with the corresponding
communication protocol manual.
1.3.2 Document revision history
Document revision/date
History
-/March 2012 First release
A/June 2012 Minor corrections made
1MRK 506 331-UUS A Section 1
Introduction
11
Commissioning Manual
1.3.3 Related documents
Documents related to REL650 Identity number
Application manual 1MRK 506 329-UUS
Technical manual 1MRK 506 330-UUS
Commissioning manual 1MRK 506 331-UUS
Product Guide, configured 1MRK 506 332-BUS
Type test certificate 1MRK 506 332-TUS
Application notes for Circuit Breaker Control 1MRG006806
650 series manuals Identity number
Communication protocol manual, DNP3 1MRK 511 257-UUS
Communication protocol manual, IEC 61850–8–1 1MRK 511 258-UUS
Communication protocol manual, IEC 60870-5-103 1MRK 511 259-UUS
Cyber Security deployment guidelines 1MRK 511 268-UUS
Point list manual, DNP3 1MRK 511 260-UUS
Engineering manual 1MRK 511 261-UUS
Operation manual 1MRK 500 095-UUS
Installation manual 1MRK 514 015-UUS
1.4 Symbols and conventions
1.4.1 Symbols
The electrical warning icon indicates the presence of a hazard which
could result in electrical shock.
The warning icon indicates the presence of a hazard which could result
in personal injury.
The caution icon indicates important information or warning related to
the concept discussed in the text. It might indicate the presence of a
hazard which could result in corruption of software or damage to
equipment or property.
Section 1 1MRK 506 331-UUS A
Introduction
12
Commissioning Manual
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155
  • Page 156 156
  • Page 157 157
  • Page 158 158
  • Page 159 159
  • Page 160 160
  • Page 161 161
  • Page 162 162
  • Page 163 163
  • Page 164 164
  • Page 165 165
  • Page 166 166
  • Page 167 167
  • Page 168 168
  • Page 169 169
  • Page 170 170
  • Page 171 171
  • Page 172 172
  • Page 173 173
  • Page 174 174
  • Page 175 175
  • Page 176 176

ABB Relion 650 Series REL650 Commissioning Manual

Type
Commissioning Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI