U11I Rugged Tablet Expansion Modules Card 54

Durabook U11I Rugged Tablet Expansion Modules Card 54 User manual

  • Hello! I've reviewed the user manual for the DURABOOK U11I Card 54 expansion module. This document provides guidance on installing the Card 54 module, including steps for removing the CTO door, connecting the harness, and securing the module with specified screws. I'm ready to assist with any questions you might have regarding these instructions.
  • What should I do if any item is damaged?
    What do I need to remove before installing any expansion modules?
    How many screws are used to secure the CTO door plate to the lower case?
    How many screws are used to secure the Card 54 module to the lower case?
©2021 Twinhead International Corp and/or its affiliates. All rights reserved.
1
U11I Rugged Tablet
Expansion Modules
Card 54
P/N: 62+030970+10
U11I Expansion Modules Card 54
2
Package Contents
If any of following items is damaged, please contact your retailer.
Card 54 module
CTO door plate
Screw & O RING
(8+6+2+8)
or
Card 54 Module Screws
Screw Name
Quantity
ISOT-M2.0X3L
8 (CTO door plate to lower case)
ISOT-M2.6X4L
2 (module to lower case)
M2.6X12L
& O RING
6 (module to lower case)
NOTE
The pictures are for reference only, actual items may slightly differ.
U11I Expansion Modules Card 54
3
Installation
This section will guide you on how to install the expansion modules to your tablet
PC.
Note: Make sure to remove the battery before installing any type of expansion
modules. For more information on how to remove/install the battery, please refer
to the tablet PC service guide.
Installing the Card 54 Module
To install the Card 54 module, follow the steps below:
1. Remove the 2 screw securing the CTO door to the lower case.
2. Slide the CTO door to the left to disengage it from the tabs.
U11I Expansion Modules Card 54
4
3. Remove the CTO door.
4. Remove the CTO door seal out of its compartment.
5. Slide the knob to the right to unlock the CTO box door.
U11I Expansion Modules Card 54
5
6. Open the CTO box door.
7. Connect the Card 54 module harness to the mainboard connector.
8. By aligning with the screw holes, install the CTO door plate onto its
compartment on the lower case. Make sure the rubber washers are properly
seated into their respective screw holes.
U11I Expansion Modules Card 54
6
9. Attach the 8 screws to secure the CTO door plate to the lower case.
10. Fold and place the excess cable of the Card 54 module harness into the gap
for proper cable routing.
11. By aligning with the screw holes, install the Card 54 module onto its slot on
the lower case.
U11I Expansion Modules Card 54
7
12. Attach the 8 screws to secure the Card 54 module to the lower case.
M2.6X12L & O RING (marked with blue-white circle): 6 screws
ISOT-M2.6X4L (marked with orange-white circle): 2 screws
13. Close the CTO box door.
14. Slide the knob to the left to lock the CTO box door.
U11I Expansion Modules Card 54
8
Card 54 Module Screws
Screw Name
Quantity
Torque
ISOT-M2.0X3L
8 (CTO door plate to
lower case)
2.0 ± 0.2 Kgf-cm
ISOT-M2.6X4L
2 (module to lower
case)
2.5 ± 0.2 Kgf-cm
M2.6X12L
& O RING
6 (module to lower
case)
2.5 ± 0.2 Kgf-cm
Twinhead International Corp.
11F, No.550, Ruiguang Rd., Neihu, Taipei 11492, Taiwan, R.O.C.
/