ABB REL650 series Commissioning Manual

Type
Commissioning Manual
RELION® 650 SERIES
Line distance protection REL650
Version 2.2
Commissioning manual
Document ID: 1MRK 506 383-UEN
Issued: October 2017
Revision: A
Product version: 2.2.1
© Copyright 2017 ABB. All rights reserved
Copyright
This document and parts thereof must not be reproduced or copied without written
permission from ABB, and the contents thereof must not be imparted to a third
party, nor used for any unauthorized purpose.
The software and hardware described in this document is furnished under a license
and may be used or disclosed only in accordance with the terms of such license.
This product includes software developed by the OpenSSL Project for use in the
OpenSSL Toolkit. (http://www.openssl.org/) This product includes cryptographic
software written/developed by: Eric Young ([email protected]) and Tim Hudson
Trademarks
ABB and Relion are registered trademarks of the ABB Group. All other brand or
product names mentioned in this document may be trademarks or registered
trademarks of their respective holders.
Warranty
Please inquire about the terms of warranty from your nearest ABB representative.
Disclaimer
The data, examples and diagrams in this manual are included solely for the concept
or product description and are not to be deemed as a statement of guaranteed
properties. All persons responsible for applying the equipment addressed in this
manual must satisfy themselves that each intended application is suitable and
acceptable, including that any applicable safety or other operational requirements
are complied with. In particular, any risks in applications where a system failure
and/or product failure would create a risk for harm to property or persons
(including but not limited to personal injuries or death) shall be the sole
responsibility of the person or entity applying the equipment, and those so
responsible are hereby requested to ensure that all measures are taken to exclude or
mitigate such risks.
This document has been carefully checked by ABB but deviations cannot be
completely ruled out. In case any errors are detected, the reader is kindly requested
to notify the manufacturer. Other than under explicit contractual commitments, in
no event shall ABB be responsible or liable for any loss or damage resulting from
the use of this manual or the application of the equipment.
Conformity
This product complies with the directive of the Council of the European
Communities on the approximation of the laws of the Member States relating to
electromagnetic compatibility (EMC Directive 2004/108/EC) and concerning
electrical equipment for use within specified voltage limits (Low-voltage directive
2006/95/EC). This conformity is the result of tests conducted by ABB in
accordance with the product standard EN 60255-26 for the EMC directive, and
with the product standards EN 60255-1 and EN 60255-27 for the low voltage
directive. The product is designed in accordance with the international standards of
the IEC 60255 series.
Table of contents
Section 1 Introduction.......................................................................9
This manual........................................................................................ 9
Intended audience.............................................................................. 9
Product documentation.....................................................................10
Product documentation set..........................................................10
Document revision history........................................................... 11
Related documents......................................................................12
Document symbols and conventions................................................12
Symbols.......................................................................................12
Document conventions................................................................ 13
IEC 61850 edition 1 / edition 2 mapping...........................................14
Section 2 Safety information.......................................................... 19
Symbols on the product....................................................................19
Warnings.......................................................................................... 19
Caution signs....................................................................................21
Note signs.........................................................................................21
Section 3 Available functions......................................................... 23
Main protection functions..................................................................23
Back-up protection functions............................................................ 24
Control and monitoring functions......................................................25
Communication.................................................................................28
Basic IED functions.......................................................................... 30
Section 4 Starting up......................................................................33
Factory and site acceptance testing................................................. 33
Commissioning checklist.................................................................. 33
Checking the power supply.............................................................. 34
Energizing the IED............................................................................34
Checking the IED operation.........................................................34
IED start-up sequence.................................................................35
Setting up communication between PCM600 and the IED...............35
Writing an application configuration to the IED.................................40
Checking CT circuits.........................................................................41
Checking VT circuits.........................................................................42
Using the RTXP test switch.............................................................. 42
Checking the binary input/output circuits..........................................43
Binary input circuits..................................................................... 43
Binary output circuits................................................................... 43
Table of contents
Line distance protection REL650 2.2 IEC 1
Commissioning manual
Checking optical connections........................................................... 44
Section 5 Configuring the IED and changing settings....................45
Overview...........................................................................................45
Configuring analog CT inputs........................................................... 46
Supervision of input/output modules................................................ 46
Section 6 Establishing connection and verifying the SPA/IEC
communication............................................................... 49
Entering settings...............................................................................49
Entering SPA settings..................................................................49
Entering IEC settings...................................................................49
Verifying the communication............................................................ 50
Verifying SPA communication..................................................... 50
Verifying IEC communication...................................................... 50
Fibre optic loop................................................................................. 51
Optical budget calculation for serial communication with
SPA/IEC .......................................................................................... 51
Section 7 Establishing connection and verifying the LON
communication............................................................... 53
Communication via the rear ports ....................................................53
LON communication.................................................................... 53
The LON Protocol........................................................................54
Hardware and software modules.................................................54
Optical budget calculation for serial communication with LON ........56
Section 8 Testing IED operation.....................................................57
Preparing for test.............................................................................. 57
Requirements.............................................................................. 57
Preparing the IED to verify settings............................................. 59
Activating the test mode................................................................... 60
Preparing the connection to the test equipment............................... 60
Connecting the test equipment to the IED........................................61
Releasing the function to be tested.................................................. 62
Verifying analog primary and secondary measurement................... 63
Testing the protection functionality................................................... 64
Forcing of binary input/output signals for testing.............................. 64
Forcing concept........................................................................... 64
How to enable forcing..................................................................64
Enable forcing by using LHMI................................................ 64
Enable forcing using TESTMODE function block...................65
How to change binary input/output signals using forcing............ 65
Forcing by using LHMI........................................................... 65
Forcing by using PCM600...................................................... 67
Table of contents
2 Line distance protection REL650 2.2 IEC
Commissioning manual
How to undo forcing changes and return the IED to normal
operation......................................................................................69
Undo forcing by using TESTMODE component.....................69
Undo forcing by using LHMI................................................... 69
Undo forcing by using PCM600..............................................69
Section 9 Testing functionality by secondary injection...................71
Testing disturbance report................................................................71
Introduction..................................................................................71
Disturbance report settings..........................................................71
Disturbance recorder (DR).......................................................... 71
Event recorder (ER) and Event list (EL)...................................... 72
Identifying the function to test in the technical reference manual ....73
Impedance protection....................................................................... 73
Distance protection zones, quadrilateral and mho
characteristic ZMFPDIS...............................................................73
Measuring the operating limit of set values............................ 76
Measuring the operating time of distance protection zones... 77
Completing the test................................................................ 77
Power swing detection ZMRPSB ................................................78
Verifying the settings.............................................................. 79
Testing the power swing detection function ZMRPSB .......... 80
Testing the
tR1
timer.............................................................. 80
Testing the block input, interaction between FDPSPDIS
or FRPSPDIS and ZMRPSB ................................................. 81
Completing the test................................................................ 81
Out-of-step protection OOSPPAM...............................................81
Verifying the settings.............................................................. 82
Test of point RE (R
FwdR
, X
FwdX
)............................................. 86
Test of the boundary between zone 1 and zone 2, which
is defined by the parameter
ReachZ1
.................................... 90
Test of the point SE (R
RvsR
, X
RvsX
)........................................ 95
Automatic switch onto fault logic ZCVPSOF............................... 99
Activating ZCVPSOF externally........................................... 100
Initiating ZCVPSOF automatically and setting mode to
impedance............................................................................100
Initiating ZCVPSOF automatically and setting mode to
UILevel ................................................................................ 100
Completing the test.............................................................. 100
Phase preference logic PPL2PHIZ............................................101
Completing the test....................................................................102
Current protection...........................................................................102
Instantaneous phase overcurrent protection 3-phase output
PHPIOC ....................................................................................102
Table of contents
Line distance protection REL650 2.2 IEC 3
Commissioning manual
Measuring the operate limit of set values.............................102
Completing the test.............................................................. 103
Directional phase overcurrent protection, four steps
OC4PTOC................................................................................. 103
Verifying the settings............................................................ 103
Completing the test.............................................................. 105
Instantaneous residual overcurrent protection EFPIOC ........... 105
Measuring the operate limit of set values.............................105
Completing the test.............................................................. 105
Four step residual overcurrent protection, (Zero sequence
or negative sequence directionality) EF4PTOC ....................... 106
Four step directional earth fault protection........................... 106
Four step non-directional earth fault protection....................107
Completing the test.............................................................. 107
Four step negative sequence overcurrent protection
NS4PTOC .................................................................................107
Completing the test.............................................................. 108
Sensitive directional residual overcurrent and power
protection SDEPSDE ................................................................108
Measuring the operate and time limit for set values.............109
Completing the test.............................................................. 114
Breaker failure protection, phase segregated activation and
output CCRBRF.........................................................................114
Checking the phase current operate value,
IP>
................... 114
Checking the residual (earth fault) current operate value
IN>
set below
IP>
................................................................. 114
Checking the re-trip and back-up times................................115
Verifying the re-trip mode..................................................... 115
Verifying the back-up trip mode............................................116
Verifying instantaneous back-up trip at CB faulty condition. 117
Verifying the function mode
Current/Contact
....................... 117
Completing the test.............................................................. 118
Pole discordance protection CCPDSC...................................... 118
Verifying the settings............................................................ 118
Completing the test.............................................................. 119
Voltage-restrained time overcurrent protection VRPVOC......... 119
Verifying the settings............................................................ 119
Completing the test.............................................................. 123
Voltage protection...........................................................................123
Two step undervoltage protection UV2PTUV ...........................123
Verifying the settings............................................................ 123
Completing the test.............................................................. 124
Two step overvoltage protection OV2PTOV .............................124
Verifying the settings............................................................ 124
Table of contents
4 Line distance protection REL650 2.2 IEC
Commissioning manual
Extended testing...................................................................125
Completing the test.............................................................. 125
Two step residual overvoltage protection ROV2PTOV ............ 125
Verifying the settings............................................................ 126
Completing the test.............................................................. 126
Frequency protection......................................................................126
Underfrequency protection SAPTUF ........................................ 126
Verifying the settings............................................................ 126
Completing the test.............................................................. 128
Overfrequency protection SAPTOF ..........................................128
Verifying the settings............................................................ 128
Completing the test.............................................................. 129
Rate-of-change frequency protection SAPFRC ........................129
Verifying the settings............................................................ 129
Completing the test.............................................................. 130
Secondary system supervision.......................................................130
Current circuit supervision CCSSPVC.......................................130
Verifying the settings............................................................ 130
Completing the test.............................................................. 130
Fuse failure supervision FUFSPVC...........................................130
Checking that the binary inputs and outputs operate as
expected ..............................................................................131
Measuring the operate value for the negative sequence
function ................................................................................131
Measuring the operate value for the zero-sequence
function ................................................................................133
Measuring the operate value for the dead line detection
function.................................................................................133
Checking the operation of the du/dt and di/dt based
function ................................................................................134
Completing the test.............................................................. 135
Control............................................................................................ 135
Synchrocheck, energizing check, and synchronizing
SESRSYN................................................................................. 135
Testing the synchronizing function....................................... 136
Testing the synchrocheck functionality.................................137
Testing the energizing check................................................139
Testing the voltage selection................................................141
Completing the test.............................................................. 141
Autorecloser for 1/2/3-phase operation SMBRREC ................. 141
Preparation of the verification ..............................................143
Switching the auto recloser to On and Off
On
and
Off
......... 144
Verifying the auto recloser ...................................................144
Checking the auto reclosing conditions................................145
Table of contents
Line distance protection REL650 2.2 IEC 5
Commissioning manual
Completing the test.............................................................. 147
Apparatus control APC.............................................................. 147
Single command, 16 signals SINGLECMD............................... 147
Scheme communication................................................................. 147
Scheme communication logic for distance or overcurrent
protection ZCPSCH .................................................................. 147
Testing permissive underreaching....................................... 148
Testing permissive overreaching..........................................148
Testing blocking scheme......................................................149
Testing delta blocking scheme............................................. 149
Checking of unblocking logic................................................150
Completing the test.............................................................. 150
Current reversal and Weak-end infeed logic for distance
protection 3-phase ZCRWPSCH .............................................. 150
Current reversal logic........................................................... 150
Weak end infeed logic.......................................................... 151
Completing the test.............................................................. 152
Local acceleration logic ZCLCPSCH.........................................152
Verifying the settings............................................................ 152
Completing the test.............................................................. 153
Scheme communication logic for residual overcurrent
protection ECPSCH ..................................................................153
Testing the directional comparison logic function.................153
Completing the test.............................................................. 154
Current reversal and weak-end infeed logic for residual
overcurrent protection ECRWPSCH .........................................155
Testing the current reversal logic......................................... 155
Testing the weak-end infeed logic........................................155
Completing the test.............................................................. 157
Logic............................................................................................... 157
Tripping logic, common 3-phase output SMPPTRC .................157
3 phase operating mode.......................................................157
1ph/3ph operating mode...................................................... 158
1ph/2ph/3ph operating mode............................................... 159
Circuit breaker lockout..........................................................160
Completing the test.............................................................. 160
Monitoring.......................................................................................161
Gas medium supervision SSIMG.............................................. 161
Testing the gas medium supervision for pressure alarm
and pressure lockout conditions...........................................161
Testing the gas medium supervision for temperature
alarm and temperature lock out conditions.......................... 162
Completing the test.............................................................. 162
Liquid medium supervision SSIML............................................ 162
Table of contents
6 Line distance protection REL650 2.2 IEC
Commissioning manual
Testing the liquid medium supervision for level alarm
and level lockout conditions................................................. 162
Testing the liquid medium supervision for temperature
alarm and temperature lock out conditions.......................... 163
Completing the test.............................................................. 163
Breaker monitoring SSCBR.......................................................163
Verifying the settings............................................................ 164
Completing the test.............................................................. 165
Event function EVENT...............................................................166
Fault locator LMBRFLO.............................................................166
Measuring the operate limit.................................................. 167
Completing the test.............................................................. 167
Limit counter L4UFCNT.............................................................167
Completing the test.............................................................. 168
Metering..........................................................................................168
Pulse-counter logic PCFCNT.................................................... 168
Function for energy calculation and demand handling
ETPMMTR.................................................................................168
Verifying the settings............................................................ 168
Completing the test.............................................................. 170
Station communication................................................................... 170
Multiple command and transmit MULTICMDRCV /
MULTICMDSND........................................................................ 170
Basic IED functions........................................................................ 170
Parameter setting group handling SETGRPS........................... 170
Verifying the settings............................................................ 170
Completing the test.............................................................. 171
Exit test mode.................................................................................171
Section 10 Checking the directionality........................................... 173
Overview.........................................................................................173
Testing the directionality of the distance protection........................173
Section 11 Commissioning and maintenance of the fault
clearing system............................................................ 177
Commissioning tests...................................................................... 177
Periodic maintenance tests............................................................ 177
Visual inspection........................................................................178
Maintenance tests..................................................................... 178
Preparation...........................................................................178
Recording............................................................................. 179
Secondary injection.............................................................. 179
Alarm test............................................................................. 179
Self supervision check..........................................................179
Trip circuit check.................................................................. 179
Table of contents
Line distance protection REL650 2.2 IEC 7
Commissioning manual
Measurement of service currents......................................... 180
Restoring.............................................................................. 181
Section 12 Troubleshooting............................................................183
Checking the self supervision signals.............................................183
Checking the self supervision function...................................... 183
Determine the cause of an internal failure............................183
Self supervision HMI data..........................................................183
General IED status............................................................... 183
Fault tracing....................................................................................184
Internal fault indications.............................................................184
Using front-connected PC......................................................... 185
Diagnosing the IED status via the LHMI hint menu................... 186
Repair instruction............................................................................188
Repair support................................................................................ 189
Maintenance................................................................................... 189
Section 13 Glossary....................................................................... 191
Table of contents
8 Line distance protection REL650 2.2 IEC
Commissioning manual
Section 1 Introduction
1.1 This manual
GUID-AB423A30-13C2-46AF-B7FE-A73BB425EB5F v18
The commissioning manual contains instructions on how to commission the IED.
The manual can also be used by system engineers and maintenance personnel for
assistance during the testing phase. The manual provides procedures for the
checking of external circuitry and energizing the IED, parameter setting and
configuration as well as verifying settings by secondary injection. The manual
describes the process of testing an IED in a station which is not in service. The
chapters are organized in the chronological order in which the IED should be
commissioned. The relevant procedures may be followed also during the service
and maintenance activities.
1.2 Intended audience
GUID-C9B8127F-5748-4BEA-9E4F-CC762FE28A3A v11
This manual addresses the personnel responsible for commissioning, maintenance
and taking the IED in and out of normal service.
The commissioning personnel must have a basic knowledge of handling electronic
equipment. The commissioning and maintenance personnel must be well
experienced in using protection equipment, test equipment, protection functions
and the configured functional logics in the IED.
1MRK 506 383-UEN A Section 1
Introduction
Line distance protection REL650 2.2 IEC 9
Commissioning manual
1.3 Product documentation
1.3.1 Product documentation set
GUID-3AA69EA6-F1D8-47C6-A8E6-562F29C67172 v15
IEC07000220-4-en.vsd
P
l
a
n
n
i
n
g
&
p
u
r
c
h
a
s
e
E
n
g
i
n
e
e
r
i
n
g
I
n
s
t
a
l
l
i
n
g
C
o
m
m
i
s
s
i
o
n
i
n
g
O
p
e
r
a
t
i
o
n
M
a
i
n
t
e
n
a
n
c
e
D
e
c
o
m
m
i
s
s
i
o
n
i
n
g
D
e
i
n
s
t
a
l
l
i
n
g
&
d
i
s
p
o
s
a
l
Application manual
Operation manual
Installation manual
Engineering manual
Communication
protocol manual
Cyber security
deployment guideline
Technical manual
Commissioning manual
IEC07000220 V4 EN-US
Figure 1: The intended use of manuals throughout the product lifecycle
The engineering manual contains instructions on how to engineer the IEDs using
the various tools available within the PCM600 software. The manual provides
instructions on how to set up a PCM600 project and insert IEDs to the project
structure. The manual also recommends a sequence for the engineering of
protection and control functions, LHMI functions as well as communication
engineering for IEC 60870-5-103, IEC 61850, DNP3, LON and SPA.
The installation manual contains instructions on how to install the IED. The
manual provides procedures for mechanical and electrical installation. The chapters
are organized in the chronological order in which the IED should be installed.
The commissioning manual contains instructions on how to commission the IED.
The manual can also be used by system engineers and maintenance personnel for
assistance during the testing phase. The manual provides procedures for the
checking of external circuitry and energizing the IED, parameter setting and
configuration as well as verifying settings by secondary injection. The manual
Section 1 1MRK 506 383-UEN A
Introduction
10 Line distance protection REL650 2.2 IEC
Commissioning manual
describes the process of testing an IED in a station which is not in service. The
chapters are organized in the chronological order in which the IED should be
commissioned. The relevant procedures may be followed also during the service
and maintenance activities.
The operation manual contains instructions on how to operate the IED once it has
been commissioned. The manual provides instructions for the monitoring,
controlling and setting of the IED. The manual also describes how to identify
disturbances and how to view calculated and measured power grid data to
determine the cause of a fault.
The application manual contains application descriptions and setting guidelines
sorted per function. The manual can be used to find out when and for what purpose
a typical protection function can be used. The manual can also provide assistance
for calculating settings.
The technical manual contains operation principle descriptions, and lists function
blocks, logic diagrams, input and output signals, setting parameters and technical
data, sorted per function. The manual can be used as a technical reference during
the engineering phase, installation and commissioning phase, and during normal
service.
The communication protocol manual describes the communication protocols
supported by the IED. The manual concentrates on the vendor-specific
implementations.
The point list manual describes the outlook and properties of the data points
specific to the IED. The manual should be used in conjunction with the
corresponding communication protocol manual.
The cyber security deployment guideline describes the process for handling cyber
security when communicating with the IED. Certification, Authorization with role
based access control, and product engineering for cyber security related events are
described and sorted by function. The guideline can be used as a technical
reference during the engineering phase, installation and commissioning phase, and
during normal service.
1.3.2 Document revision history
GUID-C8027F8A-D3CB-41C1-B078-F9E59BB73A6C v4
Document revision/date
History
–/May 2017 First release
1MRK 506 383-UEN A Section 1
Introduction
Line distance protection REL650 2.2 IEC 11
Commissioning manual
1.3.3 Related documents
GUID-94E8A5CA-BE1B-45AF-81E7-5A41D34EE112 v5
Documents related to REL650 Document numbers
Application manual 1MRK 506 381-UEN
Commissioning manual 1MRK 506 383-UEN
Product guide 1MRK 506 384-BEN
Technical manual 1MRK 506 382-UEN
Type test certificate 1MRK 506 384-TEN
650 series manuals Document numbers
Operation manual 1MRK 500 128-UEN
Engineering manual 1MRK 511 420-UEN
Installation manual 1MRK 514 027-UEN
Communication protocol manual, DNP3 1MRK 511 413-UUS
Communication protocol manual, IEC
60870-5-103
1MRK 511 416-UEN
Communication protocol manual, IEC 61850
Edition 1
1MRK 511 414-UEN
Communication protocol manual, IEC 61850
Edition 2
1MRK 511 415-UEN
Communication protocol manual, LON 1MRK 511 417-UEN
Communication protocol manual, SPA 1MRK 511 418-UEN
Point list manual, DNP3 1MRK 511 419-UUS
Accessories guide IEC: 1MRK 514 012-UEN
ANSI: 1MRK 514 012-UUS
Cyber security deployment guideline 1MRK 511 421-UEN
Connection and Installation components 1MRK 513 003-BEN
Test system, COMBITEST 1MRK 512 001-BEN
Application guide, Communication set-up 1MRK 505 382-UEN
1.4 Document symbols and conventions
1.4.1 Symbols
GUID-2945B229-DAB0-4F15-8A0E-B9CF0C2C7B15 v12
The electrical warning icon indicates the presence of a hazard
which could result in electrical shock.
The warning icon indicates the presence of a hazard which could
result in personal injury.
Section 1 1MRK 506 383-UEN A
Introduction
12 Line distance protection REL650 2.2 IEC
Commissioning manual
The caution hot surface icon indicates important information or
warning about the temperature of product surfaces.
Class 1 Laser product. Take adequate measures to protect the eyes
and do not view directly with optical instruments.
The caution icon indicates important information or warning related
to the concept discussed in the text. It might indicate the presence
of a hazard which could result in corruption of software or damage
to equipment or property.
The information icon alerts the reader of important facts and
conditions.
The tip icon indicates advice on, for example, how to design your
project or how to use a certain function.
Although warning hazards are related to personal injury, it is necessary to
understand that under certain operational conditions, operation of damaged
equipment may result in degraded process performance leading to personal injury
or death. It is important that the user fully complies with all warning and
cautionary notices.
1.4.2 Document conventions
GUID-96DFAB1A-98FE-4B26-8E90-F7CEB14B1AB6 v6
Abbreviations and acronyms in this manual are spelled out in the glossary. The
glossary also contains definitions of important terms.
Push button navigation in the LHMI menu structure is presented by using the
push button icons.
For example, to navigate between the options, use
and .
HMI menu paths are presented in bold.
For example, select Main menu/Settings.
LHMI messages are shown in Courier font.
For example, to save the changes in non-volatile memory, select Yes and
press
.
Parameter names are shown in italics.
For example, the function can be enabled and disabled with the Operation
setting.
Each function block symbol shows the available input/output signal.
1MRK 506 383-UEN A Section 1
Introduction
Line distance protection REL650 2.2 IEC 13
Commissioning manual
the character ^ in front of an input/output signal name indicates that the
signal name may be customized using the PCM600 software.
the character * after an input signal name indicates that the signal must
be connected to another function block in the application configuration
to achieve a valid application configuration.
Logic diagrams describe the signal logic inside the function block and are
bordered by dashed lines.
Signals in frames with a shaded area on their right hand side represent
setting parameter signals that are only settable via the PST, ECT or
LHMI.
If an internal signal path cannot be drawn with a continuous line, the
suffix -int is added to the signal name to indicate where the signal starts
and continues.
Signal paths that extend beyond the logic diagram and continue in
another diagram have the suffix ”-cont.”
Illustrations are used as an example and might show other products
than the one the manual describes. The example that is illustrated is
still valid.
1.5 IEC 61850 edition 1 / edition 2 mapping
GUID-C5133366-7260-4C47-A975-7DBAB3A33A96 v4
Function block names are used in ACT and PST to identify functions. Respective
function block names of Edition 1 logical nodes and Edition 2 logical nodes are
shown in the table below.
Table 1: IEC 61850 edition 1 / edition 2 mapping
Function block name
Edition 1 logical nodes Edition 2 logical nodes
AGSAL AGSAL
SECLLN0
AGSAL
ALMCALH ALMCALH ALMCALH
ALTIM - ALTIM
ALTMS - ALTMS
ALTRK - ALTRK
BRCPTOC BRCPTOC BRCPTOC
BTIGAPC B16IFCVI BTIGAPC
CCPDSC CCRPLD CCPDSC
CCRBRF CCRBRF CCRBRF
CCSSPVC CCSRDIF CCSSPVC
CMMXU CMMXU CMMXU
CMSQI CMSQI CMSQI
Table continues on next page
Section 1 1MRK 506 383-UEN A
Introduction
14 Line distance protection REL650 2.2 IEC
Commissioning manual
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155
  • Page 156 156
  • Page 157 157
  • Page 158 158
  • Page 159 159
  • Page 160 160
  • Page 161 161
  • Page 162 162
  • Page 163 163
  • Page 164 164
  • Page 165 165
  • Page 166 166
  • Page 167 167
  • Page 168 168
  • Page 169 169
  • Page 170 170
  • Page 171 171
  • Page 172 172
  • Page 173 173
  • Page 174 174
  • Page 175 175
  • Page 176 176
  • Page 177 177
  • Page 178 178
  • Page 179 179
  • Page 180 180
  • Page 181 181
  • Page 182 182
  • Page 183 183
  • Page 184 184
  • Page 185 185
  • Page 186 186
  • Page 187 187
  • Page 188 188
  • Page 189 189
  • Page 190 190
  • Page 191 191
  • Page 192 192
  • Page 193 193
  • Page 194 194
  • Page 195 195
  • Page 196 196
  • Page 197 197
  • Page 198 198
  • Page 199 199
  • Page 200 200
  • Page 201 201
  • Page 202 202
  • Page 203 203
  • Page 204 204
  • Page 205 205
  • Page 206 206
  • Page 207 207
  • Page 208 208

ABB REL650 series Commissioning Manual

Type
Commissioning Manual

Ask a question and I''ll find the answer in the document